Power Reactor Status Report for April 2, 2003
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BEAVER VALLEY-1 | 0 | 03/07/2003 | Intermediate Shut REFUELING OUTAGE - DEFUELED
| | |
BEAVER VALLEY-2 | 100 | | | | |
CALVERT CLIFFS 1 | 100 | | | | |
CALVERT CLIFFS 2 | 0 | 02/14/2003 | Refueling REFUELING OUTAGE - DEFUELED
| | |
FITZPATRICK 1 | 100 | | | | |
GINNA 1 | 100 | | | | |
HOPE CREEK 1 | 97 | | Power Operation COASTDOWN TO REFUELING OUTAGE
| | |
INDIAN POINT 2 | 100 | | | | |
INDIAN POINT 3 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE
| * | |
LIMERICK 1 | 100 | | | | |
LIMERICK 2 | 100 | | | | |
MILLSTONE 2 | 100 | | | | |
MILLSTONE 3 | 100 | | | | |
NINE MILE POINT 1 | 0 | 03/14/2003 | Refueling REFUELING OUTAGE
| | |
NINE MILE POINT 2 | 100 | | | | |
OYSTER CREEK 1 | 100 | | | | |
PEACH BOTTOM 2 | 100 | | | | |
PEACH BOTTOM 3 | 100 | | | | |
PILGRIM 1 | 100 | | | | |
SALEM 1 | 100 | | | * | |
SALEM 2 | 70 | | Power Operation INCREASING POWER
| * | |
SEABROOK 1 | 100 | | | | |
SUSQUEHANNA 1 | 100 | | | | |
SUSQUEHANNA 2 | 0 | 03/07/2003 | Refueling REFUELING OUTAGE
| | |
THREE MILE ISLAND 1 | 100 | | | | |
VERMONT YANKEE 1 | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BROWNS FERRY 1 | 0 | 03/03/1985 | Cold Shutdown DEFUELED
| | |
BROWNS FERRY 2 | 100 | | | | |
BROWNS FERRY 3 | 89 | | Power Operation REDUCED POWER FOR ROD ADJUSTMENT
| * | |
BRUNSWICK 1 | 94 | | Power Operation 100% ELECTRICAL POWER
| | |
BRUNSWICK 2 | 0 | 03/07/2003 | Cold Shutdown REFUELING OUTAGE
| | |
CATAWBA 1 | 100 | | | | |
CATAWBA 2 | 100 | | | | |
CRYSTAL RIVER 3 | 100 | | | | |
FARLEY 1 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE
| * | |
FARLEY 2 | 100 | | | | |
HARRIS 1 | 100 | | | | |
HATCH 1 | 100 | | | | |
HATCH 2 | 92 | | Power Operation HOLDING FOR BEGINNING OF CYCLE PRE-CONDITIONING
| * | |
MCGUIRE 1 | 100 | | | | |
MCGUIRE 2 | 100 | | | | |
NORTH ANNA 1 | 0 | 02/22/2003 | Refueling REFUELING OUTAGE - DEFUELED
| | |
NORTH ANNA 2 | 100 | | | * | |
OCONEE 1 | 100 | | | | |
OCONEE 2 | 100 | | | | |
OCONEE 3 | 97 | | Power Operation COASTDOWN TO REFUELING OUTAGE
| * | |
ROBINSON 2 | 100 | | | | |
SAINT LUCIE 1 | 100 | | | | |
SAINT LUCIE 2 | 0 | 04/01/2003 | Hot Standby REACTOR MANUALLY TRIPPED FROM 100% POWER - SEE EVENT # 39720
| * | 1 |
SEQUOYAH 1 | 0 | 03/16/2003 | Refueling REFUELING OUTAGE - DEFUELED
| | |
SEQUOYAH 2 | 100 | | | * | |
SUMMER 1 | 100 | | | | |
SURRY 1 | 100 | | | | |
SURRY 2 | 100 | | | | |
TURKEY POINT 3 | 100 | | | | |
TURKEY POINT 4 | 100 | | | | |
VOGTLE 1 | 100 | | | | |
VOGTLE 2 | 100 | | | | |
WATTS BAR 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
BRAIDWOOD 1 | 94 | | Power Operation COASTDOWN TO REFUELING OUTAGE
| | |
BRAIDWOOD 2 | 100 | | | | |
BYRON 1 | 100 | | | | |
BYRON 2 | 100 | | | | |
CLINTON 1 | 91 | | Power Operation 100% ELECTRICAL CAPABILITY
| | |
COOK 1 | 100 | | | | |
COOK 2 | 100 | | | | |
DAVIS BESSE 1 | 0 | 02/15/2002 | Cold Shutdown REFUELING OUTAGE
| | |
DRESDEN 2 | 97 | | Power Operation 100% ELECTRICAL CAPABILITY
| | |
DRESDEN 3 | 77 | | Power Operation INCREASING POWER
| * | |
DUANE ARNOLD 1 | 0 | 03/23/2003 | Refueling REFUELING OUTAGE
| | |
FERMI 2 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE
| | |
KEWAUNEE 1 | 100 | | | | |
LASALLE 1 | 100 | | | | |
LASALLE 2 | 100 | | | | |
MONTICELLO 1 | 100 | | | | |
PALISADES 1 | 0 | 03/16/2003 | Refueling REFUELING OUTAGE
| | |
PERRY 1 | 82 | | Power Operation COASTDOWN TO REFUELING OUTAGE
| * | |
POINT BEACH 1 | 100 | | | | |
POINT BEACH 2 | 100 | | | | |
PRAIRIE ISLAND 1 | 100 | | | | |
PRAIRIE ISLAND 2 | 100 | | | | |
QUAD CITIES 1 | 98 | | Power Operation 100% ELECTRICAL CAPABILITY
| | |
QUAD CITIES 2 | 97 | | Power Operation 100% ELECTRICAL CAPABILITY
| | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
ARKANSAS NUCLEAR 1 | 100 | | | | |
ARKANSAS NUCLEAR 2 | 100 | | | | |
CALLAWAY 1 | 0 | 03/22/2003 | Hot Standby PREPARING FOR REACTOR STARTUP
| * | |
COLUMBIA GENERATING | 100 | | | * | |
COMANCHE PEAK 1 | 100 | | | | |
COMANCHE PEAK 2 | 100 | | | | |
COOPER 1 | 0 | 02/23/2003 | Refueling REFUELING OUTAGE
| | |
DIABLO CANYON 1 | 100 | | | | |
DIABLO CANYON 2 | 60 | | Power Operation INCREASING POWER
| * | |
FT CALHOUN 1 | 100 | | | | |
GRAND GULF 1 | 100 | | | | |
PALO VERDE 1 | 97 | | Power Operation RCS T hot Temperature Limited
| * | |
PALO VERDE 2 | 98 | | Power Operation RCS T hot Temperature Limited
| | |
PALO VERDE 3 | 0 | 03/28/2003 | Refueling REFUELING OUTAGE
| * | |
RIVER BEND 1 | 0 | 03/16/2003 | Refueling REFUELING OUTAGE
| | |
SAN ONOFRE 2 | 100 | | | | |
SAN ONOFRE 3 | 100 | | | | |
SOUTH TEXAS 1 | 0 | 03/25/2003 | Refueling REFUELING OUTAGE
| | |
SOUTH TEXAS 2 | 100 | | | | |
WATERFORD 3 | 100 | | | | |
WOLF CREEK 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Wednesday, March 24, 2021