Change Notice 96-006

  DELETED: TRANSMITTED:
  Number Date Number Date
1. TI 2512/007 01/27/84 ---- ----
2. TI 2512/013 07/23/84 ---- ----
3. TI 2512/015, Rev.1 10/01/91 ---- ----
4. TI 2512/016 07/13/92 ---- ----
5. TI 2512/017 07/13/92 ---- ----
6. TI 2512/018 07/13/92 ---- ----
7. TI 2512/019 07/13/92 ---- ----
8. TI 2512/020 07/13/92 ---- ----
9. TI 2512/021 07/13/92 ---- ----
10. TI 2512/022 07/13/92 ---- ----
11. TI 2512/023 07/13/92 ---- ----
12. TI 2512/024 07/13/92 ---- ----
13. TI 2512/025 07/13/92 ---- ----
14. TI 2512/026 07/13/92 ---- ----
15. TI 2512/027 07/13/92 ---- ----
16. TI 2512/028 07/13/92 ---- ----
17. TI 2512/029 07/13/92 ---- ----
18. TI 2512/030 07/13/92 ---- ----
19. TI 2512/031 07/13/92 ---- ----
20. TI 2512/032 07/13/92 ---- ----
21. TI 2512/033 07/13/92 ---- ----
22. TI 2512/034 07/13/92 ---- ----
23. TI 2512/035 07/13/92 ---- ----
24. TI 2512/036 07/13/92 ---- ----
25. TI 2512/037 07/13/92 ---- ----
26. TI 2512/038 07/13/92 ---- ----
27. TI 2512/039 07/13/92 ---- ----
28. TI 2512/040 07/13/92 ---- ----
29. TI 2512/041 07/13/92 ---- ----
30. TI 2512/042 07/13/92 ---- ----
31. TI 2512/043 07/13/92 ---- ----
TRAINING: No special training requirements have been identified for documents issued with this change notice.
REMARKS: TI 2512/007 (Regional Construction Assessment Team Inspections) is deleted. Since there are no longer any plants undergoing active construction, this TI is being removed from the program and will be archived.

TI 2512/013 (Inspection of Replacement of BWR Recirculation Piping) is deleted. The inspection requirements for this TI have been completed. The expiration date for this TI was 07/23/86.

TI 2512/015, Revision 1 (Inspection of Watts Bar Nuclear Plant Employee Concerns Program) is deleted. The inspection requirements for this TI were applicable for the construction phase of Watts Bar Nuclear Plant. With the issuance of an operating license, this construction phase activity is no longer applicable.

TIs 2512/016 thru 2512/043, (Inspection of Watts Bar Nuclear Plant [Corrective Action or Special] Program), are deleted. These TIs were issued to provide guidance on inspecting 28 special TVA programs at the Watts Bar Nuclear Plant, and to permit regional tracking of direct inspection effort for each program. With the issuance of an operating license for Watts Bar Nuclear Plant, these construction activity TIs are no longer applicable.

TI Number Corrective Action or Special Program

TI 2512/016 Cable Issues

TI 2512/017 Cable Tray and Supports

TI 2512/018 Electrical Conduit and Supports

TI 2512/019 Design Baseline (DBVP)

TI 2512/020 Electrical Issues

TI 2512/021 Equipment Seismic

TI 2512/022 Fire Protection

TI 2512/023 Hanger Update (HAAUP)

TI 2512/024 Heat Code Traceability

TI 2512/025 HVAC Duct and Supports

TI 2512/026 Instrument Lines

TI 2512/027 Piece Parts/Procurement

TI 2512/028 QA Records

TI 2512/029 Q-List

TI 2512/030 Seismic Analysis

TI 2512/031 Vendor Information

TI 2512/032 Welding

TI 2512/033 Concrete Quality

TI 2512/034 Containment Cooling

TI 2512/035 Control Room Design Review (CRDR)

TI 2512/036 Environmental Qualification (EQ)

TI 2512/037 Master Fuse List

TI 2512/038 Mechanical Equipment Qualification

TI 2512/039 Microbe Induced Corrosion (MIC)

TI 2512/040 Moderate Energy Line Break (MELB)

TI 2512/041 Radiation Monitoring System

TI 2512/042 Soil Liquefaction

TI 2512/043 Use-As-Is CAQRS