The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 26, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 10/10/2004 DEFUELED    
Indian Point 2 92   HOLD FOR FLUX MAPPING *  
Indian Point 3 100        
Limerick 1 99   REDUCED POWER WHILE EVALUATING FEEDWATER FLOW INSTRUMENTATION    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 99   MOISTURE SEPARATOR REHEATER OUT    
Seabrook 1 100        
Susquehanna 1 97   INCREASING POWER *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100     *  
Browns Ferry 3 42   INCREASING POWER *  
Brunswick 1 100        
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 99   100% ELECTRICAL CAPABILITY    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 10/08/2004 DEFUELED    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 0 10/30/2004 REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 0 09/26/2004 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 73   INCREASING POWER *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 94   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 0 11/22/2004 SHUTDOWN TO REPAIR STEAM LEAK AND SMALL RCS LEAK AT PRESSURIZER MANWAY SEAL    
Davis-Besse 100        
Dresden 2 0 11/02/2004 SHUTDOWN FOR MAIN TURBINE REPAIR AND INSPECTING THE STEAM DRYER *  
Dresden 3 0 10/26/2004 REFUELING OUTAGE    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 0 11/05/2004 REFUELING OUTAGE    
Kewaunee 0 10/08/2004 REFUELING OUTAGE *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100     *  
Prairie Island 1 68   INCREASING POWER *  
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 0 10/25/2004 CORE RELOADED    
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 99     *  
Palo Verde 2 100        
Palo Verde 3 0 10/01/2004 PLANNED MAINTENANCE    
River Bend 1 92   ROD PATTERN ADJUSTMENT *  
San Onofre 2 100     *  
San Onofre 3 0 09/27/2004 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021