Skip to main content

Search Results

Displaying 131 - 140 of 1315

Event Notification Report for October 29, 2014

… Event Notification Report for October 29, 2014 … U.S. Nuclear Regulatory Commission Operations Center Event … Entergy Operations that an LCR-25 battery installed at the Palisades Nuclear Power Plant had shown signs of misaligned separators (also known …

Event Notification Report for December 02, 2002

… Event Notification Report for December 02, 2002 … U.S. Nuclear Regulatory Commission Operations Center Event … TRANSFORMERS DECLARED | | INOPERABLE | | | | "Available plant indicators showed that main generator output exceeded … | FACILITY: PALISADES REGION: 3 |NOTIFICATION DATE: 12/02/2002| | UNIT: …

Event Notification Report for February 20, 2003

… Event Notification Report for February 20, 2003 … U.S. Nuclear Regulatory Commission Operations Center Event … | FACILITY: PALISADES REGION: 3 |NOTIFICATION DATE: 02/16/2003| | UNIT: … | NOUE DECLARED DUE TO REDUCED PLANT SERVICE WATER FLOW | | | | Licensee reported that …

Preliminary Notification (PN) Reports for 2013

… Failure PNO-IV-13-004A 12/10/2013 Entergy: Arkansas Nuclear One, Unit 2, Fire in Auxilary Transformer … FirstEnergy Nuclear Operating Company: Perry Nuclear Power Plant: Unplanned Shutdown Greater than 72 Hours Due to a … 06/17/2013 Entergy Nuclear Operations, Inc.: Palisades Shutdown Due to Safety Injection Refueling Water …

Event Notification Report for December 30, 2008

… Event Notification Report for December 30, 2008 … U.S. Nuclear Regulatory Commission Operations Center Event … ** 44745 Power Reactor Event Number: 44745 Facility: PALISADES Region: 3 State: MI Unit: [1] [ ] [ ] RX Type: [1] … telecommunications capability to the Palisades Nuclear Plant at approximately 2100 EST. The condition was caused by …

Commission Orders for 2015

… Docket Date/ Number CLI-15-27 DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) 12/23/2015 50-341-LR CLI-15-26 AEROTEST … 50-286-LR CLI-15-23 ENTERGY NUCLEAR OPERATIONS, INC. (Palisades Nuclear Plant) 11/09/2015 50-255-LA-2 CLI-15-22 …

Boraflex Degradation In Spent Fuel Pool Storage (Generic Letter 96-04)

… Fuel Pool Storage (Generic Letter 96-04) … UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR … to the wet pool environment. Description of Circumstances Palisades Nuclear Power Station During the removal of … different rack designs, this water access will vary from plant to plant. The rate of dissolution also increases with …

Reactor Pressure Vessel Status Report (NUREG-1511, Supplement 2)

… Strosnider, W. H. Bateman Division of Engineering Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory … the reactor pressure vessels (RPVs) at their nuclear power plants, and (2) assess the impact of those data on their RPV … project at the Marble Hill facility and the status of the Palisades thermal annealing application, and (8) the results …