The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 24, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 45   HOLDING FOR FLUX MAP *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100        
Ginna 78   INCREASING POWER *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 63   REDUCED POWER FOR PLANNED TESTING *  
Millstone 2 100        
Millstone 3 100     *  
Nine Mile Point 1 100        
Nine Mile Point 2 98   INCREASING POWER *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 04/12/2014 REFUELING OUTAGE    
Seabrook 1 100        
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 50   REDUCED POWER FOR PLANNED MAINTENANCE HIGH SYSTEM VOLTAGE ACTION *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 05/06/2014 REFUELING OUTAGE    
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100     *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/11/2014 REFUELING OUTAGE    
Summer 0 04/04/2014 REFUELING OUTAGE    
Surry 1 100        
Surry 2 100     *  
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 80   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 98   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 98   INCREASING POWER FOLLOWING LOAD LINE ADJUSTMENT *  
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 88   ENGINEERING HOLD FOR EPU TESTING *  
Palisades 100     *  
Perry 1 85   HOLDING POWER WHILE RESOLVING FW HEATER ISSUES *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 29   UNIT STARTUP CHEMISTRY HOLD *  
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 72   HOLDING POWER FOR GRID STABILIZATION    
Arkansas Nuclear 2 0 04/27/2014 REFUELING OUTAGE    
Callaway 95   TURBINE TESTING *  
Columbia Generating Station 65   REDUCED POWER FOR ECONOMIC DISPATCH    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE *  
South Texas 2 100        
Waterford 3 49   FEEDWATER PUMP MAINTENANCE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.