Part 21 Report - 1995-147
ACCESSION #: 9506220313
Cooper Industries
Cooper-Bessemer
Reciprocating Products Division
150 Lincoln Avenue
Grove City, PA 16127-1898
412 458-8000
June 15, 1995 COOPER
Cooper Energy Services
Our Ref: QCG-10167
Document Control Desk
U.S. Nuclear Regulatory Commission Enterprise
Washington, D.C. 20555 Report #167
Dear Sir:
In accordance with the requirements of the Nuclear Regulatory Commission
Title 10, Chapter 1, Code of Federal Regulations, Part 21, Cooper-
Bessemer Reciprocating Products Division, a division of Cooper
Industries, hereby notifies the Commission of a potential defect in a
component of a DSRV and DSR Enterprise Standby Diesel Generator System.
There exists a potential problem with a Bellofram Air Cylinder, Cooper
part number AJ-009-000 which is used to control a butterfly valve in the
diesel engine intake air system. These air cylinders are installed on
all nuclear Enterprise EDG's currently in service.
UTILITY SITE SERIAL NO. MODEL
LILCO Shoreham 74010-12 DSR-48
ENTERGY Grand Gulf 74033-34 DSRV-16-4
GULF STATES River Bend 74039-40 DSR-48
CP&L Shearon Harris 74046-48 DSRV-16-4
DUKE Catawba 75017-20, DSRV-16-4
74049
CLEVELAND ELEC Perry 75051-54 DSRV-16-4
TVA Bellefonte 75080-83 DSRV-16-4
TVA Hartsville 77024 DSRV-16-4
TU ELECTRIC Comanche Peak 76001-04 DSRV-16-4
GEORGIA POWER Vogtle 76021-24 DSRV-16-4
INTERNATIONAL SITES
KOREA ELECTRIC KORI 3 & 4 79029-32 DSRV-16-4
KOREA ELECTRIC Yonggwang 1 & 2 81021-24 DSRV-16-4
TAIWAN Kuosheng 75005-08 DSR-48
TAIWAN Maanshan 78006-09 DSRV-16-4
Page 2
QCG-10167
June 15, 1995
On May 16, 1995, a newly installed air cylinder failed at Grand Gulf
Nuclear Station on engine S/N 74033, during their refueling outage RF07,
after fewer than 12 actuations the left bank air cylinder piston/rod
assembly separated which allowed the butterfly valve to go closed. With
the left bank butterfly valve closed, the engine tried to maintain load
with the right bank cylinders, which caused the right bank turbocharger
to be overloaded and the EDG was shut down.
Inspection of the failed cylinder revealed that the piston/piston rod
assembly had failed in the area where they were joined by projection
welding. The root cause of this failure was a poor quality weld between
the piston/piston rod.
Cooper-Bessemer has discussed this failure with the manufacturer of the
air cylinder, Bellofram Corporation, and has reviewed their processes
utilized in manufacturing and testing of the affected cylinder.
Bellofram Corporation reports no known failures in other commercial
applications of this type of air cylinder. Cooper-Bessemer also has no
previously reported failures of this cylinder. Based on this information
from Bellofram, Cooper-Bessemer has judged this failure to be an isolated
incident, with no further corrective action required at affected
utilities or at Cooper-Bessemer.
Our investigation into this matter was concluded on June 12, 1995. If
you have any questions concerning this report, please contact Ronald G.
Billig, Supervisor, Enterprise Engineering or John R. Schneider, Quality
Assurance Manager at 412-458-8000.
Sincerely,
COOPER CAMERON CORPORATION
John D. Mowery
Vice President and
General Manager
JDM/kll
cc: J. R. Schneider - CES/GC
B. R. Sedelmyer - CES/GC
A. D. Gillette - CES/GC
D. T. Blizzard - CES/GC
J. M. Horne - CES/GC
R. G. Billig- CES/GC
B. C. Guntrum - CES/Alameda
R. L. Nimmo - CES/Alameda
Lee Duck - CES/Alameda
Page 3 June 15, 1995 QCG-10167
Copied to:
S. S. OwYoung - CES/Alameda
J. R. Andrews - CES/Alameda
R. A. Johnston - CES/Alameda
File: K5fa35 - Bellofram Air Cyl.
Mr. Walter Haass - NRC
One White Flint North
Mailstop 9D4
Washington, DC 20555
Entergy Operations
P. O. Box 429
Echelon One
1340 Echelon Parkway
Jackson, MS 39286-1995
Attn: T. H. Cloninger
Vice Pres. Nucl. Eng.
Carolina Power and Light Co.
Harris Nuclear Project
P. O. Box 165
New Hill, NC 27562
Attn: William Robinson
Plant Gen. Mgr.
Carolina Power and Light Co.
P. O. Box 1551
Raleigh, NC 27602
Attn: W. S. Orser
Exec. Vice President
Carolina Power and Light Co.
Shearon Harris Nuclear Project
P. O. Box 165
New Hill, NC 27562
Attn: Mickey Hamby
Carolina Power and Light Co.
Brunswick Nuclear Plant
NC Hwy. 87, 2-1/2 Mi. North
Southport, NC 28461
Attn: Roy A. Anderson
Vice President
Page 4 June 15, 1995 QCG-10167
Copied to:
Carolina Power and Light Co.
Robinson Nuclear Project
SC Hwy. 151 and 23, Box 790
Hartsville, SC 29550
Attn: C. S. Hinnant
Vice President
Cleveland Electric Illuminating
Perry Nuclear Power Plant
P. O. Box 97
Perry, OH 44081
Attn: M. Lister
Cleveland Electric Illuminating
Perry Nuclear Power Plant
P. O. Box 97
Perry, OH 44081
Attn: Russell J. Tadych
Manager, Quality Control
Cleveland Electric Illuminating
Perry Nuclear Power Plant
P. O. Box 97
Perry, OH 44081
Attn: Harold M. Coon
Cooper-Enterprise Clearinghouse
Duke Engineering & Service
230 South Tryon St.
P.O. Box 1004
Charlotte, NC 28201-1004
Attn: G. A. Harrison
Duke Power Co.
Nuclear Generation Dept.
P. O. Box 1007
Charlotte, NC 28201-1007
Attn: Mgr., Nuclear Safety
Duke Power Co.
Nuclear Generation Dept.
P. O. Box 1007
Charlotte, NC 28201-1007
Attn: W. T. Robertson
V. P. Procurement
Page 5 June 15, 1995 QCG-10167
Copied to:
Entergy
P. O. Box 429
Echelon One
1340 Echelon Parkway
Jackson, MS 39286-1995
Attn: F. W. Titus
Vice President, Engineering
Entergy
P. O. Box 756
Port Gibson, MS 39150
Attn: C. R. Hutchinson
Vice Pres., Operations-GGNS
Entergy
P. O. Box 756
Port Gibson, MS 39150
Attn: D. L. Pace, Director
Design Engineering-GGNS
Entergy
P. O. Box 756
Port Gibson, MS 39150
Attn: M. J. Meisner
Director, NS & RA
Manager, Quality Services
Entergy Operations
Box 756
Port Gibson, MS 39150
Southern Nuclear Operating Company
Vogtle Project
P. O. Box 1295
Birmingham, AL 35201
Attn: Mgr., Engineering
and Licensing
Georgia Power Co.
Plant Vogtle
P. O. Box 1600
Waynesboro, GA 30830
Attn: Mr. W. B. Shipman
General Manager
Page 6 June 15, 1995 QCG-10167
Copied to:
Gulf States Utilities
P. O. Box 220
St. Francisville, LA 70775
Attn: L. A. England
Director Nuclear Licensing
Long Island Power Authority
Shoreham Nuclear Power Station
North Country Rd.
Wading River, NY 11792
Attn: Mgr. Licensing & Regulatory
Compliance Department
Tennessee Valley Authority
1101 Market Street, LP 4F
Chattanooga, TN 37402
Attn: Mr. M. J. Fecht
Manager, Nuclear Experience Review
TU Electric - Production Division
Group Vice President - Nuclear
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, TX 75201
Attn: C. L. Terry
Mr. Koh, Kyoo-Kun
Plant Mgr., Kori 3 & 4
Korea Electric Power Corp.
216 Ko-Ri Jangan-Up Yangsan-Gun
Kyung-Nam, Korea 626-950
Mr. Hong, Jo Boo
Manager, Nuclear Power Generation Dept.
Korea Electric Power Corporation
167, Samsong-Dong, Kangnam KU
Seoul, 137-791 Korea
Mr. Lee, Hee-Sung
Plant Mgr., Yonggwang Nuclear Unit 1 & 2
Korea Electric Power Co.
517, Kyema-Ri Hong Nong-Eup
Yonggwang-Gun Jeon Nam
Korea 513-880
Page 7 June 15, 1995 QCG-10167
Copied to:
Mr. T. R. Ho, Superintendent
Taiwan Power Company
Kuosheng Nuclear Power Station
60 Pa-Tou Yeh-Liu Village
Wan Li Hsiang, Taipei Hsien
(20703), Taiwan, R.O.C.
Mr. A. H. Jeng
Director, Nuclear Safety Dept.
Taiwan Power Company
242 Roosevelt Road, Section 3
Taipei 100, Republic of China
Mr. S. H. Soong
Station Superintendent
Third Nuclear Power Station
Taiwan Power Company
P. O. Box 39
Heng-Chun, Ping-Tung Hsein
Taiwan, 924 R.O.C.
*** END OF DOCUMENT ***