The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 31, 2024

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action
*
Beaver Valley 2 100 High System Voltage Action
*
Calvert Cliffs 1 100 High System Voltage Action
*
Calvert Cliffs 2 100 High System Voltage Action

*
FitzPatrick 100
Ginna 100
Hope Creek 1 85 Coastdown To Refueling Outage; High System Voltage Action
*
Limerick 1 87 Coastdown To Refueling Outage
*
Limerick 2 100
Millstone 2 100
Millstone 3 100

Nine Mile Point 1 100

Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 0 3/25/2024 Refueling Outage;
High System Voltage Action
*
Susquehanna 2 100
High System Voltage Action
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
*
Browns Ferry 3 93
Reduced Power For Rod Pattern Adjustment
*
Brunswick 1 100

Brunswick 2 100
Catawba 1 100
Catawba 2 0 3/17/2024 Refueling Outage
Farley 1 100
Farley 2 100
Harris 1 87 Coastdown To Refueling Outage
*
Hatch 1 98
Reduced Power For Rod Pattern Adjustment
*
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0 3/3/2024 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 3/9/2024 Refueling Outage
Saint Lucie 2 100
Sequoyah 1 0 3/23/2024 Refueling Outage
*
Sequoyah 2 100
Summer 100

Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 90 Holding Power For Physics Testing
*
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 85 Coastdown To Refueling Outage
*
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 100
D.C. Cook 1 100 High System Voltage Action
*
D.C. Cook 2 0 3/22/2024 Refueling Outage;
High System Voltage Action
*
Davis-Besse 96 Increasing Power;
High System Voltage Action
*
Dresden 2 100
Dresden 3 100
Fermi 2 0 3/23/2024 Refueling Outage
LaSalle 1 100
LaSalle 2 100
Monticello 0 3/27/2024 Reactor Startup
*
Perry 1 100
*
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100

Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 0 3/18/2024 Refueling Outage

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100

Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 40 Increasing Power
*
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 95 Coastdown To Refueling Outage
*
River Bend Station 1 100

South Texas 1 100
South Texas 2 0 3/23/2024 Refueling Outage
Waterford 3 0 3/21/2024 EN 57042
Wolf Creek 1 0 3/28/2024 Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, April 29, 2024