Event Notification Report for June 10, 2017

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
06/09/2017 - 06/10/2017

EVENT NUMBERS
52800
Power Reactor
Event Number: 52800
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: SCOTT LABUNSKI
HQ OPS Officer: JEFF HERRERA
Notification Date: 06/11/2017
Notification Time: 01:00 [ET]
Event Date: 06/10/2017
Event Time: 22:56 [CDT]
Last Update Date: 06/11/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
ROBERT ORLIKOWSKI (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 99 Power Operation 0 Hot Shutdown
Event Text
MANUAL REACTOR SCRAM DUE TO LOSS OF FEEDWATER HEATING

At 2256 CDT on 6/10/17, Clinton operators manually scrammed the reactor from 99 percent power due to a loss of feedwater heating. The scram was uncomplicated and the plant is stable and in mode 3. All rods inserted and decay heat is being removed by the condenser. All offsite power is available. The cause of the loss of feedwater heating is under investigation.

The NRC Resident Inspector and the State of Illinois have been notified.