Purpose
• SRP Ch. 3.9.2 - The need for and schedule for the separate effects testing to benchmark the Comprehensive Vibration Analysis Program
• SRP Ch. 3.9.4 - The control rod drive mechanisms (CRDMs) level of detail and testing plans/schedule
• SRP Ch. 3.9.6 - Emergency core cooling system (ECCS) and Containment Valve Design, Qualification, and First-Of-A-Kind Testing
• SRP Ch. 3.6.2 – Impingement Shield Restraint testing and schedule and break locations/exclusion area
• SRP Ch. 3.9.4 - The control rod drive mechanisms (CRDMs) level of detail and testing plans/schedule
• SRP Ch. 3.9.6 - Emergency core cooling system (ECCS) and Containment Valve Design, Qualification, and First-Of-A-Kind Testing
• SRP Ch. 3.6.2 – Impingement Shield Restraint testing and schedule and break locations/exclusion area
Meeting Feedback
Meeting Dates and Times
* Date/Time Change *
05/02/17, 10:30AM - 12PM EDT
Meeting Location
Teleconference
Contact
Gregory Cranston
(301) 415-5046
Demetrius Murray
(301) 415-7646
Participation Level
Category 1
NRC Participants
Office of New Reactors
External Participants
NuScale Power LLC
Docket Numbers - Facility Names
05200048 - NUSCALE POWER REACTOR
Comments