Purpose
The purpose is for Flowserve to discuss a topical report submittal with the NRC staff related to a probabilistic risk assessment (PRA) model for Flowserve N-Seal packages with the Abeyance Seal installed in Westinghouse Reactor Coolant Pumps (RCPs).
Meeting Feedback
Meeting Dates and Times
09/14/16, 9AM - 11AM EDT
Meeting Location
NRC One White Flint North
11555 Rockville Pike
03B04
Rockville, MD
Contact
Brian Benney
(301) 415-2767
Joseph Holonich
(301) 415-7297
Participation Level
Category 2
NRC Participants
NRC Staff
External Participants
NextEra Energy, FPL
Brian Benney
Steve Catron
Teleconference
Bridge Number: 8884551734
Passcode: 28927