Power Reactor Status Report for February 28, 2005

… TO REFUELING OUTAGE *   Browns Ferry 3 100         Brunswick 1 92   INCREASING POWER *   Brunswick 2 82   … 2 100         Davis-Besse 100         Dresden 2 96   100% ELECTRICAL CAPABILITY     Dresden 3 90   INCREASING POWER … LINE - SEE EVENT # 41447 *   Prairie Island 1 1   WARMING STEAM LINES *   Prairie Island 2 100         Quad Cities 1 …

Materials and Metallurgy - March 24, 1999

… Project, to discuss industry and NRC activities related to steam generator tube integrity, the BWRVIP, the PWRMRP, … cracking that was first observed in 1993. That was found at Brunswick Nuclear Power Plant. In 1994, the staff put out … with the process. We actually had to work with General Electric to support the actual pilot applications and some …

Power Reactor Status Report for May 22, 2004

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 100         Brunswick 2 96   MAX POWER ALLOWED   … SCRAM DISCHARGE VOLUME VALVES *   Duane Arnold 94   100% ELECTRICAL CAPACITY     Fermi 2 100         Kewaunee 100     … Island 2 100         Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)     Quad Cities 2 85   LIMITED IN …

Power Reactor Status Report for February 27, 2005

… TO REFUELING OUTAGE     Browns Ferry 3 100         Brunswick 1 64   INCREASING POWER *   Brunswick 2 83   … 2 100         Davis-Besse 100         Dresden 2 96   100% ELECTRICAL CAPABILITY     Dresden 3 66   REDUCED POWER DUE … Island 2 100         Quad Cities 1 83   LIMITED IN POWER (STEAM DRYER MONITORING) REDUCED POWER FOR ROD SHUFFLE *   …

Event Notification Report for November 18, 2011

… was notified." Power Reactor Event Number: 47452 Facility: BRUNSWICK Region: 2 State: NC Unit: [ ] [2] [ ] RX Type: [1] … backwash. While at reduced power an inspection of the main steam tunnel (a normally locked closed high radiation area) … Resident Inspector was onsite and has been notified." The electrical lineup is normal and all safety related equipment …

Power Reactor Status Report for May 23, 2004

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 100         Brunswick 2 96   MAX POWER ALLOWED   … 2 100         Davis-Besse 100         Dresden 2 99   100% ELECTRICAL CAPABILITY *   Dresden 3 100     *   Duane Arnold … Island 2 100         Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)     Quad Cities 2 74   ROD …

Power Reactor Status Report for June 27, 2002

…     BROWNS FERRY 2 100         BROWNS FERRY 3 100         BRUNSWICK 1 94         BRUNSWICK 2 100         CATAWBA 1 100 … 06/22/2002 PLANT HEATUP IN PROGRESS *   CLINTON 1 94   100% ELECTRICAL CAPABILITY     COOK 1 100         COOK 2 100     … CITIES 2 82   HOLDING POWER DUE TO EXCESSIVE CARRYOVER IN STEAM     Region 4 Unit Power Down Reason or Comment Change …

Power Reactor Status Report for September 16, 2007

… 3 100   ATHENS 161KV LINE TO BE TAGGED OUT ON 9/17     Brunswick 1 0 09/07/2007 FORCED MAINTENANCE OUTAGE TO … STUDY COMPLETED. INCREASING POWER *   Vogtle 2 99   100% ELECTRICAL CAPABILITY     Watts Bar 1 100         Region 3 … 3 100         River Bend 1 100         San Onofre 2 99   STEAM GENERATOR LIMITATIONS     San Onofre 3 100         …

Power Reactor Status Report for August 16, 2003

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 93   100% ELECTRICAL CAPABILITY *   Brunswick 2 96   100% ELECTRICAL … 1 100         Quad Cities 2 96   INVESTIGATION OF MAIN STEAM SYSTEM RELAY EQUIPMENT - SLOWLY INCREASING POWER *   …

Power Reactor Status Report for December 17, 2003

…     Browns Ferry 2 100         Browns Ferry 3 100         Brunswick 1 93   100% ELECTRICAL CAPABILITY     Brunswick 2 96   100% ELECTRICAL … Island 2 100         Quad Cities 1 85   HOLDING DUE TO STEAM DRYER CONCERNS     Quad Cities 2 96   100% ELECTRICAL …