The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Change Notice 99-005

Issue Date: 04/05/99

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 99-005.zip

 


 

  DELETED:   TRANSMITTED:  
  Number Date Number Date
1. IP 87110 02/03/97 IP 87110 04/05/99
2. IP 87110, App A 02/03/97 IP 87110, App A 04/05/99
3. ---- ---- IP 87110, App B 04/05/99
4. IP 93808 09/06/95 ---- ----
5. TI 2515/065 07/30/93 ---- ----
6. TI 2515/103 12/18/89 ---- ----
7. TI 2515/113 11/18/91 ---- ----
TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS: IP 87110 (Industrial/Academic/Research Programs)
  IP 87110, Appendix A (Industrial/Academic/Research Inspection Record)
  IP 87110, Appendix B (Industrial/Academic/Research Inspection References)
  The inspection procedure has been revised to reflect a performance based inspection approach. This revision also changes the format, eliminates the field notes, adds an inspection record section, and adds a references section.
  IP 93808 (Integrated Performance Assessment Process) is deleted. The assessment processes described by this IP are no longer required.
  TI 2515/065 (TMI Action Plan Requirement Followup) is deleted. The inspection requirements identified in this TI have been completed.
  TI 2515/103 (Loss of Decay Heat Removal (Generic Letter No. 88-17) 10 CFR 50.54(f) Programmed Enhancements (Long Term Review)) is deleted. The inspection requirements for this TI have been completed.
  TI 2515/113 (Reliable Decay Heat Removal During Outages) is deleted. The inspection requirements identified in this TI have been completed.
 