Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Search Results

Displaying 8131 - 8140 of 8196

Event Notification Report for December 11, 2006

… been notified. Power Reactor Event Number: 43040 Facility: POINT BEACH Region: 3 State: WI Unit: [1] [2] [ ] RX Type: [1] … Operations to investigate. A review of the Alarm computer points revealed that the valves opened at 0537 hours. The …

Event Notification Report for September 15, 2005

… devices were found to belong to Alcoa Alumina Atlantic in Point Comfort. An on-site investigation at the licensee's … user at the site of the incident (Dooley Elementary in Long Beach). The RSO contacted Kent Prendergast, Senior HP for … inject, reactor level had risen above the initiation set-point. The RCIC did not receive an initiation signal. …

Technical References

… Strainer Installation During May 12, 2006, Trip to Indian Point 2 04/28/06 Trip Report Regarding Staff Observations of … Regarding Staff Observations of Scaled Flume Testing of the Point Beach Nuclear Plant Proposed Replacement Suction Strainer …

Event Notification Report for August 26, 2005

… Power Reactor Event Number: 41943 Facility: TURKEY POINT Region: 2 State: FL Unit: [3] [4] [ ] RX Type: [3] … has been issued for the southeast Florida coast from Vero Beach southward to Florida City. A Hurricane Warning means …