The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for February 21, 2001

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/20/2001 - 02/21/2001

                              ** EVENT NUMBERS **

37719  37757  37766  37767  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37719       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOPER                   REGION:  4  |NOTIFICATION DATE: 02/06/2001|
|    UNIT:  [1] [] []                 STATE:  NE |NOTIFICATION TIME: 10:43[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        02/06/2001|
+------------------------------------------------+EVENT TIME:        01:48[CST]|
| NRC NOTIFIED BY:  S JOBE                       |LAST UPDATE DATE:  02/20/2001|
|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GARY SANBORN         R4      |
|10 CFR SECTION:                                 |                             |
|*DEG 50.72(b)(3)(ii)(A)  DEGRAD COND DURING OP  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PRIMARY CONTAINMENT DECLARED INOPERABLE                                      |
|                                                                              |
| Primary Containment was declared inoperable at 0148 CST on February 6, 2001, |
| due to the failure of meeting the acceptance criteria for the suppression    |
| chamber to drywell vacuum breaker operation.                                 |
|                                                                              |
| While performing the 31 day surveillance, PC-AO-NRV30, suppression chamber   |
| to drywell vacuum breaker failed to indicate full close.  The valve was      |
| subsequently stroked a second time and full closure indication was received. |
| Estimated time of 2 minutes and 6 seconds when valve did not indicate full   |
| close. During this time frame when the valve was not indicating full close,  |
| Primary Containment was inoperable.  Upon full closure of the valve, Primary |
| Containment was returned to operable status.                                 |
|                                                                              |
| Engineering continues to evaluate the condition.  TS action statement of LCO |
| 3.6.1.8 B, requires the vacuum breaker to be closed in 12 hours.  Required   |
| action not completed in the completion time requires the reactor to be in    |
| Mode 3 (Hot Shutdown) in twelve hours in Mode 4 (Cold Shutdown) in           |
| thirty-six hours.                                                            |
|                                                                              |
| The NRC Senior and Resident Inspectors have been notified.                   |
|                                                                              |
| * * * RETRACTED AT 1638 EST ON 2/20/01 BY ANDREW OHRABLO TO FANGIE JONES * * |
| *                                                                            |
|                                                                              |
| "The suppression chamber to drywell vacuum breaker has two types of position |
| indication available. They are a disc position switch, which only provides a |
| red light indication for open, and a hinge position switch, which provides a |
| red light indication for open and a green light indication for closed.       |
| Subsequent evaluation determined that the hinge position indication did show |
| the vacuum breaker in the closed position upon the initial stroking and is   |
| adequate for making this determination, i.e., proper calibration. The disc   |
| position switch did not turn out the red indication light because of the     |
| slow closure of the disc due to what is believed to be a faulty              |
| non-essential air operator.                                                  |
|                                                                              |
| "CNS investigation has found that the suppression chamber to drywell vacuum  |
| breaker was capable of performing its safety function in the open and close  |
| directions during this event. The suppression function of the Primary        |
| containment was not degraded as originally thought. Therefore, this event is |
| not reportable under the requirements of 10CFR50.72 and event 37719 is       |
| retracted."                                                                  |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R4DO (Linda Smith)    |
| was notified.                                                                |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37757       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: GRAND GULF               REGION:  4  |NOTIFICATION DATE: 02/16/2001|
|    UNIT:  [1] [] []                 STATE:  MS |NOTIFICATION TIME: 19:41[EST]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        02/16/2001|
+------------------------------------------------+EVENT TIME:        16:30[CST]|
| NRC NOTIFIED BY:  MARTY McADORY                |LAST UPDATE DATE:  02/20/2001|
|  HQ OPS OFFICER:  BOB STRANSKY                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GREG PICK            R4      |
|10 CFR SECTION:                                 |                             |
|*IND 50.72(b)(3)(v)(D)   ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HIGH PRESSURE CORE SPRAY SYSTEM DECLARED INOPERABLE                          |
|                                                                              |
| "During performance of 1C3 battery all-cell checks, battery cell #38 was     |
| found to be >0.020 below the average for specific gravity. Tech Spec 3.8.6,  |
| 'Battery Cell Parameters,' requires declaring 1C3 battery inoperable. This   |
| caused entry into Tech Spec 3.8.4 Action D, which is to declare the High     |
| Pressure Core Spray system inoperable. This requires entry into a 14 day     |
| LCO. This event is reportable since High Pressure Core Spray is a single     |
| train system."                                                               |
|                                                                              |
| The NRC resident inspector has been informed of this event by the licensee.  |
|                                                                              |
| * * * RETRACTED AT 1549 EST ON 2/20/01 BY CHRIS MILLER TO FANGIE JONES * *   |
| *                                                                            |
|                                                                              |
| The licensee is retracting this event notification.  After further review it |
| has been determined that the entry conditions for the LCO were not met and   |
| the division 3 batteries were never inoperable.                              |
|                                                                              |
| The licensee notified the NRC Resident Inspector.  The R4DO (Linda Smith)    |
| has been notified.                                                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   37766       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: COOPER                   REGION:  4  |NOTIFICATION DATE: 02/20/2001|
|    UNIT:  [1] [] []                 STATE:  NE |NOTIFICATION TIME: 01:56[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        02/19/2001|
+------------------------------------------------+EVENT TIME:        21:08[CST]|
| NRC NOTIFIED BY:  JOHN MYERS                   |LAST UPDATE DATE:  02/20/2001|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GREG PICK            R4      |
|10 CFR SECTION:                                 |                             |
|*SHU 50.72(b)(2)(i)      PLANT S/D REQD BY TS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |54       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| TECH SPEC REQUIRED SHUTDOWN COMMENCED AFTER DECLARING BOTH STANDBY GAS       |
| TREATMENT (SGT) TRAINS INOPERABLE                                            |
|                                                                              |
| "While performing Surveillance 6.SUMP.101, Z SUMP AND AIR EJECTOR HOLDUP     |
| LINE DRAIN OPERABILITY TEST (IST), Z-1 sump pump exceeded its operability    |
| time limit of 151 seconds by 3 seconds. When Z-2 sump pump was subsequently  |
| tested, the pump failed to start on the essential HI-HI level switch.  Both  |
| sump pumps were declared INOPERABLE. These pumps support Standby Gas         |
| Treatment OPERABILITY. The SGT line from the plant runs underground to the   |
| Elevated Release Point tower, and the offgas line and SGT both enter this    |
| sump. The pumps remove condensation from both the offgas lines and SGT, and  |
| must be available post-accident to prevent flooding of the SGT lines.        |
|                                                                              |
| "Per administrative direction in the Surveillance procedure, both trains of  |
| SGT were declared INOPERABLE at 2108.  Per Technical Specification 3.6.4.3,  |
| Condition D, with two SGT subsystems INOPERABLE in Mode 1, the Required      |
| Action is to enter LCO 3.0.3 immediately.  LCO 3.0.3 requires the plant to   |
| be in Mode 2 within 7 hours, Mode 3 within 13 hours, and Mode 4 within 37    |
| hours.  A power reduction was commenced at 2250. Present power level is      |
| 54%.                                                                         |
|                                                                              |
| "Engineering personnel have responded to the plant and are evaluating the    |
| two conditions."                                                             |
|                                                                              |
| The above surveillance is performed quarterly.  The licensee noted a past    |
| history of problems with the system's level switches.  The current rate of   |
| power reduction is approximately 100 MW/hr or 12-15% reactor power. The      |
| licensee informed the NRC resident inspector.                                |
|                                                                              |
| * * * UPDATE 0441 2/20/01 FROM TERRY BORGAN TO S. SANDIN * * *               |
|                                                                              |
| Tech Spec required shutdown exited at 0334CST after engineering determined   |
| that one train of SGT was OPERABLE.  The Unit remains in a 7-day LCO for the |
| other INOPERABLE train.  Notified R4DO(Pick).                                |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   37767       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 02/20/2001|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 22:30[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        02/20/2001|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        08:46[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  02/20/2001|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |MARK RING            R3      |
|  DOCKET:  0707002                              |JOSEPH HOLONICH      NMSS    |
+------------------------------------------------+FRANK CONGEL         IRO     |
| NRC NOTIFIED BY:  ERIC SPAETH                  |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| NRC BULLETIN 91-01 24 HOUR REPORT                                            |
|                                                                              |
| The following is a portion of a faxed report:                                |
|                                                                              |
| On 02/20/01 at 0848 hours the Plant Shift Superintendent's office was        |
| informed that a Nuclear Criticality Safety Analysis (NCSA) was deficient.    |
| NCSA-PLANT088, Storage of Abandoned Equipment, utilizes the NCS calculation  |
| document NCS-CALC-98-029, which contains the following non-conservative      |
| assumptions:                                                                 |
|                                                                              |
| The KENO model used a radius of 6.35 cm to model the inner diameter of a     |
| 5-inch pipe. This does not bound all nominal 5-inch diameter pipe. Standard  |
| 5-inch pipe can have an inner diameter of 5.345 inches (13.5763 cm) which    |
| would require a radius of 6.7882 cm.                                         |
|                                                                              |
| This document modeled a UO2F2 - H2O mixture with an H/U ratio of 4. The use  |
| of this H/U ratio is acceptable for cascade piping due to the way the        |
| cascade is operated. It is not acceptable for use in other buildings (i.e.   |
| X-705, X-700, and X710) if the pipe is filled with fissile material. An H/U  |
| ratio of at least 16 should have been used to bound pipes in the other       |
| buildings.                                                                   |
|                                                                              |
| NCS-CALC-98-029 provides part of the basis for defining what a safe geometry |
| is in NCSA-PLANT088.A00 (Storage of Abandoned Equipment). The calculation    |
| models a spacing violation between two 5.0-inch diameter 10-ft long pipes    |
| containing 100% enriched UO2F2 at an H/U of 4. Each pipe modeled in the      |
| calculation contains approximately 125,000 grams of U-235 at 100%            |
| enrichment. The USEC possession limit for HEU outside of shutdown cascade    |
| equipment is 1000 grams U-235.                                               |
|                                                                              |
| Control 1a in NCSA-PLANT088.A00 defines a safe geometry based on having a    |
| nominal pipe diameter of 5-inches or less, as well as limiting the length of |
| the pipe to less than 10-feet and specifying that the pipe has not been      |
| exposed to oily material. Since 'nominal'  5-inch diameter pipes may have    |
| diameters slightly larger than 5.0-inches, control 1a is not consistent with |
| the assumption in calculation NCS-CALC-98-029 of exactly 5.0-inch diameter.  |
| Therefore, NCSA-PLANT088.A00 is technically deficient, NCSA-PLANT088.A00 is  |
| currently active in various buildings on plant site. None of the equipment   |
| currently regulated by NCSA-PLANT088.A00 used the definition of safe         |
| geometry (as defined in control 1A in NCSA-PLANT088.A00) to show double      |
| contingency. Rather, all equipment currently under NCSA-PLANT088 is          |
| controlled based on being below a safe mass, which the NCSA allows as an     |
| alternative to controlling the geometry. Therefore, double contingency can   |
| still be shown for all equipment currently regulated by NCSA-PLANT088.A00    |
| (based on spacing and mass controls).                                        |
|                                                                              |
| As part of the response to this incident, other NCSAs were investigated      |
| which referenced either NCS-CALC-098-029 or NCSA-PLANT008 as part of their   |
| safety basis, It was determined that NCSA-PLANT062.A04 (Cascade Maintenance  |
| Equipment Removal and Storage) has the same problem as NCSA-PLANT088.A00. In |
| addition, NCSA-0705_ 041.A01 (Material Handling and Storage in X-705) and    |
| NCSA-PLANT048.A04 (Contaminated Metal) also reference either calculation     |
| NCS-CALC-98-029, NCSA-PLANT088.A00, or PLANT062.A04 as part of their safety  |
| basis for storage of favorable geometry equipment. While there may be items  |
| stored under these NCSAs based on the controls defining favorable geometry,  |
| none of these items individually can contain greater than a safe mass        |
| because of the requirements of TSRs 2.2.3.16 and 2.7.3.15. These TSRs        |
| require any removed cascade equipment containing greater than a safe mass    |
| under optimum moderation conditions to be decontaminated within 72 hours.    |
| Since there can be no equipment stored under any of the affected NCSAs       |
| containing greater than a safe mass, this incident is being reported to the  |
| NRC as a 24-hour event report.                                               |
|                                                                              |
| SAFETY SIGNIFICANCE OF EVENTS:                                               |
|                                                                              |
| The non-conservative assumption in NCS-CALC-98-029 has a low safety          |
| significance for the following reasons:                                      |
|                                                                              |
| The calculation assumed two 5-inch 10 foot long pipes completely filled with |
| a UO2F2-H2O mixture (H/U ratio of 4) containing approximately 125,000 grams  |
| of 100% enriched U-235. This case bounds the entire operating history of the |
| plant. Current plant requirements limit the production of enriched uranium   |
| to 10 wt% U-235. Any material greater than 10% is currently contained within |
| shutdown cascade piping (which is covered by other NCSAs not affected by     |
| this incident), or is limited to 1000 grams U-235 by the USEC possession     |
| limits.                                                                      |
|                                                                              |
| There is no equipment currently controlled by NCSA-PLANT088.A00 that uses a  |
| safe geometry as one control for double contingency.                         |
|                                                                              |
| While there may be equipment covered under NCSAs PLANT062, PLANT048, or      |
| 0705_041 that use safe geometry as a control, TSRs 2.2.3.16 and 2.7.3.15     |
| (Removed Equipment with Deposits) ensure that any such equipment containing  |
| greater than a safe mass is decontaminated to less than or equal to a safe   |
| mass within 72 hours of removal. The safe mass required by these TSRs is     |
| based on optimum moderation conditions. As a result of these TSRs and their  |
| implementing procedures, there is no removed equipment currently stored on   |
| plant site under any of the affected NCSAs which contains greater than a     |
| safe mass. Since the safe mass is defined as less than half of the minimum   |
| credible critical mass, a criticality would not have occurred even if a      |
| spacing violation had occurred.                                              |
|                                                                              |
| The calculation in question was intended to demonstrate subcriticality in    |
| the event of a spacing violation between two favorable geometry pipes. Since |
| there are no known spacing violations between such equipment, there remains  |
| at least one control in place to prevent criticality (spacing) in all cases. |
| The normal storage of favorable geometry equipment in a properly spaced      |
| configuration was not affected by this discovery.                            |
|                                                                              |
| POTENTIAL CRITICALITY PATHWAYS INVOLVED (BRIEF SCENARIO[S] OF HOW            |
| CRITICALITY COULD OCCUR):                                                    |
|                                                                              |
| Two 10 foot long 5 inch pipes containing a mixture of UO2F2-H2O mixture (H/U |
| ratio of 16) containing  I00 wt% U-235 placed adjacent to each other could   |
| achieve criticality.                                                         |
|                                                                              |
| CONTROLLED PARAMETERS (MASS, MODERATION, GEOMETRY, CONCENTRATION, ETC.):     |
|                                                                              |
| The controlled parameters for equipment which could be affected by this      |
| event are spacing and geometry.                                              |
|                                                                              |
| ESTIMATED AMOUNT, ENRICHMENT, FORM OF LICENSED MATERIAL (INCLUDE PROCESS     |
| LIMIT AND % WORST CASE OF CRITICAL MASS):                                    |
|                                                                              |
| No specific equipment was identified as being out of compliance. Therefore,  |
| the amount, enrichment or form is not known. However, it is known that no    |
| individual piece of equipment stored under the affected NCSAs contains       |
| greater than a safe mass, due to the TSR requirements.                       |
|                                                                              |
| NUCLEAR CRITICALITY SAFETY CONTROL(S) OR CONTROL SYSTEM(S) AND DESCRIPTION   |
| OF THE FAILURES OR DEFICIENCIES:                                             |
|                                                                              |
| The calculation document for a spacing violation between two favorable       |
| geometry components contained a non-conservative assumption which was not    |
| properly flown into the NCSA controls. The spacing control remained in       |
| place. Thus, one control used for double contingency was rendered invalid.   |
| The deficiency will be corrected by revising the NCSA controls to be         |
| consistent with the calculation.                                             |
|                                                                              |
| CORRECTIVE ACTIONS TO RESTORE SAFETY SYSTEM AND WHEN EACH WAS IMPLEMENTED:   |
|                                                                              |
| Daily Operating Instructions (DOI) stating "No further equipment shall be    |
| implemented under NCSA-PLANT088 until the deficiency Is corrected."          |
|                                                                              |
| The licensee has notified the NRC Resident Inspection and DOE.               |
+------------------------------------------------------------------------------+
