Part 21 Report - 1995-133
ACCESSION #: 9309140175 LICENSEE EVENT REPORT (LER) FACILITY NAME: Maine Yankee Atomic Power Company PAGE: 1 OF 3 DOCKET NUMBER: 05000 TITLE: Multiple 480 Volt Breaker Trips Caused by RMS-9 Trip Devices EVENT DATE: 08/04/93 LER #: 93-016-00 REPORT DATE: 09/06/93 OTHER FACILITIES INVOLVED: DOCKET NO: 05000 OPERATING MODE: 3 POWER LEVEL: 0 THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR SECTION: 50.73(a)(2)(v) & OTHER LICENSEE CONTACT FOR THIS LER: NAME: Danny P. McDougold, Nuclear Safety TELEPHONE: (207) 882-6321 Engineer COMPONENT FAILURE DESCRIPTION: CAUSE: B SYSTEM: ED COMPONENT: BKR MANUFACTURER: GE REPORTABLE NPRDS: Y SUPPLEMENTAL REPORT EXPECTED: YES EXPECTED SUBMISSION DATE: 10/22/93 ABSTRACT: This report is being submitted in accordance with two other reporting requirements: 1. Written report for 10 CFR Part 21 2. Special report to the commission as required by Technical Specification 3.23 remedial action for P-4, Electric-driven fire pump, being inoperable for greater than 7 days. On July 30, 1993, Maine Yankee (MY) was cooling down in preparation for refueling. At 1022 hrs. while in the transthermal condition, a 480 volt ground alarm was received and P-29D service water [SW] pump [P] tripped. The pump's air circuit breaker [ACB] had opened, causing a SW low pressure alarm, and an operator immediately started a standby pump. Normally a single ground fault will not actuate the RMS-9 device, which serves as an overcurrent protection on the breakers in the ungrounded 480 volt buses. This device was designed with long-time/short-time trip functions for motor control circuit (MCC) loads and instantaneous trip functions for motor loads, chosen to coordinate with the upstream and downstream protective devices. This coordination ensures that an overcurrent condition on a load would not result in de-energizing the entire bus or any upstream load. The RMS-9 trip device was certified by GE as a suitable replacement for the EC trip units that were originally installed in GE AK circuit breakers. The RMS-9 trip devices were installed in all AK-25 breakers at MY for both safeguards and non-safeguards 480 volt buses. There are eight AK-25 circuit breakers which control loads required to mitigate an accident. These include 4 (2 on each of two trains) service water pumps (which provide the ultimate heat sink for engineered safeguards), and 4 (2 on each of two trains) which feed various instrumentation, valves and other equipment necessary for engineered safeguards. In addition one breaker feeds an electric driven fire pump and one is the output breaker of an auxiliary diesel generator which is used to meet 10 CFR Part 50 Appendix R requirements. END OF ABSTRACT TEXT PAGE 2 OF 3 This report is being submitted in accordance with two other reporting requirements: 1. Written report for 10 CFR Part 21 2. Special report to the commission as required by Technical Specification 3.23 remedial action for P-4, Electric-driven fire pump, being inoperable for greater than 7 days. On July 30, 1993, Maine Yankee (MY) was cooling down in preparation for refueling. At 1022 hrs. while in the transthermal condition, a 480 volt ground alarm was received and P-29D service water [SW] pump [P] tripped. The pump's air circuit breaker [ACB] had opened, causing a SW low pressure alarm, and an operator immediately started a standby pump. Normally a single ground fault will not actuate the RMS-9 device, which serves as an overcurrent protection on the breakers in the ungrounded 480 volt circuits. This device was designed with long-time/short-time trip functions for motor control circuit (MCC) loads and instantaneous trip functions for motor loads, chosen to coordinate with the upstream and downstream protective devices. This coordination ensures that an overcurrent condition on a load would not result in de-energizing the entire bus or any upstream load. The RMS-9 trip device was certified by GE as a suitable replacement for the EC trip units that were originally installed in GE AK circuit breakers. The RMS-9 trip devices were installed in all AK-25 breakers at MY for both safeguards and non-safeguards 480 volt buses. There are eight AK-25 circuit breakers which control loads required to mitigate an accident. These include 4 (2 on each of two trains) service water pumps (which provide the ultimate heat sink for engineered safeguards), and 4 (2 on each of two trains) which feed various instrumentation, valves and other equipment necessary for engineered safeguards. In addition one breaker feeds an electric driven fire pump and one is the output breaker of an auxiliary diesel generator which is used to meet 10 CFR Part 50 Appendix R requirements. On July 30, 1993, electricians did not identify any RMS-9 trip flags present on the P-29D breaker. A 74 device flag on the 480 volt bus 8 was present; this flag indicates a system ground and sends a signal to the panalarm. P-29D motor and breaker were meggered with satisfactory results. At 1200 hrs., P-29D was restarted and experienced no initial problems. At 1345 hrs., the P-29D breaker again tripped open. This time, MCC-8B feeder breaker also tripped open. P-29D is powered from Bus 8, which also feeds MCC-8B. MCC-8B subsequently feeds MCC-8B1. The MCC-8B feeder breaker trip therefore resulted in loss of both MCC-8B and MCC-8B1. The deenergized buses made several motor operated valves inoperable including containment integrity valves which required entry into a 4 hour remedial action of Technical Specifications. Only one ECCS train was required at the time and the "A" train remained operable. Investigation of the ground continued until 0130 hrs. on July 31, 1993. The ground was located in the Boric Acid Mix Tank (BAMT) startup heaters. The ACB spurious trip problem is believed to be attributed to the RMS-9 trip devices initiating breaker trips when short duration current transients were induced by a ground fault spike. This spike can result in "sympathetic" trips occurring on other 480 volt breakers powered from parallel circuits of a 480 volt ground. There is no operational experience of a ground fault affecting other buses unless cross-tied. MY believes the delta-delta transformer connection isolates the fault to the affected bus. On August 4, 1993, MY determined that during a Loss of Coolant Accident (LOCA) non-environmentally qualified (EQ) components or cable could degrade and cause grounds. The resulting current spikes could result in spurious tripping and de-energizing of equipment needed to mitigate the consequences of an accident. The safety significance of this postulated event is that some systems required to mitigate an accident could be spuriously de-energized. Operational experience has shown that the ACBs can be reclosed within a few minutes even with the ground fault present, if the RMS-9 trip device has no flags (indicating no true overcurrent condition). MY is considering various alternatives to correct the RMS-9 trip device deficiency prior to plant startup. A supplemental LER will be issued to state the corrective actions. TEXT PAGE 3 OF 3 P-4, electric driven fire pump, is considered inoperable until the RMS-9 condition is corrected. P-5, diesel fire pump, remains operable to supply water under all necessary conditions. While shutdown, the engineered safeguards equipment that are affected by the RMS-9 devices, are either not necessary or do not need automatic action. The Residual Heat Removal (RHR) system, cooled by SW, can be stopped momentarily, without consequence, until the breakers are reclosed. ATTACHMENT 1 TO 9309140175 PAGE 1 OF 1 Maine Yankee RELIABLE ELECTRICITY SINCE 1972 EDISON DRIVE o AUGUSTA, MAINE 04330 o (207) 622-4868 September 2, 1993 MN-93-81 JRH-93-178 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555 Reference: (a) License No. DPR-36 (Docket No. 50-309) Subject: Maine Yankee Licensee Event Report 93-016, Multiple 480 Volt Breaker Trips Caused by RMS-9 Trip Devices Gentlemen: Please find enclosed Maine Yankee Licensee Event Report 93-016-00. This report is submitted in accordance with 10CFR50.73(a)(2)(v) and 10 CFR 21. Please contact us should you have questions regarding this matter. Very truly yours, James R. Hebert, Manager Licensing & Engineering Support Department SJB/jag Enclosure c: Mr. Thomas T. Martin Mr. Charles S. Marschall Mr. E. H. Trottier Mr. Patrick J. Dostie L:\93MN\9381 *** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021