119TH ACNW MEETING, June 13-15, 2000
June 6, 2000
SCHEDULE AND OUTLINE FOR DISCUSSION
119TH ACNW MEETING
JUNE 13-15, 2000
TUESDAY, JUNE 13, 2000, CONFERENCE ROOM T2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | ||||
1) | 8:30 - 8:40 A.M. | Opening Statement (Open) (BJG/RKM) | ||
The Chairman will open the meeting with brief opening remarks, outline the topics to be discussed, and indicate several items of interest. | ||||
2) | 8:40 - 10:30 A.M. | ACNW Planning and Procedures (Open) (BJG/RKM) | ||
The Committee will review items under consideration at this meeting and: | ||||
2.1) | Review issues that will be brought before the Committee on July and September of 2000 (RKM) | |||
2.2) | Discuss Working Group meeting plans and use of Consultants (RKM) | |||
2.3) | Nominate and elect ACNW officers for the next year (RKM) | |||
2.4) | Summary of NWTRB meeting (ML/LGD) | |||
2.5) | Meetings with NRC Staff on YMRP (LGD) | |||
2.6) | Summary of KTI resolution meeting (JDR) | |||
10:30 - 10:45 A.M. | ***BREAK*** | |||
3) | 10:45 - 12:30 P.M. | Low-Level Waste, Branch Technical Position (BTP) on Performance Assessment (Open) (BJG/ACC/JDR) | ||
The ACNW will review and comment on the final draft version of this BTP | ||||
3.1) | Summary of BTP | |||
3.2) | Summary of public comments | |||
3.3) | Roundtable discussion | |||
3.4) | Elements of an ACNW report | |||
12:30 - 1:30 P.M. | ***LUNCH*** | |||
4) | 1:30 - 3:00 P.M. | West Valley Policy (Open) (RGW/JDR) | ||
The Committee will hear and discuss the results of public comments on a draft policy statement on decommissioning criteria for the West Valley Demonstration Project (Jack Parrot) | ||||
4.1) | Background and current proposal for license termination | |||
4.2) | Results of public comments | |||
4.3) | Future plans | |||
4.4) | Roundtable discussion | |||
4.5) | Possible elements for an ACNW report | |||
3:00 - 3:15 P.M. | ***BREAK*** | |||
5) | 3:15 - 5:15 P.M. | ACNW Site Suitability and License Application - Task Action Plan (Open) (GMH/LGD) | ||
The ACNW will discuss plans for its own review of the Yucca Mountain Site Suitability and License Application Process. | ||||
5.1) | Propose and Objections | |||
5.2) | Scope and Strategy | |||
5.3) | Assignments | |||
5.4) | Discussion | |||
5:15 P.M. | ***RECESS*** | |||
WEDNESDAY, JUNE 14, 2000, TWO WHITE FLINT NORTH, ROOM 2B3, 11545 ROCKVILLE PIKE, ROCKVILLE, MARYLAND | ||||
6) | 8:30 - 8:35 A.M. | Opening Statement by Chairman (Open) | ||
7) | 8:35 - 10:30 A.M. | Proposed Yucca Mountain Repository Design Features (Open) (ML/RKM) | ||
Representatives from DOE will present the status of the design for the proposed high-level waste repository at Yucca Mountain. The latest engineered features will be discussed - Paul Harrington, DOE. | ||||
10:30 - 10:45 A.M. | ***BREAK*** | |||
8) | 10:45 - 12:00 NOON | Department of Energy's (DOE) Repository Safety Strategy (Open) (GMH/LGD) | ||
8.1) | Discussion of the evolving Rev. 4 of the Yucca Mountain repository safety strategy | |||
8.2) | A comparison of DOE's principal factors to NRC's key technical issues - Jack Bailey, M&O | |||
9) | 12:00 - 12:30 P.M. | Yucca Mountain Specific Siting Guidelines 10CFR Part 963 (GMH/AXS) - Presentation by the DOE - Carol Hanlon, DOE | ||
12:30 - 1:30 P.M. | ***LUNCH*** | |||
10) | 1:30 - 3:00 P.M. | Status of the NRC LLW Program (Open) (RGW/HJL) | ||
The Committee will review the status of the NRC's Low-Level radioactive waste program with representative of the staff's Uranium Recovery and Low-Level Waste Branch - Jim Kennedy/Tom Essig, NRC, NMSS, URLL | ||||
3:00 - 3:15 P.M. | ***BREAK*** | |||
11) | 3:15 - 5:00 P.M. | Preparation of ACNW Reports (Open) | ||
The Committee will discuss planned reports on the following topics: | ||||
11.1) | Risk-Informed Approaches to Nuclear Materials Regulatory Application (JNS) | |||
11.2) | Comments on NRC's plans to provide sufficiency comments on the Yucca Mountain Site Recommendation Consideration Report (LGD) | |||
11.3) | Comments on DG-1067 and DG-1071 (decommissioning regulatory guides) (RKM) | |||
11.4) | Comments on the LLW BTP on Performance Assessment (ACC) | |||
11.5) | Highlights of the visit to the U.K. and France (HJL/ACC) | |||
11.6) | West Valley Decommissioning Policy (JDR) | |||
5:00 P.M. | ***RECESS*** | |||
THURSDAY, JUNE 15, 2000, TWO WHITE FLINT NORTH, ROOM 2B3, 11545 ROCKVILLE PIKE, ROCKVILLE, MARYLAND | ||||
12) | 8:30 - 8:35 A.M. | Opening Statement by Chairman (Open) (BJG/RKM) | ||
13) | 8:35 - 9:30 A.M. | Meeting with the Director of the Division of Waste Management, Office of Nuclear Material Safety and Safeguards (Open) (BJG/RKM) | ||
The Committee will meet with the Director to discuss items of mutual interest | ||||
14) | 9:30 - 10:30 A.M. | Review Draft Regulatory Guides (Open) (RGW/RKM) | ||
The Committee will discuss two draft regulatory guides (Phillip Ray, NRR) | ||||
14.1) | DG-1067, "Decommissioning of Nuclear Power Reactors" | |||
14.2) | DG-1071, "Standard Format and Content for Post-Shutdown Decommissioning Activities" | |||
14.3) | Elements of an ACNW report | |||
10:30 - 10:45 A.M. | ***BREAK*** | |||
15) | 10:45 - 5:00 P.M. | Complete ACNW Reports (Open) | ||
Complete preparation of ACNW reports noted in item 11. | ||||
5:00 P.M. | ADJOURN |