TI 2512/007 (Regional Construction Assessment Team Inspections) is deleted. Since there are no longer any plants undergoing active construction, this TI is being removed from the program and will be archived. TI 2512/013 (Inspection of Replacement of BWR Recirculation Piping) is deleted. The inspection requirements for this TI have been completed. The expiration date for this TI was 07/23/86. TI 2512/015, Revision 1 (Inspection of Watts Bar Nuclear Plant Employee Concerns Program) is deleted. The inspection requirements for this TI were applicable for the construction phase of Watts Bar Nuclear Plant. With the issuance of an operating license, this construction phase activity is no longer applicable. TIs 2512/016 thru 2512/043, (Inspection of Watts Bar Nuclear Plant [Corrective Action or Special] Program), are deleted. These TIs were issued to provide guidance on inspecting 28 special TVA programs at the Watts Bar Nuclear Plant, and to permit regional tracking of direct inspection effort for each program. With the issuance of an operating license for Watts Bar Nuclear Plant, these construction activity TIs are no longer applicable. TI Number Corrective Action or Special Program TI 2512/016 Cable Issues TI 2512/017 Cable Tray and Supports TI 2512/018 Electrical Conduit and Supports TI 2512/019 Design Baseline (DBVP) TI 2512/020 Electrical Issues TI 2512/021 Equipment Seismic TI 2512/022 Fire Protection TI 2512/023 Hanger Update (HAAUP) TI 2512/024 Heat Code Traceability TI 2512/025 HVAC Duct and Supports TI 2512/026 Instrument Lines TI 2512/027 Piece Parts/Procurement TI 2512/028 QA Records TI 2512/029 Q-List TI 2512/030 Seismic Analysis TI 2512/031 Vendor Information TI 2512/032 Welding TI 2512/033 Concrete Quality TI 2512/034 Containment Cooling TI 2512/035 Control Room Design Review (CRDR) TI 2512/036 Environmental Qualification (EQ) TI 2512/037 Master Fuse List TI 2512/038 Mechanical Equipment Qualification TI 2512/039 Microbe Induced Corrosion (MIC) TI 2512/040 Moderate Energy Line Break (MELB) TI 2512/041 Radiation Monitoring System TI 2512/042 Soil Liquefaction TI 2512/043 Use-As-Is CAQRS |