Event Notification Report for July 30, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/27/2001 - 07/30/2001 ** EVENT NUMBERS ** 38139 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38139 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PILGRIM REGION: 1 |NOTIFICATION DATE: 07/13/2001| | UNIT: [1] [] [] STATE: MA |NOTIFICATION TIME: 14:52[EDT]| | RXTYPE: [1] GE-3 |EVENT DATE: 07/13/2001| +------------------------------------------------+EVENT TIME: 08:55[EDT]| | NRC NOTIFIED BY: JOHN MacDONALD |LAST UPDATE DATE: 07/27/2001| | HQ OPS OFFICER: STEVE SANDIN +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |ANTHONY DIMITRIADIS R1 | |10 CFR SECTION: | | |AINA 50.72(b)(3)(v)(A) POT UNABLE TO SAFE SD | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | APRM FLOW-BIASED SCRAM SETPOINTS SET NONCONSERVATIVELY | | | | "On July 13, 2001 at 0855 hrs, with the reactor at 100% core thermal power, | | Pilgrim Station determined the Average Power Range Monitoring (APRM) system | | flow-biased reactor scram setpoints were non-conservative and potentially | | exceeded Core Operating Limit Report (COLR) analyses. Programmed Flow | | Control Trip Reference (FCTR) cards establish the APRM flow-biased scram | | setpoints. The FCTR cards are a plant enhancement in response to the BWR | | stability issue. During core flow mapping for FCTR card calibration in | | accordance with station procedure (9.17.1), it was determined by reactor | | engineering personnel that the input setting for the FCTR card DIP switches | | was non-conservative. In response to this event, the APRMs were declared | | inoperable and Technical Specification 3.1 and the Actions of Table 3.1.1 | | were initiated. TS Table 3.1.1 requires that reactor trip capability for the | | given trip function be restored within 1 hour or initiate insertion of | | operable control rods and complete insertion of all operable control rods | | within 4 hours. However, Instrumentation and Controls personnel completed | | FCTR card DIP switch adjustments in accordance with station procedure | | (3.M.2-5.4.s) within approximately 45 minutes. All APRM RPS functions were | | declared operable at 0946 hours and TS 3.1 was exited. The reactor remained | | at 100% core thermal power throughout the event and there were no plant | | transients as a result of the event. | | | | "The cause of the event appears to [be] a lack of administrative controls to | | ensure the FCTR card flow mapping be performed when steady-state 100% core | | thermal power is achieved following refueling outages or significant power | | maneuvers." | | | | The licensee informed the NRC resident inspector and will inform the | | Commonwealth of Massachusetts. | | | | * * * UPDATE AT 1221EDT ON 7/27/01 FROM OLSON TO S. SANDIN * * * | | | | The licensee is retracting this report based on the following: | | | | "Pilgrim Station retracts a report made to the NRC Operations Center on July | | 13, 2001 at 1500 hours. The Event Number was 38139. The report was made | | pursuant to 10 CFR 50.72(b)(3)(v)(A) when it was determined the Average | | Power Range Monitoring (APRM) system flow-biased reactor scram setpoints | | were set non-conservatively. | | | | "Subsequent testing has determined that the setpoints were set | | conservatively and that the APRM flow-biased reactor scram was operable. | | Therefore, no situation existed which was reportable pursuant 10 CFR | | 50.72(b)(3)(v)(A). | | | | "The NRC resident inspector has been informed of this retraction." | | Notified R1DO(White). | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021