Purpose
The purpose of this meeting between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority (TVA) is to discuss the planned license amendment request to revise applicable technical specifications by making use of Analysis and Measurement Services Corporation online monitoring (OLM) methodology as the technical basis to switch from time-based surveillance frequency for channel calibrations to a condition-based calibration frequency based on OLM results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2.
Meeting Feedback
Meeting Dates and Times
10/16/24, 1PM - 2PM EDT
Meeting Location
Teleconference
Webinar
Webinar Meeting Number: 255 929 140 041
Webinar Password: etcS6E
Contact
Rachael Davis
(301) 415-0805
Perry Buckberg
(301) 415-1383
Kimberly Green
(301) 415-1627
Participation Level
Partially Closed
NRC Participants
NRC Staff
External Participants
Tennessee Valley Authority
Joseph Ashcraft
Kim Green
Russ Wells
Tarico Sweat
Gilberto Blas Rodriguez
Rachael Davis
Shawna Hughes
Docket Numbers - Facility Names
05000327 - Sequoyah 1
05000328 - Sequoyah 2
05000390 - Watts Bar 1
05000391 - Watts Bar 2
Teleconference
Bridge Number: 3015762978
Passcode: 657 545 7
Conference ID: 657 545 7
Comments
Interested members of the public can participate in the meeting via Microsoft Teams or by phone. The URL address and phone number are listed above. For additional details, please call the NRC meeting contact listed on the NRC Public Meeting Schedule.