WATTS BAR NUCLEAR PLANT (WBN) UNITS 1 AND 2 - 10 CFR 50.55(e)
INTERIM
REPORT

The purpose of this letter is to provide an interim report to NRC
in
accordance with the requirements of 10 CFR 50.55 (e)(1)(i).

On February 3, 1995, Problem Evaluation Report (PER) WBPER950078
was
initiated to document an apparent failure to follow the
requirements of
Site Standard Practice (SSP) 3.04, "Corrective Action Program."
The
problem identified in the PER was that some contractor
individuals may
not have been documenting conditions adverse to quality through
any of
the WBN Administrative Control Programs identified in SSP-3.04.

10 CFR 50.55(e)(1)(i) requires that deficiencies must be
evaluated for
reportability within 60 days of discovery.  Additional time is
required
to determine whether the undocumented deficiencies in WBPER950078
could
have created a substantial safety hazard, if left uncorrected. 
This
action will be completed by June 3, 1995.

The Enclosure identifies the commitment made in this submittal.


U.S.  Nuclear Regulatory Commission
Page 2

APR 3 1995

If you should have any questions, contact P. L. Pace at
(615)-365-1824.

Sincerely,


Raul R.  Baron
Nuclear Assurance
     and Licensing Manager (Acting)

Enclosure
cc (Enclosure):
     INPO Record Center
     700 Galleria Parkway
     Atlanta, Georgia 30339

     NRC Resident Inspector
     Watts Bar Nuclear Plant
     Rt.  2, Box 700
     Spring City, Tennessee 37381

     Mr. P. S. Tam, Senior Project Manager
     U.S. Nuclear Regulatory Commission
     One White Flint North
     11555 Rockville Pike
     Rockville, Maryland 20852

     U.S. Nuclear Regulatory Commission
     Region II
     101 Marietta Street, NW, Suite 2900
     Atlanta, Georgia 30323


                               ENCLOSURE 1

                 WATTS BAR NUCLEAR PLANT - UNITS 1 AND 2
      10 CFR 50.55(e)REPORTABILITY DETERMINATION EXTENSION
REQUEST
                        DOCKET NOS.  50-390, 391

                           LIST OF COMMITMENTS

The substantial safety hazard evaluation for WBPER950078 will be
completed by June 3, 1995.