Purpose
Pre-Submittal Meeting with Duke Energy to discuss Reload Design and Safety Analysis Methodology Report proposed LARs regarding H. B. Robinson Steam Electric Plant, Unit 2 and Shearon Harris Nuclear Power Plant, Unit 1.
Meeting Feedback
Meeting Dates and Times
11/12/14, 1PM - 3PM EST
Meeting Location
NRC One White Flint North
11555 Rockville Pike
07B4
Rockville, MD
Webinar
Webinar Link: https://www1.gotomeeting.com/register/548354488
Webinar Meeting Number: 8889899744
Webinar Password: 51953
Contact
Martha Barillas
(301) 415-2760
Participation Level
Category 1
NRC Participants
Office of Nuclear Reactor Regulation
External Participants
Duke Energy
Robert Elliott
Lisa Regner
Benjamin Parks
Chris Jackson
John Caves
Joshua Duc
Julie Oliver
Robert Harvey
Scott Connely
Docket Numbers - Facility Names
05000261 - Robinson 2
05000400 - Harris 1
Teleconference
Bridge Number: 8889899744
Passcode: 51953
meeting should dial the number stated. After putting in the passcode press the # sign. The meeting is open to the public 1:00 PM-1:30 PM and 2:00 PM-2:55 PM. The meeting will be closed to the public between 1:30 PM-2:00 PM.