Purpose
To discuss Branch Technical Position (BTP) 3-4 criteria for postulating pipe rupture locations and proposed alternatives.
Meeting Feedback
Meeting Dates and Times
06/11/19, 1PM - 5PM EDT
Meeting Location
NRC Two White Flint North
11545 Rockville Pike
06D02
Rockville, MD
Contact
Michael Benson
(301) 415-2425
Robert Tregoning
(301) 415-2324
Participation Level
Category 2
Teleconference
Bridge Number: 8774175615
Passcode: 21055