The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 29, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/18/2014 DEFUELED *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE *  
FitzPatrick 100        
Ginna 0 04/27/2014 REFUELING OUTAGE *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 0 04/24/2014 MAINTENANCE OUTAGE - TURBINE BLADE REPLACEMENT    
Millstone 2 0 04/05/2014 DEFUELED    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 25   INCREASING POWER PER THE POWER PROFILE *  
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 04/12/2014 REFUELING OUTAGE    
Seabrook 1 100   SINGLE DOWNPOWER CONTINGENCY IN EFFECT DUE TO PLANNED LINE MAINTENANCE    
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 98   INCREASING POWER TO 100% *  
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/14/2014 DEFUELED    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   TORNADO WATCH IN EFFECT UNTIL 0700 HOURS *  
Sequoyah 2 84   COASTDOWN TO REFUELING OUTAGE - TORNADO WATCH IN EFFECT UNTIL 0700 HOURS *  
Summer 0 04/04/2014 DEFUELED    
Surry 1 100        
Surry 2 0 04/20/2014 REFUELING OUTAGE    
Turkey Point 3 47   COMPLETING NI GAIN ADJUST - WILL INCREASE POWER TO 100% SHORTLY *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 03/23/2014 REFUELING OUTAGE *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 57   INVESTIGATING CONDENSATE BOOSTER PUMP TRIP *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION    
Davis-Besse 0 01/31/2014 REFUELING OUTAGE HIGH VOLTAGE ALERT *  
Dresden 2 92   INCREASING POWER *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 94   HOLDING POWER FOR PLANT TESTING *  
La Salle 1 100        
La Salle 2 0 04/27/2014 MAINTENANCE OUTAGE *  
Monticello 88   ENGINEERING HOLD FOR EPU TESTING    
Palisades 100        
Perry 1 100   HIGH SYSTEM VOLTAGE ACTION    
Point Beach 1 0 04/28/2014 MAINTENANCE OUTAGE - CONTAINMENT DOME TRUSS REPAIRS *  
Point Beach 2 100        
Prairie Island 1 100     *  
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 0 03/31/2014 REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 55   INCREASING POWER *  
Arkansas Nuclear 2 0 04/27/2014 AUTOMATIC REACTOR TRIP DUE TO AUXILIARY TRIP ON CORE PROTECTION CALCULATOR - SEE EN #50063 *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 78   HOLDING POWER FOR TESTING *  
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 79   HOLDING FOR HEATER DRAIN PUMP MAINTENANCE *  
Palo Verde 1 100        
Palo Verde 2 0 04/04/2014 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 0 04/12/2014 DEFUELED    
Wolf Creek 1 0 03/07/2014 MAINTENANCE OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021