Purpose
The purpose of this meeting between Pacific Gas and Electric Company (PG&E, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to provide information regarding a proposed removal of Limiting Condition for Operation 3.0.4b from the Actions Note in Technical Specification (TS) 3.5.3, "ECCS [emergency core cooling systems] - Shutdown"; TS 3.7.5, "Auxiliary Feedwater (AFW) System"; and TS 3.8.1, "AC [alternating current] Sources - Operating," for Diablo Canyon Nuclear Power Plant, Units 1 and 2, using the Risk-Informed Process for Evaluation (RIPE). Publicly available presentation slides for this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML26077A278.
Meeting Feedback
Meeting Dates and Times
04/01/26, 10AM - 11AM EDT
Meeting Location
NRC One White Flint North
11555 Rockville Pike
O-5B4
Rockville, MD
Webinar
Webinar Meeting Number: 213 043 910 576 9
Webinar Password: wi9yC9VN
Contact
Samson Lee
(301) 415-3168
Participation Level
Observation
NRC Participants
Office of Nuclear Reactor Regulation
External Participants
Pacific Gas and Electric
Docket Numbers - Facility Names
05000275 - Diablo Canyon 1
05000323 - Diablo Canyon 2
Teleconference
Bridge Number: 3015762978
Passcode: 101942356#