Resolution of Generic Safety Issues: Task IV.A: Strengthen Enforcement Process ( NUREG-0933, Main Report with Supplements 1–35 )
The objective of this task is to substantially improve licensee awareness of and attitude toward safety by vigorous enforcement of NRC rules. The two major aspects of this objective are as follows: (1) assess substantial penalties for licensee failure to report safety-related information or for violations of rules defining safety practices or conditions; (2) adopt criteria for revocation of licenses, sanctions short of revocation, such as probation, and safety violation that would require immediate plant shutdown or other operational safeguards.
ITEM IV.A.1: SEEK LEGISLATIVE AUTHORITY DESCRIPTION
At the time NUREG-066048 was being prepared, the NRC had requested Congressional approval to increase the civil penalty limit to $100,000 for each licensee violation of the rules defining safety practices, with no upper limit on the number of violations. Obtaining approval of authority to increase the civil penalty was included in the TMI Action Plan48 along with a request for staff considera-tion of the desirability of seeking further legislative modifications to: (1) permit civil penalties for a category of actions relating to safety; (2) pro-vide order authority against non-licensees and authority for enforcement sanction (including assessment of civil penalties) against an individual not employed by a licensee; and (3) extend criminal penalties to willful violation of a license condition.In 1980, approval to increase the civil penalty limit was granted by Congress in Public Law 96-295 and is being implemented by the NRC. In that same year, the office of the General Counsel submitted possible legislative proposals to the Commission in SECY-80-366.237 That paper included the first two proposals described above. SECY-80-366237 was withdrawn after Commissioner Offices advised the Secretariat that these legislative proposals were "overtaken by events and no longer served a useful purpose."442 This item is not directly related to public safety and, therefore, is considered a licensing issue.
CONCLUSION
This Licensing Issue has been resolved.
ITEM IV.A 2: REVISE ENFORCEMENT POLICY DESCRIPTION
At the time NUREG-066048 was being prepared, the NRC was in the process of revising its enforcement policy and guidance for the imposition of civil penalties, orders, and other sanctions and consideration was being given to the use of probation as an enforcement action. As a result, the revision to the NRC enforcement policy was included in the TMI Action Plan.48Methods of informing the public, such as forums near plant sites, were to be included in the revised NRC policy. The public and licensees were to be informed of the new policy through information releases and regional meetings. A revised General Statement of Policy was published in the Federal Register234 in March 1982 and all work required by this item has been completed.235, 379, 407 This item is not directly related to public safety and, therefore, is considered a licensing issue.
CONCLUSION
This Licensing Issue has been resolved.