The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Post-Test Analysis of ROSA-2 Test 2 (IBLOCA) with TRACE (NUREG/IA-0503)

On this page:

Download complete document

Publication Information

Manuscript Completed: April 2018
Date Published: February 2019

Prepared by:

S. Gallardo, A. Querol, M. Lorduy and G. Verdú
Universitat Politècnica de València
Instituto Universitario de Seguridad Industrial, Radiofísica y Medioambiental
Camí de Vera s/n 46022 Valencia, SPAIN

K. Tien, NRC Project Manager

Division of Systems Analysis
Office of Nuclear Regulatory Research
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Prepared as part of:
The Agreement on Research Participation and Technical Exchange
Under the Radiation Protection Computer Code Analysis and Maintenance Program (RAMP)

Published by:
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

The purpose of this work is to overview the results obtained by simulating a 17% cold leg Intermediate Break Loss-Of-Coolant Accident (IBLOCA) in the Large Scale Test Facility (LSTF) using the thermal-hydraulic code TRACE5 patch 2. This IBLOCA transient corresponds to the Test 2 (IB-CL-03 in JAEA) and it is performed in the frame of the OECD/NEA ROSA-2 Project. During this transient, the single-failure of the High and the Low Pressure Injection systems (HPI and LPI, respectively) in the broken loop and the total failure of Auxiliary Feedwater (AFW) are assumed.

A detailed model of the LSTF and the chronology of events following these assumptions have been developed with TRACE5 patch 2. A comparison between the simulation and the experimental results is provided throughout different graphs. Acceptable general behavior is observed in the entire transient.

Page Last Reviewed/Updated Tuesday, March 09, 2021