Event Notification Report for August 24, 2014

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/23/2014 - 08/24/2014

EVENT NUMBERS
50396
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 50396
Facility: POINT BEACH
Region: 3     State: WI
Unit: [] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: ALEX RIVAS
HQ OPS Officer: JEFF ROTTON
Notification Date: 08/24/2014
Notification Time: 03:23 [ET]
Event Date: 08/24/2014
Event Time: 00:00 [CDT]
Last Update Date: 10/01/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
DAVE PASSEHL (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 99 Power Operation
Event Text
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO POST ACCIDENT MONITORING INSTRUMENTATION OUT OF SERVICE

"At 0039 [CDT] on 8/19/14, Point Beach Nuclear Plant, Unit 2 identified that 2TE-451A and 2TE-451C Cold Leg Temperature RTDs were out of service. Technical Specification 3.3.3, Post Accident Monitoring (PAM) Instrumentation, Action Condition C for one or more functions with two required channels inoperable was entered. Action Condition C requires one channel to be restored to OPERABLE status within 7 days. If completion time in Action Condition C cannot be met, Action Condition D will be entered, which requires entry into Action Condition E. Action Condition E would require Unit 2 to be in Mode 3 in 6 hours and Mode 4 in 12 hours thereafter.

"Unit 2 is being shut down to effect repairs within the 7 day required action completion time for Action Condition C. This event is reportable under 10 CFR 50.72(b)(2)(i), Plant Shutdown Required by Technical Specifications. The Resident Inspector has been informed."

* * * RETRACTION FROM ALEX RIVAS TO HOWIE CROUCH AT 2337 EDT ON 10/1/14 * * *

"Point Beach is retracting EN# 50396 made on August 24, 2014 at 0323 EDT. Technical Specification 3.3.3. Post-Accident Monitoring (PAM) Instrumentation, Action Condition C for one or more functions with two required channels inoperable was entered. Action Condition C requires one channel to be restored to OPERABLE status within 7 days. The Unit 2 TE-451A and TE-451C Cold Leg Temperature RTDs inoperable condition was corrected and the plant returned to power before expiration of the 7 day period specified in Condition C of Technical Specification 3.3.3. Reference example (3) Failure that was or could have been corrected before shutdown was required, of Section 3.2.1, Plant Shutdown Required by Technical Specifications of NUREG-1022, Rev. 3, Event Report Guidelines 10 CFR 50.72 and 50.73."

The licensee has notified the NRC Resident Inspector.

Notified R3DO (McCraw).