Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Change Notice 00-002

Issue Date: 02/28/00

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 00-002.zip

 

  DELETED:
Number
Date TRANSMITTED:
Number
Date
1. IMC 2810 02/03/00 IMC 2810 02/28/00
2. TI 2515/143 10/15/99 ---- ----

 

TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS: IMC 2810 (Master Material License Inspection Program) has been revised to clarify the responsibilities of the NRC Project Coordinator and MML's License Coordinator. Significant Performance Problems) has had a major revision to incorporate policy and guidance relating to the revised reactor oversight program.
  TI 2515/143 (Shearon Harris Spent Fuel Pool (C&D) Expansion) is closed. The inspection requirements identified by this TI have been completed.