Event Notification Report for July 10, 2001
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/09/2001 - 07/10/2001 ** EVENT NUMBERS ** 38088 38122 38123 38124 !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 38088 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 06/23/2001| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 06:04[EDT]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 06/23/2001| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 03:50[CDT]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 07/09/2001| | CITY: PADUCAH REGION: 3 +-----------------------------+ | COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION | |LICENSE#: GDP-1 AGREEMENT: Y |BRUCE JORGENSEN R3 | | DOCKET: 0707001 |PATRICIA HOLAHAN NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: J. M. UNDERWOOD | | | HQ OPS OFFICER: JOHN MacKINNON | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |OCBA 76.120(c)(2) SAFETY EQUIPMENT FAILUR| | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | POWER LOST TO BUILDING BEACON CRITICALITY ACCIDENT ALARM SYSTEM (CAAS). | | | | At 0350 hours on 06/23/01, it was discovered that the CAAS beacons for | | building C-333 were inoperable due to a loss of power. The system is | | required to be operable according to TSR 2.4.4.2.b for the prescribed modes | | of operation. Loss of power to the CAAS beacons occurred during the process | | of returning auxiliary power transformers to service. Power to the beacons | | was lost for a total of approximately 3 minutes. Normal power was | | subsequently restored. The building CAAS detectability and horn audibility | | were not lost due to the power failure. No operations were taking place in | | building C-333 while the CAAS beacons were inoperable but fissile material | | is stored in the building. | | | | The NRC Resident Inspector has been notified of this event by the | | certificate holder. | | | | * * * RETRACTED AT 1630 EDT ON 7/9/2001 BY J. M. UNDERWOOD TO FANGIE JONES * | | * * | | | | The following is taken from a faxed report: | | | | "The PSS's reporting determination was based on the fact that the CAAS | | lights are mentioned in the CAAS TSR 2.4.4.2b Basis Statement. The Basis | | includes a paragraph that describes the quarterly surveillance of the CAAS | | building horns and, in this paragraph, states that the test signal activates | | the high radiation light and bell in C-300 and activates the building CAAS | | horns and lights. This is the only mention of CAAS lights in the CAAS TSR. | | This statement has been interpreted in the past as requiring the CAAS lights | | to be available and operable and, when inoperable, requiring completion of | | the TSR 2.4.4.2b LCO actions and reporting to the NRC per 10CFR76.120 | | (c)(2). | | | | "Since the subject event, NRA has reviewed the TSR, SAR. ANSI/ANS8.3, and | | 10CFR76 and noted the following: | | [1] CAAS TSR 2.4.4.2b requires the CAAS to be operable (audible) and | | prescribes the required actions to be taken when the 'area does not have an | | audible criticality accident alarm'. Audibility is proven by the building | | CAAS horns which were not affected by the subject power failure. There are | | no actions required for loss of the building lights. | | [2] Surveillance requirements 2.4.4.2b-1 and 2.4.4.2b-2 requires quarterly | | testing of the CAAS horns and verification that the CAAS air accumulator | | supply pressure to the building horns is adequate to sound the horns for at | | least 120 seconds. There are no TSR surveillance requirements for the | | building lights. | | [3] ANSI/ANS8.3, 'Criticality Accident Alarm System'. Section 4.3 requires | | audio alarm signals and Section 6.4 requires periodic tests of the signals. | | ANSI/ANS8.3 does not require or recommend visual alarm signals except in | | Section 4.3.8, where visual signals are recommended in areas of very high | | audio background or mandatory hearing protection, neither of which applies | | to areas outside the buildings with CAAS coverage. | | [4] PGDP SAR Section 5.2.2.4 states, 'a CAAS is provided to alert personnel | | if a criticality accident should occur. The system utilizes a distinctive | | audible signal to notify personnel in the affected area and initiate | | evacuation...'. There is no mention of the building lights. | | [5] 10CFR76.89, Criticality Accident Requirements, requires USEC to | | maintain and operate a criticality monitoring and audible alarm system. | | There is no mention of building lights, | | | | "From the information provided, NRA has concluded that CAAS audibility is | | provided solely by the CAAS horns and is not affected by the loss of the | | CAAS lights. Thus, the CAAS building lights are not required to be available | | and operable by the TSR and CAAS operability is not affected when the lights | | are not functional. Since the lights are not required to be available and | | operable by the TSR, the reporting requirement of 10CFR76.120 (c)(2) is not | | met and reporting is not required. In addition, the TSR LCD actions | | prescribed by TSR 2.4.4.2b do not apply to the CAAS lights and are not | | required to be implemented. Based on this information, the subject NRC event | | notification (PAD.01-023) is being retracted." | | | | The licensee notified the NRC Resident Inspector. The R3DO (David Hills) | | and the NMSS EO (Eric Leeds) have been notified. | +------------------------------------------------------------------------------+ !!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!! +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38122 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SUMMER REGION: 2 |NOTIFICATION DATE: 07/09/2001| | UNIT: [1] [] [] STATE: SC |NOTIFICATION TIME: 07:13[EDT]| | RXTYPE: [1] W-3-LP |EVENT DATE: 07/09/2001| +------------------------------------------------+EVENT TIME: 06:30[EDT]| | NRC NOTIFIED BY: FRED LUCAS |LAST UPDATE DATE: 07/09/2001| | HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |EDWARD MCALPINE R2 | |10 CFR SECTION: |DAVIDSON, NMSS IAT | |DDDD 73.71 UNSPECIFIED PARAGRAPH |SKELTON, NRR IAT | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ATTEMPTED INTRODUCTION OF CONTRABAND INTO THE PROTECTED AREA BY A LICENSED | | OPERATOR. IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY. | | | | LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR. | | | | CONTACT THE HEADQUARTERS OPERATIONS OFFICER FOR FURTHER DETAILS. | | | | * * * RETRACTED AT 1517 EDT ON 7/9/2001 BY SUSAN REESE TO FANGIE JONES * * | | * | | | | The licensee is retracting this report following further investigation. | | | | The licensee notified the NRC Resident Inspector. The R2DO (Edward | | McAlpine), NRR IAT (Robert Skelton), and NMSS IAT (Aaron Danis) have been | | notified. | | | | Contact the Headquarters Operations Officer for further details. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38123 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 07/09/2001| | UNIT: [1] [] [] STATE: IL |NOTIFICATION TIME: 13:07[EDT]| | RXTYPE: [1] GE-6 |EVENT DATE: 07/09/2001| +------------------------------------------------+EVENT TIME: 09:00[CDT]| | NRC NOTIFIED BY: JAMIE BARTSCH |LAST UPDATE DATE: 07/09/2001| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |DAVID HILLS R3 | |10 CFR SECTION: | | |AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | CONTROL ROOM VENTILATION SYSTEM DECLARED INOPERABLE | | | | The Division 2 Main Control Room Ventilation System was declared inoperable | | at 0900 CDT on 7/9/2001 because it was not maintaining the required positive | | pressure while running in the High Radiation Mode of operation. The system | | was declared operable at 0913 CDT when the required positive pressure was | | restored. During the 13 minute period Division 2 was inoperable, Division 1 | | Main Control Room Ventilation System was inoperable due to a scheduled | | maintenance outage. Therefore, with both systems inoperable, a condition | | existed which could have prevented the fulfillment of the safety function of | | the Main Control Room Ventilation System needed to mitigate the consequences | | of an accident. The cause of the perturbation in control room pressure is | | being investigated. | | | | The licensee notified the NRC Resident Inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 38124 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: OYSTER CREEK REGION: 1 |NOTIFICATION DATE: 07/09/2001| | UNIT: [1] [] [] STATE: NJ |NOTIFICATION TIME: 14:12[EDT]| | RXTYPE: [1] GE-2 |EVENT DATE: 07/08/2001| +------------------------------------------------+EVENT TIME: 14:30[EDT]| | NRC NOTIFIED BY: MALCOMB BROWN |LAST UPDATE DATE: 07/09/2001| | HQ OPS OFFICER: FANGIE JONES +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |ANTHONY DIMITRIADIS R1 | |10 CFR SECTION: | | |APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | OFFSITE NOTIFICATION DUE TO SEA TURTLE CAPTURE | | | | The licensee notified the National Marine Fisheries Services of the capture | | of an endangered non-injured juvenile green sea turtle in the intake | | structure. The turtle has been released to the Marine Mammal Stranding | | Center. | | | | The licensee intends to notify the NRC Resident Inspector. A written report | | will be sent to the State with copies to the NRC and National Marine | | Fisheries Services. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021