Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for May 25, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 74   HOLDING FOR FLUX MAP *  
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100        
Ginna 0 05/24/2014 SHUT DOWN TO REPAIR EXCITER COOLER LEAK *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 64   REDUCED POWER FOR PLANNED TESTING *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100     *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 04/12/2014 REFUELING OUTAGE    
Seabrook 1 100        
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE *  
Susquehanna 2 100     *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/06/2014 REFUELING OUTAGE    
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/11/2014 REFUELING OUTAGE    
Summer 0 04/04/2014 REFUELING OUTAGE    
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 28   SHUTTING DOWN TO REPAIR RCS LEAK *  
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 52   REDUCED POWER FOR UNPLANNNED MAINTENANCE *  
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100     *  
Dresden 2 76   REDUCED POWER FOR PLANNED MAINTENANCE *  
Dresden 3 100        
Duane Arnold 98   INCREASING POWER FOLLOWING LOAD LINE ADJUSTMENT    
Fermi 2 100        
La Salle 1 100        
La Salle 2 80   INCREASING POWER AFTER REDUCING FOR PLANNED MAINTENANCE *  
Monticello 88   ENGINEERING HOLD FOR EPU TESTING    
Palisades 100        
Perry 1 95   HOLDING POWER WHILE RESOLVING FW HEATER ISSUES *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100     *  
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 72   HOLDING POWER FOR GRID STABILIZATION    
Arkansas Nuclear 2 0 04/27/2014 REFUELING OUTAGE    
Callaway 100     *  
Columbia Generating Station 65   REDUCED POWER FOR ECONOMIC DISPATCH    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 68   INCREASING POWER *  
Wolf Creek 1 100        