Power Reactor Status Report for February 7, 2012

Power Reactor Status Report for February 7, 2012 … … GENERATOR WATER LEVEL CONTROL ISSUES. SEE EN #47644 * 1 Clinton 97   100% ELECTRICAL GENERATION     D.C. Cook 1 100 … 2 100         Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …

Event Notification Report for January 13, 2020

… HAS BEEN RETRACTED.THIS EVENT HAS BEEN RETRACTED !!!!! Power Reactor Event Number: 54403 Facility: CLINTON Region: 3     State: IL Unit: [1] [] [] RX Type: [1] … NRC Resident Inspector has been notified." Clinton Power Station has implemented required compensatory actions due to …

Event Notification Report for December 19, 2011

… HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power Reactor Event Number: 47473 Facility: FORT CALHOUN … of this event." Power Reactor Event Number: 47532 Facility: CLINTON Region: 3 State: IL Unit: [1] [ ] [ ] RX Type: [1] … "On 12/18/11 at approximately 0119 CST, Clinton Power Station commenced work to repair a failed hard drive on the …

Event Notification Report for March 2, 1999

… |Power Reactor |Event Number: 35334 | … BEAVER VALLEY REGION: 1 |NOTIFICATION DATE: 01/29/1999| | UNIT: [] [2] [] STATE: PA |NOTIFICATION TIME: 18:55[EST]| | … | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 02/11/1999| | UNIT: … cylinder yoke | | upper flange studs, Clinton Power Station discovered that the torque value | | for the lower …

Power Reactor Status Report for November 22, 2015

Power Reactor Status Report for November 22, 2015 … … 2 100         Byron 1 100         Byron 2 100         Clinton 99   100% ELECTRICAL GENERATION     D.C. Cook 1 100 … 2 100         Callaway 100         Columbia Generating Station 87   INCREASING POWER ROD SEQUENCE EXCHANGE …

Power Reactor Status Report for November 19, 2015

Power Reactor Status Report for November 19, 2015 … …     *   Byron 2 90   REDUCED AT LOAD DISPATCHER REQUEST *   Clinton 99   100% ELECTRICAL GENERATION     D.C. Cook 1 100 … HOLD *   Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …

Power Reactor Status Report for October 31, 2015

Power Reactor Status Report for October 31, 2015 … … ORDER *   Byron 2 71   LOAD DROP PER DISPATCHER ORDER *   Clinton 99   100% ELECTRICAL GENERATION     D.C. Cook 1 100 … IN PROGRESS     Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …

Power Reactor Status Report for February 28, 2014

Power Reactor Status Report for February 28, 2014 … … WEATHER ALERT     Byron 1 100         Byron 2 100         Clinton 98   100% ELECTRICAL CAPABILITY *   D.C. Cook 1 100 … 2 100         Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …

Power Reactor Status Report for March 12, 2016

Power Reactor Status Report for March 12, 2016 … UNEVALUATED … 2 100         Byron 1 100         Byron 2 100         Clinton 99   100% ELECTRICAL CAPABILITY     D.C. Cook 1 100 … 2 100         Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …

Power Reactor Status Report for August 3, 2003

Power Reactor Status Report for August 3, 2003 … UNEVALUATED … 2 100         Byron 1 100         Byron 2 100         Clinton 93   100% ELECTRICAL CAPABILITY     D.C. Cook 1 100 … 2 100         Callaway 100         Columbia Generating Station 100         Comanche Peak 1 100         Comanche …