Skip to main content

Public Meeting Schedule: Meeting Details

Meeting Info

Purpose
The purpose of this presubmittal meeting, between Entergy Operations, Inc. (Entergy, the licensee) and the U.S. Nuclear Regulatory Commission (NRC) staff, is to discuss the proposed license amendment request to revise applicable Technical Specifications by making use of Analysis and Measurement Services Corporation (AMS) online monitoring (OLM) methodology as the technical basis to switch from time-based surveillance frequency for channel calibrations to a condition-based calibration frequency based on OLM results for Arkansas Nuclear One, Units 1 and 2; Grand Gulf Nuclear Station, Unit 1; River Bend Station, Unit 1; and Waterford Steam Electric Station, Unit 3 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23348A357). The proposed change is based on the NRC-approved topical report AMS-TR-0720R2-A, “Online Monitoring Technology to Extend Calibration Intervals of Nuclear Plant Pressure Transmitters” (ML21235A493).
Meeting Dates and Times
01/17/24, 1PM - 2PM EST
Meeting Location
Webinar

Contact
Thomas J. Wengert
(301) 415-4037
Siva P. Lingam
(301) 415-1564
Participation Level
Observation
NRC Participants
Office of Nuclear Reactor Regulation
External Participants
Entergy Operations Inc
T. Wengert
P. Couture
C. Peabody
C. Mahan
D. Williams
J. Ashcraft
T. Sweat
Docket Numbers - Facility Names
05000313 - Arkansas Nuclear 1
05000368 - Arkansas Nuclear 2
05000382 - Waterford 3
05000416 - Grand Gulf 1
05000458 - River Bend 1
Related Documents
ML23348A357 - Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML23348A357 - Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML23348A357 - Arkansas Nuclear One, Units 1 and 2, River Bend, Unit 1, Grand Gulf, Unit 1, Waterford, Unit 3, Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting
ML24011A081 - 01/17/2024 Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request (EPID L-2023-LRM-0110)
Teleconference
Bridge Number: 3015762978
Passcode: 31633656#
Conference ID: N/A

Page Last Reviewed/Updated Thursday, January 11, 2024

Page Last Reviewed/Updated Thursday, January 11, 2024