Purpose
To discuss a potential license amendment request concerning the revision of interim power level steps in the event of a degraded feedwater flow line Leading Edge Flowmeter (LEFM) operational status. Discussion will include the technical, operational, and regulatory strategy Exelon Generation Company, LLC is intending to pursue to support adding additional power level steps to the LEFM actions in the Technical Requirements Manual.
Meeting Feedback
Meeting Dates and Times
05/31/18, 1PM - 2:30PM EDT
Meeting Location
NRC One White Flint North
11555 Rockville Pike
O9-B4
Rockville, MD
Contact
Jenny Tobin
(301) 415-2328
Participation Level
Category 2
Docket Numbers - Facility Names
05000277 - Peach Bottom 2
05000278 - Peach Bottom 3
Teleconference
Bridge Number: 8886599574
Passcode: 33560