The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 30, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 80   REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/11/2003 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100     *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 80   REDUCED POWER DUE TO SOLAR MAGNETIC DISTURBANCES    
Salem 2 0 10/09/2003 REFUELING OUTAGE *  
Seabrook 1 67   INCREASING POWER *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 0 10/18/2003 DEFUELED *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 0 10/28/2003 MAINTENANCE OUTAGE    
Browns Ferry 3 100     *  
Brunswick 1 93   100% ELECTRICAL CAPABILITY    
Brunswick 2 96   100% ELECTRICAL CAPABILITY    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 10/03/2003 REFUELING OUTAGE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100     *  
Hatch 2 98   POWER LIMITED BY CONTROL VALVE FUNCTION *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 09/19/2003 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/11/2003 DEFUELED    
Surry 1 100        
Surry 2 0 09/18/2003 REFUELING    
Turkey Point 3 100        
Turkey Point 4 0 10/05/2003 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100   REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE *  
Braidwood 2 90   COASTDOWN TO REFUELING OUTAGE REVIEWING SYSTEM PLANNING OPERATING GUIDE FOR SOLAR FLARE RESPONSE *  
Byron 1 100        
Byron 2 100        
Clinton 47   OFFGAS INLEAKAGE INVESTIGATION *  
D.C. Cook 1 0 10/17/2003 DEFUELED *  
D.C. Cook 2 100        
Davis-Besse 0 02/15/2002 MAINTENANCE OUTAGE    
Dresden 2 0 10/14/2003 REFUELING OUTAGE    
Dresden 3 97   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY NO D/G OR SWITCHYARD WORK DUE TO SOLAR FLARE RESPONSE *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100   COMPENSATORY MONITORING OF RELAYS IN CONTROL ROOM FOR SOLAR FLARE RESPONSE *  
Perry 1 100        
Point Beach 1 83   INCREASING POWER FOLLOWING A DECREASE IN POWER DUE TO GRID GEO-MAGNETIC DISTURBANCES *  
Point Beach 2 0 10/03/2003 REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 99   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100   HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE *  
Arkansas Nuclear 2 100   HOLDING OFF ON SWITCHYARD MAINTENANCE FOR SOLAR FLARE RESPONSE *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100   CANCELLED D/G SURVEILLANCE DUE TO SOLAR FLARE RESPONSE *  
Comanche Peak 2 28   HOLDING FOR TURBINE TESTING *  
Cooper 0 10/28/2003 SWITCHYARD REPAIR *  
Diablo Canyon 1 100   LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT *  
Diablo Canyon 2 100   LIMITING UNPLANNED WORK ON TRIP MIDIGATION EQUIPMENT *  
Fort Calhoun 1   PERFORMING LOW POWER PHYSICS TEST @ <1% POWER *  
Grand Gulf 1 100        
Palo Verde 1 98   T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE *  
Palo Verde 2 0 09/26/2003 DEFUELED    
Palo Verde 3 99   T-HOT LIMITED TAKING EXTRA READINGS ON PLANT COMPUTER DUE TO SOLAR FLARE RESPONSE *  
River Bend 1 100   NO D/G OR RELAY TESTING DUE TO SOLAR FLARE RESPONSE *  
San Onofre 2 100   NEAREST FIRE IS 30 MILES AWAY IN SAN BERNADINO *  
San Onofre 3 100   NEAREST FIRE IS 30 MILES AWAY IN SAN BERNARDINO *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 10/19/2003 REFUELING OUTAGE    
Wolf Creek 1 0 10/18/2003 DEFUELED    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021