Skip to main content

Public Meeting Schedule: Meeting Details

Meeting Info

Purpose
Pre-Submittal Meeting with Duke Energy to discuss Reload Design and Safety Analysis Methodology Report proposed LARs regarding H. B. Robinson Steam Electric Plant, Unit 2 and Shearon Harris Nuclear Power Plant, Unit 1.
Meeting Dates and Times
11/12/14, 1PM - 3PM EST
Meeting Location
NRC One White Flint North

11555 Rockville Pike
07B4
Rockville, MD

Webinar
Webinar Meeting Number: 8889899744
Webinar Password: 51953
Contact
Martha Barillas
(301) 415-2760
Participation Level
Category 1
NRC Participants
Office of Nuclear Reactor Regulation
External Participants
Duke Energy
Robert Elliott
Lisa Regner
Benjamin Parks
Chris Jackson
John Caves
Joshua Duc
Julie Oliver
Robert Harvey
Scott Connely
Docket Numbers - Facility Names
05000261 - Robinson 2
05000400 - Harris 1
Related Documents
ML14311A105 - 11/12/2014 Reload Design and Safety Analysis Methodology Report proposed License Amendment Requests (LARs) by Duke Energy
ML14308A347 - 11/12/2014, Meeting Slide Regarding DPC-NE-2005 Appendices for Robinson and Harris Nuclear Plants.
ML14308A340 - 11/12/2014, Meeting Slide for HB Robinson / Shearon Harris Reload Design and Safety Analysis Methodology Report.
Teleconference
Bridge Number: 8889899744
Passcode: 51953
Comments
Members of the public interested in participating in the OPEN PORTION of this
meeting should dial the number stated. After putting in the passcode press the # sign. The meeting is open to the public 1:00 PM-1:30 PM and 2:00 PM-2:55 PM. The meeting will be closed to the public between 1:30 PM-2:00 PM.

Page Last Reviewed/Updated Friday, November 07, 2014

Page Last Reviewed/Updated Friday, November 07, 2014