EA-96-040 - Saint Lucie 1 (Florida Power & Light Co.)

… EA-96-040 - Saint Lucie 1 (Florida Power & Light Co.) … March 28, 1996 EA … This refers to the special followup inspection at the St. Lucie facility conducted on January 26-30 and February … coolant system was not appropriately translated into plant operating procedures. This condition has existed since …

EA-98-009 - Saint Lucie 1 (Florida Power & Light Co.)

… EA-98-009 - Saint Lucie 1 (Florida Power & Light Co.) … March 25, 1998 EA … on November 3, 1997, through January 9, 1998, at the St. Lucie facility. The results of the inspection were … sump, if necessary. However, the design basis of the plant calls for automatic transfer of the ECCS suction …

EA-98-513 - Saint Lucie 1 (Florida Power & Light Co.)

… EA-98-513 - Saint Lucie 1 (Florida Power & Light Co.) … March 31, 1999 EA … conducted on October 10-23 and November 2-6, 1998, at the St. Lucie facility. The purpose of the inspection was to … "Control Room Inaccessibility," was the procedure plant operators would have used to evacuate the control room …

EA-96-236; 96-249 - Saint Lucie 1 (Florida Power & Light Co.)

… EA-96-236; 96-249 - Saint Lucie 1 (Florida Power & Light Co.) … September 19, 1996 EA … ATTN: Mr. T. F. Plunkett President - Nuclear Division Post Office Box 14000 Juno Beach, Florida 33408-0420 SUBJECT: … you failed to effectively incorporate design changes into plant operating procedures or drawings. These violations …

491st Meeting - April 11, 2002

… 491st Meeting - April 11, 2002 … Official Transcript of … were able to observe on the simulators the ability of the plant to interconnect the emergency diesel generators from … Project Manager for License Renewal for Turkey Point in St. Lucie. I thank you for the opportunity to talk to you all …

North Anna, Units 1 and 2 – Subsequent License Renewal Application

… Schedule Safety Evaluation Report Environmental Impact Statement Public Involvement Project Managers for North … SECY-21-0066, “Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses – Environmental Review,” that … Beach, Units 1 and 2; Oconee Units, 1, 2, and 3; and St. Lucie, Units, 1 and 2. Until further notice, the completion …