The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for January 27, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 90   REDUCED POWER FOR WATERBOX CLEANING *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 86   HOLDING POWER LEVEL AFTER NI CALIBRATIONS.    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 96   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 100        
MILLSTONE 3 81   COASTDOWN TO REFUELING OUTAGE    
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 49   INCREASING POWER *  
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 0 10/20/2000 LOW POWER PHYSICS TESTING - EXITING REFUELING OUTAGE *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 50   REDUCED POWER FOR CONDENSER TUBE INSPECTION AND REPAIR *  
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 55   REDUCING POWER FOR REPAIR OF MOISTURE SEPARATOR REHEATER MANWAY LEAK, SCRAM TIME TESTING AND ROD SEQUENCE EXCHANGE *  
HATCH 2 100        
MCGUIRE 1 0 01/23/2001 MAINTENANCE OUTAGE    
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 96   COASTDOWN TO REFUELING OUTAGE    
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100   .    
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 0 10/07/2000 REFUELING OUTAGE - DEFUELED - 'A' HOT LEG REPAIRS IN PROGRESS    
SURRY 1 98   INCREASING POWER FOLLOWING TURBINE VALVE TEST *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 0 01/25/2001 MANUAL REACTOR TRIP DUE TO DROPPED RODS. SEE EVENT # 37691. *  
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 100        
COOK 1 99        
COOK 2 5   INCREASING POWER *  
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 100        
KEWAUNEE 1 96   MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES *  
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100     *  
PALISADES 1 100     *  
PERRY 1 85   VALVE TESTING - COASTDOWN TO REFUELING OUTAGE *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 0 01/19/2001 REFUELING OUTAGE    
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 88   SUSPECT HIGH PRESSURE FEEDWATER HEATER "1B" TUBE LEAK. *  
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 98     *  
PALO VERDE 2 99        
PALO VERDE 3 99     *  
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 01/02/2001 EXITING REFUELING OUTAGE    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021