Purpose
The purpose of this meeting is to discuss the technical results of NRC's acceptance review and path forward for Topical Report WCAP-17938, "AP1000 In-Containment Cables and Non-Metallic Insulation Debris Integrated Assessment. The meeting will be open to the public from 1:00 p.m. to 1:30 p.m. From 1:35 p.m. until 4:00 p.m. the meeting will be closed to the public.
Meeting Feedback
Meeting Dates and Times
06/18/15, 1PM - 4PM EDT
Meeting Location
Westinghouse Offices
11333 Woodglen Drive, Suite 202
Rockville, MD
Contact
Bruce Bavol
(301) 415-6715
Participation Level
Category 2
NRC Participants
Office of New Reactors
External Participants
Westinghouse Electric Company
Bruce Bavol
Shayan Sinha, et al.
Clinton Ashley, et al.
Teleconference
Bridge Number: 8889897566
Passcode: 37160
Comments
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the U.S. Nuclear Regulatory Commission (NRC) at designated points identified on the agenda. Those members of the public interested in participating in this meeting (OPEN portion) should dial the telephone number and passcode listed above followed by the #sign.