Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

The Battelle Integrity of Nuclear Piping (BINP) Program Final Report: Appendices (NUREG/CR-6837, Volume 2)

On this page:

Download complete document

Publication Information

Manuscript Completed: September 2003
Date Published: June 2005

Prepared by:
P. Scott, R. Olson, J. Bockbrader, M. Wilson, B. Gruen,
R. Morbitzer, Y. Yang, C. Williams, F. Brust, L. Fredette, N. Ghadiali Battelle
505 King Avenue
Columbus, Ohio 43201

G. Wilkowski, D. Rudland, Z. Feng, R. Wolterman
Engineering Mechanics Corporation of Columbus (Subcontractor)
3518 Riverside Drive, Suite 202
Columbus, Ohio 43221-1735

C.A. Greene, NRC Project Manager

Prepared for:
Division of Engineering Technology
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

NRC Job Code W6775

Availability Notice

Abstract

Volume I of the final report for the Battelle Integrity of Nuclear Piping (BINP) program provided a summary of the results from this program and a discussion of the implications of those results. This volume (Volume II - Appendices) provides the details from the various technical tasks conducted as part of this program. Each individual appendix provides the details of a specific task conducted as part of the BINP program.

Page Last Reviewed/Updated Thursday, March 25, 2021

Page Last Reviewed/Updated Thursday, March 25, 2021