Information Notice No. 82-29: Control Rod Drive (CRD) Guide Tube Support Pin Failures at Westinghouse PWRS
SSINS No.: 6835 IN 82-29 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 July 23, 1982 Information Notice No. 82-29: CONTROL ROD DRIVE (CRD) GUIDE TUBE SUPPORT PIN FAILURES AT WESTINGHOUSE PWRS Addressees: All nuclear power reactor facilities holding an operating license (OL) or construction permit (CP) using a Westinghouse-designed NSSS. Purpose: This information notice is provided as notification of an event that may have safety significance. It is expected that recipients will review the information for applicability to their facilities. No specific action or response is required. Description of Circumstances: Since 1978, several failures of the control rod drive (CRD) guide tube support pins have occurred. Westinghouse has notified NRC of these occurrences by the following correspondence: 1. June 11, 1979, NS-TMA-2099, Letter to D. Eisenhut from T. M. Anderson concerning support pin and flexure failures in Japan. 2. March 14, 1980, NS-TMA-2214, Letter to Victor Stello from T. M. Anderson; Title 10 CFR Part 21 notification concerning CRD Guide Tube Support Pin Failures at Foreign Plants. 3. April 23, 1980, NS-TMA-2235, Letter to Stephen S. Pawlicki from T. M. Anderson summarizing Westinghouse/TVA/NRC meeting on May 20, 1980 on Sequoyah guide tube support pins. 4. June 10, 1980, NS-TMA-2254, Letter to Stephen Pawlicki from T. M. Anderson concerning inspection of support pins. 5. May 20, 1982, NS.-EPR-2251, Letter to Victor Stello from E. P. Rahe, Jr., concerning a pin failure at Graveline 1. Prior to May of this year, at which time a guide tube pin failed at North Anna 1, these failures had occurred only at foreign reactors (Japan and France). The pins are used to align the bottom of the CRD guide tube assembly into the top of the upper core plate. Two support pins are bolted into the bottom plate of each lower gUide tube, and are inserted into the top of the upper core plate in a manner that provides lateral support while accommodating thermal expansion of the guide tube relative to the core plate (see attached pin assembly diagram). The pins are about 3 1/2 inches long and have a diameter of 0.507 or 0.537 inch (depending on reactor design). The pin assembly includes (1) a bolt section 8204210402 . IN 82-29 July 23, 1982 Page 2 of 3 to which a nut (sleeve) is threaded to anchor the pin to the guide tube, (2) at collet that rests against the guide tube, and (3) a leaf spring section with the leaf shaped somewhat like a clothespin. The material is Inconel X-750, which, depending on the manufacturer and the fabrication date, has been solution heat-treated and age hardened at various temperatures and for various times. For example, the solution heat treatment temperatures and times ranged from 1625F to 2100 F and from 1/2 hour to 24 hours; age hardening temperatures and times ranged from 1148 F to 1544 F and from 8 hours to 20 hours, respectively. The first failures were detected in early 1978 at Mihama Unit 3 in Japan, at which time the top portion of a support pin with the shank and lock nut engaged was found in a steam generator. Subsequent ultrasonic testing (UT) showed a possibility of cracks in 103 out of 105 pins at the bolt to collet transition region of the pin. Seven of the Mitsubishi-supplied pins were then removed and inspected, confirming the UT results. All pins were subsequently replaced and UT inspection was conducted at other Japanese plants. In all, there have been at least eight support pin failures where a pin has actually broken. These occurred with both Westinghouse and Mitsubishi-supplied pins. In a recent failure at Fessenheim Unit 1 in France, part of a broken pin caused considerable damage to a steam generator within 72 hours of its failure. It is estimated that the plant will be shutdown for about a year to repair the steam generator. Although the broken part consists of the bolt section including the nut, only the lock nut of the pin has been found and the bolt portion is still missing. Previous to the Fessenheim failure, a leaf from a support pin was found in ah accumulator check valve at Graveline 1 in France. It is not known how the leaf traveled to the check valve. The only domestic pin failure occurred in May 1982 at North Anna 1. The lock nut of a support pin was found in steam generator "A" and a smaller piece of material, also identified as part of a support pin, was found in steam generator "C." Damage to the steam generators is considerable, with about 75% of the tube ends sustaining damage. It is our understanding that the plant was shutdown in less than 24 hours after detecting the loose parts in the steam generators. It is also our understanding that the reactor internals will be video inspected to determine the status of the remaining support pins. Westinghouse's analysis indicated that the failures are caused by stress corrosion cracking (SCC) of pins that are solution heat treated at less than 1800 F after which they are age hardened, and then highly stressed (60,000 psi nominal on the shank and 130,000 psi on the, leaf spring section of the pin). The solution heat treatment of the North Anna 1 support pin was 1625 F for 1 hour followed by an age hardening treatment. The torque on the nut was 210 ft-lb. Westinghouse now recommends that the pins be solution heat treated at 2000 F for 1 hour and age hardened at 1300 F for 20 hours to minimize the SCC problem. Westinghouse also recommends that the torque on the lock nut be reduced to 130 to 140 ft-lb. The consequences of pin failure for plants with the upper head injection (UHI) design was originally considered to be more acute than those for non-UHI plants. This concern resulted from the potential for CRD misalignment in UHI plants on . IN 82-29 May 23, 1982 Page 3 of 3 pin failure. However, domestic operating UHI plants now have support pins meeting the recommended material process standards and the pin body design has been revised to prevent control rod misalignment on pin failure. Westinghouse does not consider CRD misalignment as credible in non-UHI plants. The safety consequence of a support pin as a loose part, however, is still under consideration by NRC. It is important to note that, although a single-pin failure is of limited safety significance, the common-mode failure mechanism of stress corrosion cracking could cause several pins to fail. We are concerned that, if not properly detected, multiple pin failures may occur that could affect redundant safety systems. If you have any questions regarding this matter, please call the appropriate regional administrator or this office. Edward L. Jordan, Director Division of Engineering and Quality Assurance Technical Contact: I. Villalva, IE 301-492-9635 Attachments: 1. Pin Assembly Diagram 2. List of Recently Issued IE Information Notices
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021