The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 20, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 0 03/01/2015 REFUELING OUTAGE    
Limerick 1 100        
Limerick 2 88   COASTDOWN TO REFUELING OUTAGE    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 0 03/15/2015 REFUELING OUTAGE    
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 89   HOLDING POWER FOR EPU TESTING    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 03/15/2015 FORCED OUTAGE - TECH SPEC REQUIRED SHUTDOWN SEE EN #50896    
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 99   LOAD LIMIT BY GENERATOR *  
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 0 03/13/2015 REFUELING OUTAGE    
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 0 02/20/2015 CORE RELOAD IN PROGRESS    
Catawba 1 100        
Catawba 2 0 02/27/2015 REFUELING OUTAGE    
Farley 1 86   COASTDOWN TO REFUELING OUTAGE *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100     *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 03/07/2015 REFUELING OUTAGE    
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 97   COASTDOWN TO REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 75   COASTDOWN TO REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100     *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 03/19/2015 REACTOR SCRAM SEE EN #50903 * 1
La Salle 1 100        
La Salle 2 49   HOLDING POWER FOR JET PUMP ANALYSIS    
Monticello 95   EPU TESTING IN PROGRESS    
Palisades 100        
Perry 1 0 03/08/2015 REFUELING OUTAGE    
Point Beach 1 100     *  
Point Beach 2 100     *  
Prairie Island 1 100        
Prairie Island 2 0 03/05/2015 FORCED OUTAGE DUE TO LOSS OF INSTRUMENT AIR. SEE EN# 50866. *  
Quad Cities 1 0 03/02/2015 REFUELING OUTAGE    
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 0 02/22/2015 REFUELING OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 02/28/2015 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021