Event Notification Report for February 25, 2002
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 02/22/2002 - 02/25/2002 ** EVENT NUMBERS ** 38704 38716 38717 38718 38719 38720 38721 38722 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 38704 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 02/16/2002| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 11:11[EST]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 02/15/2002| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 22:00[CST]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 02/22/2002| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |ANTON VEGEL R3 | | DOCKET: 0707001 |SUSAN FRANT NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: KEVIN BEASLEY | | | HQ OPS OFFICER: FANGIE JONES | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |OCBA 76.120(c)(2) SAFETY EQUIPMENT FAILUR| | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SAFETY EQUIPMENT FAILURE - PROCESS GAS LEAK DETECTION FAILURE | | | | "At 2200 CST, on 02-15-02 the Plant Shift Superintendent (PSS) was notified | | of a failure of the Process Gas Leak Detector (PGLD) system in the C-333 | | building. During above atmospheric operation a PGLD alarm was received in | | the Area Control Room [ACR] on C-333 Unit 4 Cell 4. An operator responded | | to the local cell panel to investigate according to the alarm response | | procedure. Upon arriving at the cell panel the operator discovered that the | | Ready light was not Illuminated on the PGLD panel. At this time the | | operator attempted to test fire the PGLD system, however the system would | | not respond. The Front Line Mgr. and the PSS were immediately notified of | | the system failure. At this time, required TSR 2.4.4.1 LCO continuous smoke | | watches were put in place in the affected areas until repair of the system | | was completed. Following replacement of the power supply by Instrument | | Maintenance and testing by Operations, ten Unit 4 Cell 4 PGLD system was | | declared operable by the PSS at 2340 CST. At this time the TSR required | | smoke watches were discontinued. | | | | "The PGLD system is designed to detect the leakage of process gas from the | | process system and is required to be operable while operating in Cascade | | Mode 2 (Above Atmospheric Pressure). Due to the failure of this TSR | | required system; the PSS has determined that this is reportable as a 24 hour | | Event Report. | | | | "The NRC Resident inspector has been notified of this event." | | | | * * * RETRACTED AT 0346 EST ON 02/22/02 BY ERIC WALKER TO FANGIE JONES * * * | | | | | | "This event has been retracted. Even though the power loss causes the system | | to be incapable of annunciating additional alarms from this system in the | | ACR, the same is true when a PGLD head actuates in response to smoke. The | | system Is designed to alert operators of a release or loss of system power. | | Operator response and the initiation of a smoke watch provide the safety | | function after the initial alarm is annunciated. The NRC resident inspector | | has been notified of this update." | | | | The R3DO (Bruce Jorgensen) and NMSS EO (E. William Brach) have been | | notified. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 38716 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: UTAH DIVISION OF RADIATION CONTROL |NOTIFICATION DATE: 02/22/2002| |LICENSEE: ENVIROCARE OF UTAH, INC. |NOTIFICATION TIME: 13:58[EST]| | CITY: SALT LAKE CITY REGION: 4 |EVENT DATE: 02/21/2002| | COUNTY: STATE: UT |EVENT TIME: [MST]| |LICENSE#: UT 2300249 AGREEMENT: Y |LAST UPDATE DATE: 02/22/2002| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |LINDA HOWELL R4 | | |DOUG BROADDUS | +------------------------------------------------+ | | NRC NOTIFIED BY: JULIE FELICE (VIA FAX) | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT INVOLVING POTENTIAL SALE OF CONTAMINATED TOOLS TO THE | | GENERAL PUBLIC | | | | The Utah Department of Environmental Quality issued an Information Notice on | | February 21, 2002, (text below) concerning the potential of radiologically | | contaminated tools in Tooele County. | | | | "A recent investigation involving Envirocare of Utah, a commercial low-level | | radioactive waste site in western Tooele County, has revealed that a former | | employee of Envirocare's contractor, Broken Arrow Inc., removed contaminated | | tools that were to be disposed of as waste from the Envirocare facility and | | eventually sold the tools to Oquirrh Trading Company, a pawn shop located in | | Tooele, Utah. Records of the Trading Company have revealed the potential | | for a number of tools to have been sold to the public. The period of time | | of concern is from January to December 2001. The tools involved may include | | large ratchet and socket sets, large crescent wrenches and other hand tools. | | The tools may or may not be marked with U.S., U.S. CCC, US EC and may be | | painted red. Some of these contaminated tools were recently recovered by | | inspectors of the Division of Radiation Control at the Trading Company. | | Citizens who may have purchased tools at the Trading Company during the | | period January 2001 - December 2001 may have their tools assessed at the | | Tooele County Health Department, 151 North Main, Tooele beginning Wednesday, | | February 27, 2002, from 10:00 am. - 5:00 p.m., Thursday, February 28, 2002, | | and Monday, March 4, 2002, from 1:00 p.m. - 7:00 p.m.. Tools suspected to | | be contaminated should be handled as little as possible and wrapped in a | | plastic bag to be brought to the Health Department offices for assessment. | | Persons handling suspected tools should wash their hands afterwards. If | | tools are determined to be contaminated, local and state environmental | | health officials will arrange for their proper disposal. | | | | "'While we do not believe these contaminated tools present any significant | | health threat to members of the public, it is prudent to make sure that | | these tools are rounded up and properly disposed,' said Bill Sinclair, | | Director of the Division of Radiation Control. 'We are happy to provide | | facilities and cooperate with the Department of Environmental Quality in | | assuring that our Tooele citizens can have the opportunity to assess if | | there is a problem with tools that may have been purchased at the Trading | | Company,' stated Myron Batman of the Tooele County Health Department. | | | | "Division of Radiation Control inspectors have visited all pawn shops in | | Tooele County and are satisfied that this problem is confined to the one | | business. The investigation is continuing and if the problem is more | | widespread, additional information will be issued as necessary." | | | | UT Event Report ID No.: UT-02-0001. Call the Headquarters Operations | | Officer for contact information. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Hospital |Event Number: 38717 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: DANBURY HOSPITAL |NOTIFICATION DATE: 02/22/2002| |LICENSEE: DANBURY HOSPITAL |NOTIFICATION TIME: 16:11[EST]| | CITY: NORWALK REGION: 1 |EVENT DATE: 02/22/2002| | COUNTY: FAIRFIELD STATE: CT |EVENT TIME: 14:00[EST]| |LICENSE#: 06854401 AGREEMENT: N |LAST UPDATE DATE: 02/22/2002| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |MICHAEL MODES R1 | | |FRED BROWN NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: CARNIE GEE | | | HQ OPS OFFICER: GERRY WAIG | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |LADM 35.33(a) MED MISADMINISTRATION | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | MEDICAL MISADMINISTRATION INVOLVING UNDERDOSE TO CANCER PATIENT | | | | A female patient undergoing brachytherapy treatment for cancer at the | | Danbury Hospital in Norwalk, CT, was prescribed 4600 Rad using a Cs-137 | | source. One of the five seeds (21.23 mg Radium equivalent) was found in a | | trash can. This resulted in an estimated delivered dose of 3458 Rad which | | is 24.8% less than prescribed. All hospital staff entering the area where | | the trash can was located had personal dosimetry such that no unmonitored | | exposures occurred. The licensee is conducting a review to determine | | appropriate corrective actions. The prescribing physician has been informed | | by the hospital. The licensee notified RI Office(Bhalla). Call the | | Headquarters Operations Officer for contact information. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38718 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: POINT BEACH REGION: 3 |NOTIFICATION DATE: 02/22/2002| | UNIT: [] [2] [] STATE: WI |NOTIFICATION TIME: 17:18[EST]| | RXTYPE: [1] W-2-LP,[2] W-2-LP |EVENT DATE: 02/22/2002| +------------------------------------------------+EVENT TIME: 14:48[CST]| | NRC NOTIFIED BY: MIKE MEYER |LAST UPDATE DATE: 02/22/2002| | HQ OPS OFFICER: GERRY WAIG +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |BRUCE JORGENSEN R3 | |10 CFR SECTION: | | |ASHU 50.72(b)(2)(i) PLANT S/D REQD BY TS | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ | | | |2 N Y 100 Power Operation |80 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | UNIT 2 COMMENCED A TS REQUIRED SHUTDOWN AFTER DECLARING A SI PUMP | | INOPERABLE | | | | "On February 20, 2002, at approximately 0100 CST. OI-163, 'SI, RHR, and CS | | Pump Runs,' was being performed on Safety Injection (SI) pump 2P-15B. This | | procedure is used to bump the pump to ensure bearing lubrication as a | | preventive maintenance activity. When the pump was started, motor current | | increased as normal, but then decayed to less than 10 amps. Additionally, | | the pump appeared to develop no discharge pressure. In the field, the | | auxiliary operator noted a loud bang near the end of the coastdown and | | further noted excessive seal leakage. At approximately 0105 CST, SI pump | | 2P-15B was declared inoperable, LCO 3.5.2 was declared not met, and TS | | Action Condition A.1 was entered. Tech Spec LCO 3.5.2. ECCS-Operating, | | requires two ECCS trains to be operable in Modes 1, 2, and 3. LCO 3.5.2, | | Condition A, requires an inoperable ECCS train to be restored to an operable | | status within 72 hours. | | | | "Subsequent inspection of the pump following disassembly of the casing | | revealed damage to the rotating element, the coupling and shaft keys between | | the pump and the motor, the pump internal wear rings, and other components. | | At this time, we believe the pump damage was due to gas binding in the pump | | as a result of back leakage through two check valves. This allowed nitrogen | | saturated water from the 'A' SI accumulator to migrate to the 2P-15B pump. | | Repair of the pump has proceeded with the expectation that the pump would be | | repaired, tested and returned to service prior to the expiration of the 72 | | hours allowed in the action statement. However, as of approximately 1400 | | CST, we determined that we were unlikely to complete the remaining repairs | | and the required pump testing before the expiration of the action statement. | | Accordingly, at that time activities were initiated to commence a shutdown | | of PBNP Unit 2 and at approximately 1448 CST the shutdown of the unit was | | initiated." | | | | The licensee is decreasing power at 30%/hr and anticipates entry into Mode 3 | | at approximately 1930CST. The licensee informed the NRC Resident | | Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38719 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: TURKEY POINT REGION: 2 |NOTIFICATION DATE: 02/22/2002| | UNIT: [3] [] [] STATE: FL |NOTIFICATION TIME: 17:34[EST]| | RXTYPE: [3] W-3-LP,[4] W-3-LP |EVENT DATE: 02/22/2002| +------------------------------------------------+EVENT TIME: 15:00[EST]| | NRC NOTIFIED BY: B. ADAMS |LAST UPDATE DATE: 02/22/2002| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |LEONARD WERT R2 | |10 CFR SECTION: | | |ACOM 50.72(b)(3)(xiii) LOSS COMM/ASMT/RESPONSE| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |3 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | LOSS OF ASSESSMENT CAPABILITY DUE TO FAILURE OF THE ERDADS SYSTEM | | | | "A failure of the ERDADS [Emergency Response Data Acquisition and Display | | System] computer due to errors in the primary and backup systems. This | | resulted in the loss of all ERDADS data. The failure also resulted in the | | loss of offsite communications capability (ERDADS link)." | | | | The licensee informed the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 38720 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 02/23/2002| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 10:58[EST]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 02/22/2002| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 16:30[CST]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 02/23/2002| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |BRUCE JORGENSEN R3 | | DOCKET: 0707001 |E. WILLIAM BRACH NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: WHITE | | | HQ OPS OFFICER: CHAUNCEY GOULD | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NONR OTHER UNSPEC REQMNT | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ACTIVATION OF THE WATER INVENTORY CONTROL SYSTEM | | | | At 1630 CST, on 2/22/02 the Plant Shift Superintendent (PSS) was notified of | | an activation of the Water Inventory Control System (WICS) on #1 autoclave | | in the C-360 building. Approximately 50 minutes into the heat cycle, the | | Hi Primary Condensate alarm was received, and steam supply to the autoclave | | was automatically isolated. Operators investigated the alarm. The | | autoclave was removed from service, and the WICS was declared inoperable. | | Further investigation will be performed by the System Engineer and | | Instrument Maintenance to determine the exact cause of the alarm. The | | purpose of the WICS is to limit the amount of water in the autoclave and is | | a safety system required by TSR 2.1.4.3. | | | | The PSS determined that this event is a 24 Hour Event Report due to a valid | | automatic activation of a Q safety system. | | | | The NRC Senior Resident Inspector has been notified of this event. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38721 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: INDIAN POINT REGION: 1 |NOTIFICATION DATE: 02/23/2002| | UNIT: [2] [] [] STATE: NY |NOTIFICATION TIME: 16:40[EST]| | RXTYPE: [2] W-4-LP,[3] W-4-LP |EVENT DATE: 02/23/2002| +------------------------------------------------+EVENT TIME: 16:25[EST]| | NRC NOTIFIED BY: PHIL SANTINI |LAST UPDATE DATE: 02/23/2002| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |MICHAEL MODES R1 | |10 CFR SECTION: |MICHAEL CASE NRR | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |2 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION TO STATE POLICE | | | | "At 10:45, [the Control Room] received notification from Shift Security | | Supervisor that at 09:45 a security officer on duty in the central alarm | | station was escorted offsite and remanded to State Police for questioning | | following an apparent incident of horseplay with a duty weapon. The | | security officer surrendered his weapons to company security personnel and | | was immediately relieved of duty. The Shift Security Supervisor notified | | the USNRC Region I security inspector at approximately 11:00. The security | | force remained fully staffed throughout this event and remains fully | | staffed." | | | | The licensee determined that the notification to the State Police was | | reportable as an offsite notification per 10CFR50.72(b)(2)(xi) at 1625EST. | | The NRC Resident Inspector was informed of this report by the licensee. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38722 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: HATCH REGION: 2 |NOTIFICATION DATE: 02/25/2002| | UNIT: [1] [] [] STATE: GA |NOTIFICATION TIME: 04:25[EST]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 02/25/2002| +------------------------------------------------+EVENT TIME: 04:15[EST]| | NRC NOTIFIED BY: STONE |LAST UPDATE DATE: 02/25/2002| | HQ OPS OFFICER: CHAUNCEY GOULD +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |LEONARD WERT R2 | |10 CFR SECTION: | | |ACOM 50.72(b)(3)(xiii) LOSS COMM/ASMT/RESPONSE| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 95 Power Operation |95 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | SAFETY PARAMETER DISPLAY SYSTEM (SPDS) OUT OF SERVICE | | | | The SPDS was removed from service for the purpose of implementing a | | modification to replace the system. The primary means of monitoring the | | critical parameters remains available to the operating crew and they will | | continue to be able to perform the necessary actions regarding emergency | | assessment. | | | | The NRC Resident Inspector will be notified. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021