Power Reactor Status Report for October 25, 2014
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
FitzPatrick | 100 | ||||
Ginna | 90 | PLANNED DOWN POWER TO 75% | * | ||
Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 0 | 10/11/2014 | REFUELING OUTAGE | ||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 0 | 10/19/2014 | REFUELING OUTAGE | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | * | |||
Salem 1 | 0 | 10/19/2014 | REFUELING OUTAGE | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ONE CONTINGENCY AWAY FROM DOWNPOWER DUE TO LINE OUTAGE | |||
Susquehanna 1 | 100 | * | |||
Susquehanna 2 | 100 | * | |||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
Vermont Yankee | 90 | COASTDOWN TO OUTAGE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 10/03/2014 | REFUELING OUTAGE | * | |
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 0 | 10/14/2014 | DEFUELED | * | |
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 09/12/2014 | REFUELING OUTAGE | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | * | |||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 49 | INCREASING POWER | * | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | * | |||
Byron 2 | 60 | INCREASING POWER | * | ||
Clinton | 98 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 47 | CHEMISTRY HOLD | * | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | HIGH VOLTAGE ACTION | * | ||
Dresden 2 | 100 | ||||
Dresden 3 | 85 | COASTDOWN TO REFUELING OUTAGE | |||
Duane Arnold | 0 | 10/03/2014 | REFUELING OUTAGE | ||
Fermi 2 | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 31 | REPAIR CIRC WATER PUMP | |||
Palisades | 100 | ||||
Perry 1 | 0 | 10/19/2014 | AUTOMATIC REACTOR SCRAM - SEE EN # 50551 | ||
Point Beach 1 | 0 | 10/03/2014 | REFUELING OUTAGE | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 0 | 10/07/2014 | REFUELING OUTAGE | ||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 0 | 10/11/2014 | REFUELING OUTAGE | ||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 0 | 10/04/2014 | REFUELING OUTAGE | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 0 | 09/27/2014 | REFUELING OUTAGE | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 10/04/2014 | REFUELING OUTAGE | * | |
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 0 | 10/10/2014 | REFUELING OUTAGE | ||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 15 | NOT SYNCED TO GRID HOLDING POWER FOR TURBINE TESTING | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021