Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Change Notice 99-012

Issue Date: 08/02/99

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 99-012.zip

 


 

  DELETED:   TRANSMITTED:  
  Number Date Number Date
         
1. IP 93800 12/11/98 IP 93800 08/02/99
2. TI 2515/110 11/16/93 ---- ----
3. TI 2515/114 01/15/92 ---- ----
4. TI 2515/119 03/31/93 ---- ----
5. TI 2515/120 09/24/93 ---- ----
6. TI 2515/141 04/13/99 TI 2515/141, Rev.1 08/02/99
Training: No special training requirements have been identified for any documents issued with this change notice.
Remarks: IP 93800
(Augmented Inspection Team) is revised to include the requirement to provide an executive summary in plain English in the inspection report generated by this procedure. This revision was made in response to SECY-99-070, "Implementation Plan for the Public Communications Initiative (DSI-14)."
  TI 2515/110
(Performance of Safety-Related Check Valves) is deleted. The inspection requirements identified by this TI have been completed and no further action is planned.
  TI 2515/114
(Inspection Requirements For Generic Letter 89-04, Acceptable Inservice Testing Programs) is deleted. The inspection requirements identified by this TI have been completed and no further action is planned.
  TI 2515/119
(Water Level Instrumentation Errors During and After Depressurization Transients (GL 92-04)) is deleted. The inspection requirements identified by this TI have been completed and no further action is planned.
  TI 2515/120
(Inspection of Implementation of Station Blackout Rule, Multi-Plant Action Item A-22) is deleted. The inspection requirements identified by this TI have been completed and no further action is planned.
  TI 2515/141, Revision 1
(Review of Year 2000 (Y2K) Readiness of Computer Systems at Nuclear Power Plants) is revised to address the 35 plants which reported that they have additional work in progress to complete a few non-safety related systems or devices to be fully Y2K ready. The staff has committed to monitor the progress of remediation at these plants and to independently verify that all required work is completed prior to Y2K transition. This revision will provide guidance to perform this verification at these 35 plants.
Distribution: Standard

END