Purpose
The purpose of this pre-submittal teleconference with the NRC staff is to discuss a proposed LAR to modify the PBNP, Units 1 and 2 licensing basis for TMP. In a May 1, 2018, pre-submittal meeting, NextEra described its plan to submit the Point Beach high winds probabilistic risk assessment (PRA) as the basis for eliminating the spectrum of high wind events as a site hazard. However, they have recently decided to simply request authorization to incorporate original construction design information into the licensing basis description of TMP. This subsequent pre-submittal meeting will address resolution of the non-conformances currently under enforcement discretion (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18105A305).
Meeting Feedback
Meeting Dates and Times
12/04/19, 10:30AM - 11:30AM EST
Meeting Location
NRC One White Flint North
11555 Rockville Pike
08B-02
Rockville, MD
Contact
Mahesh Chawla
(301) 415-8371
Robert Kuntz
(301) 415-3733
Participation Level
Category 1
NRC Participants
Office of Nuclear Reactor Regulation
Region III
External Participants
NextEra Energy Point Beach, LLC
NextEra Energy, FPL
Rob Kuntz
Brian Wittick
Mahesh Chawla
Steve Jones
Steve Catron
Jarrett Mack
Gordon Curran
Mehdi Reisi-Fard
Eric Schultz
Tom Hartman
Tom Schneider
Docket Numbers - Facility Names
05000266 - Point Beach 1
05000301 - Point Beach 2
Teleconference
Bridge Number: 8889727807
Passcode: 33462