Part 21 Report - 1995-140
ACCESSION #: 9504140101
TVA
Tennessee Valley Authority,
Post Office Box 2000, Spring City, Tennessee 37381
APR 3 1995
U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk
Washington, D.C. 20555
Gentlemen:
In the Matter of the Application of ) Docket Nos. 50-390
Tennessee Valley Authority ) 50-391
WATTS BAR NUCLEAR PLANT (WBN) UNITS 1 AND 2 - 10 CFR 50.55(e)
INTERIM
REPORT
The purpose of this letter is to provide an interim report to NRC
in
accordance with the requirements of 10 CFR 50.55 (e)(1)(i).
On February 3, 1995, Problem Evaluation Report (PER) WBPER950078
was
initiated to document an apparent failure to follow the
requirements of
Site Standard Practice (SSP) 3.04, "Corrective Action Program."
The
problem identified in the PER was that some contractor
individuals may
not have been documenting conditions adverse to quality through
any of
the WBN Administrative Control Programs identified in SSP-3.04.
10 CFR 50.55(e)(1)(i) requires that deficiencies must be
evaluated for
reportability within 60 days of discovery. Additional time is
required
to determine whether the undocumented deficiencies in WBPER950078
could
have created a substantial safety hazard, if left uncorrected.
This
action will be completed by June 3, 1995.
The Enclosure identifies the commitment made in this submittal.
U.S. Nuclear Regulatory Commission
Page 2
APR 3 1995
If you should have any questions, contact P. L. Pace at
(615)-365-1824.
Sincerely,
Raul R. Baron
Nuclear Assurance
and Licensing Manager (Acting)
Enclosure
cc (Enclosure):
INPO Record Center
700 Galleria Parkway
Atlanta, Georgia 30339
NRC Resident Inspector
Watts Bar Nuclear Plant
Rt. 2, Box 700
Spring City, Tennessee 37381
Mr. P. S. Tam, Senior Project Manager
U.S. Nuclear Regulatory Commission
One White Flint North
11555 Rockville Pike
Rockville, Maryland 20852
U.S. Nuclear Regulatory Commission
Region II
101 Marietta Street, NW, Suite 2900
Atlanta, Georgia 30323
ENCLOSURE 1
WATTS BAR NUCLEAR PLANT - UNITS 1 AND 2
10 CFR 50.55(e)REPORTABILITY DETERMINATION EXTENSION
REQUEST
DOCKET NOS. 50-390, 391
LIST OF COMMITMENTS
The substantial safety hazard evaluation for WBPER950078 will be
completed by June 3, 1995.
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021