118th ACNW MEETING, March 27-29, 2000
This is a preliminary draft: ACNW schedules are subject to change. Presentations are frequently canceled or rescheduled to another day. If such a change would result in significant inconvenience or hardship, be sure to verify the schedule with Mr. Richard Major at (301) 415-7366 between 8:30 a.m. and 5:00 p.m., several days prior to the meeting.
DRAFT: March 3, 2000
SCHEDULE AND OUTLINE FOR DISCUSSION
118TH ACNW MEETING
MARCH 27-29, 2000
MONDAY, MARCH 27, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | |||||
---|---|---|---|---|---|
1.) | 8:30 - 8:40 A.M. | Opening Statement (Open) (BJG/RKM) | |||
The Chairman will open the meeting with brief opening remarks, outline the topics to be discussed, and indicate several items of interest. | |||||
2.) | 8:40 - 10:30 A.M. | Preparation of ACNW Reports (Open) | |||
The Committee will discuss planned reports on the following topics: | |||||
2.1) | 10CFR Part 63, NRC's High-Level Waste Regulation (BJG/LGD) | ||||
2.2) | Defense In-Depth (GMH/JDR) | ||||
2.3) | ACNW Action Plan (BJG/RKM) | ||||
2.4) | ACNW Self-Assessment (BJG/RPS) | ||||
2.5) | Comments on Site Sufficiency Strategy (tentative) (GMH/LGD) | ||||
10:30 - 10:45 A.M. | ***BREAK*** | ||||
3.) | 10:45 - 12:15 P.M. | ACNW Planning and Procedures (Open) (BJG/RKM) | |||
3.1) | Discuss plans for visit to U.K. and France (May 15-20, 2000) | ||||
3.2) | Issues before the Committee in June and July | ||||
3.3) | Use of Consultants | ||||
3.4) | Working Group meetings planned | ||||
12:15 - 1:30 P.M. | ***LUNCH*** | ||||
4.) | 1:30 - 3:30 P.M. | Activities of NRC's Spent Fuel Program Office (SFPO) (Open) (ML/RKM) | |||
4.1) | Introduction | ||||
4.2) | Overview of SFPO activities and initiatives underway | ||||
4.3) | Transportation of Radioactive Material (Modal Study status) | ||||
4.4) | Discussion with Representatives of the Department of Transportation on issues associated with transportation of radioactive material. | ||||
3:30 - 3:45 P.M. | ***BREAK*** | ||||
5.) | 3:45 - 5:00 P.M. | Continue Preparation of ACNW Reports (Open) | |||
Continue preparation of ACNW reports noted in item 2. | |||||
5:00 P.M. | RECESS | ||||
TUESDAY, MARCH 28, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | |||||
6.) | 8:30 - 8:35 A.M. | Opening Statement by Chairman (Open) | |||
7.) | 8:35 - 10:00 A.M. | NRC Strategy for Site Sufficiency (Open) (GMH/LGD) | |||
7.1) | Review the NRC staffs plans for the development of a strategy to produce site characterization sufficiency comments on the DOE's Site Recommendation for Yucca Mountain | ||||
7.2) | Discuss elements of a possible ACNW report on this topic. | ||||
10:00 - 10:15 A.M. | ***BREAK*** | ||||
8.) | 10:15 - 12:00 NOON | DOE-NRC Technical Exchange (Open) (RGW/JDR) | |||
8.1) | The NRC staff will present a summary of a March 14-15, 2000, DOE-NRC technical exchange on the path forward for resolution of Yucca Mountain key technical issues and sub-issues | ||||
8.2) | Discuss elements of a possible ACNW report on this topic. | ||||
12:00 - 1:00 P.M. | ***LUNCH*** | ||||
9.) | 1:00 - 2:00 P.M. | Yucca Mountain Review Plan (Open) (RGW/JDR) | |||
The NRC staff will present a periodic briefing on the development of the YMRP. Emphasis will be on the post closure sections of the plan. | |||||
10.) | 2:00 - 3:00 P.M. | Radionuclide Content by Slag (Open) (RGW/JDR) | |||
Review a project by Research on the radioactive content of slag, which is produced as a by product of the manufacture of metals. | |||||
11.) | 3:15 - 5:00 P.M. | Continue Preparation of ACNW Report (Open) | |||
Continue preparation of ACNW reports noted in item 2. | |||||
5:00 P.M. | RECESS | ||||
WEDNESDAY, MARCH 29, 2000, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | |||||
12.) | 8:30 - 8:35 A.M. | Opening Remarks by ACNW Chairman | |||
13.) | 8:35 - 9:30 A.M. | Meeting with the Director of the Division of Waste Management, Office of Nuclear Material Safety and Safeguards (Open) ( BJG/RKM) | |||
The Committee will meet with the Director to discuss items of mutual interest. | |||||
14.) | 9:30 - 2:00 P.M. | Complete ACNW Reports (Open) | |||
Complete preparation of ACNW reports noted in item 2. | |||||
2:00 P.M. | ADJOURN | ||||
NOTE:
- Presentation time should not exceed 50 percent of the total time allocated for a specific item. The remaining 50 percent of the time is reserved for discussion.
- Number of copies of the presentation materials to be provided to the ACNW - 35.
Page Last Reviewed/Updated Thursday, September 28, 2017