The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for October 22, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           10/21/1999 - 10/22/1999

                              ** EVENT NUMBERS **

35183  35790  36079  36255  36325  36326  36327  36328  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35183       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 12/21/1998|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 19:16[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        12/21/1998|
+------------------------------------------------+EVENT TIME:        16:20[EST]|
| NRC NOTIFIED BY:  PETE ABBOTT                  |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JOHN WHITE           R1      |
|10 CFR SECTION:                                 |                             |
|AINB 50.72(b)(2)(iii)(B) POT RHR INOP           |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       25       Power Operation  |25       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| -HIGH PRESSURE COOLANT INJECTION SYSTEM INOPERABLE DUE TO SYSTEM FLOW        |
| OSCILLATIONS-                                                                |
|                                                                              |
| WHILE TESTING THE HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM AT 25%       |
| POWER, THE LICENSEE OBSERVED SYSTEM FLOW OSCILLATIONS.  THE LICENSEE REMOVED |
| THE HPCI TURBINE FROM SERVICE TO DETERMINE THE CAUSE AND TAKE CORRECTIVE     |
| ACTIONS AND DECLARED THE HPCI SYSTEM INOPERABLE.  TECH SPEC LCO A/S          |
| 3.5.C.1.a REQUIRES THE LICENSEE TO RESTORE THE HPCI SYSTEM TO OPERABLE       |
| STATUS WITHIN 7 DAYS.                                                        |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
|                                                                              |
| * * * UPDATE AT 1332 ON 10/21/99 BY BOB STEIGERWELD TO JOLLIFFE * * *        |
|                                                                              |
| This notification retracts an earlier report made at 1916 on 12/21/98 per    |
| 10CFR50.72(b)(2)(iii)(B) and (D), due to observed flow oscillations during   |
| HPCI System testing.  On 12/23/98, the licensee determined that the flow     |
| oscillation did not affect the operability of the HPCI System and this event |
| notification should have been retracted at that time.                        |
|                                                                              |
| During HPCI System testing following a refueling outage, the HPCI System was |
| declared inoperable due to observed flow spiking indication on start up of   |
| the system.  Upon further investigation, the observed oscillations were      |
| attributed to spiking on system startup due to either air in the flow        |
| transmitter or electronic noise providing a false momentary indication.  In  |
| either case, it was demonstrated that the HPCI System was not affected by    |
| the momentary spiking indication and the system was able to perform its      |
| function and was determined to be operable.  Therefore, this event           |
| notification is being retracted.                                             |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
|                                                                              |
| The NRC Operations Officer notified the R1DO Bill Cook.                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35790       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 06/03/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 14:44[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        06/02/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        16:30[CDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/21/1999|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |DAVID HILLS          R3      |
|  DOCKET:  0707001                              |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  THOMAS WHITE                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBA 76.120(c)(2)(i)     ACCID MT EQUIP FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THREE SPRINKLER SYSTEMS DECLARED INOPERABLE DUE TO CORRODED HEADS (24-hour   |
| report)                                                                      |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "On 06/02/99 at 1630 CDT, the Plant Shift Superintendent (PSS) was notified  |
| that numerous sprinkler heads were corroded, affecting 16 sprinkler systems  |
| in C-337 and one system in C-333, such that the ability of the sprinklers to |
| flow sufficient water was called into question.  Subsequently, these         |
| sprinkler systems were declared inoperable, and TSR-required actions         |
| establishing roving fire patrols were initiated.  This deficiency was        |
| detected during scheduled system inspections conducted by Fire Protection    |
| personnel.  Currently, functionality of the sprinkler heads has not been     |
| fully evaluated by Fire Protection personnel, and the remaining cascade      |
| buildings are currently being inspected, and if necessary, this report will  |
| be updated to identify any additional areas.                                 |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| The NRC resident inspector has been notified of this event.                  |
|                                                                              |
|                                                                              |
| * * * UPDATE AT 1022 EDT ON 06/04/99 FROM CAGE TO TROCINE * * *              |
|                                                                              |
| "Two sprinkler heads on system D-1 in C-337 and two sprinkler heads on       |
| system 27 in C-335 were identified to also be corroded.  These were          |
| identified to the PSS on 06/03/99 at 1600 CDT and 1601 CDT, respectively,    |
| and determined to require an update to this report by the PSS.               |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Hills) and NMSS EO (Combs).        |
|                                                                              |
| * * * UPDATE AT 2152 EDT ON 06/17/99 FROM WALKER TO POERTNER * * *           |
|                                                                              |
| "Three sprinkler heads on system C-15 and five sprinkler heads on system B-8 |
| in C-333 were identified to also be corroded.  The PSS was notified of this  |
| condition at 1300 CDT on 06/17/99 and determined that an update to this      |
| report was required."                                                        |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Madera).                           |
|                                                                              |
| * * * UPDATE 1440 EDT 6/18/1999 FROM UNDERWOOD TAKEN BY STRANSKY * * *       |
|                                                                              |
| "Two sprinkler heads on system C-15 and one sprinkler head on system B-8 in  |
| C-333 were identified to have corrosion.  The PSS was notified of this       |
| condition at 1350 CDT on 06/18/99.  The area of the fire patrol for system   |
| C-15 was expanded to include the two heads identified as corroded.  The one  |
| head on system B-8 was in the area already being patrolled.  The PSS         |
| determined that an update to this report was required."                      |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Madera).                                                                    |
|                                                                              |
| * * * UPDATE 1315 EDT 6/25/1999 FROM WALKER TAKEN BY STRANSKY * * *          |
|                                                                              |
| "Two sprinkler heads on system D-8 and three sprinkler heads on system D-7   |
| in C-337 were identified to have corrosion.  The PSS was notified of the     |
| condition on system D-8 at 0125 CDT on 06/25/99 and at 1019 CDT on 06/25/99  |
| for system D-7.  Both systems were immediately declared inoperable and LCO   |
| fire patrol actions were implemented.  It was determined that an update to   |
| this report was required."                                                   |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Jordan).                                                                    |
|                                                                              |
| * * * UPDATE 2119 EDT 7/30/1999 FROM CAGE TAKEN BY STRANSKY * * *            |
|                                                                              |
| "Five sprinkler heads and one sprinkler piping tee on C-337 system D-7 were  |
| identified to have corrosion. The PSS was notified of these corroded system  |
| parts and declared the system inoperable at 0931 CDT on 07/30/99.  LCO       |
| required fire patrols of the affected area were initiated.  The PSS          |
| determined that an update to this event report was required."                |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Wright).                                                                    |
|                                                                              |
| * * * UPDATE 1655 EDT 7/31/1999 FROM WHITE TAKEN BY STRANSKY * * *           |
|                                                                              |
| "Two sprinkler heads on C-337 System D-1 were identified to have corrosion.  |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1155 CDT on 7/31/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update. Notified R3DO   |
| (Wright).                                                                    |
|                                                                              |
| * * * UPDATE 1546 EDT 8/10/1999 FROM WHITE TAKEN BY STRANSKY * * *           |
|                                                                              |
| "Two sprinkler heads on C-337 system C-15 were identified to have corrosion. |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1130 CDT on 8/10/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update. Notified R3DO   |
| (Burgess).                                                                   |
|                                                                              |
| * * * UPDATE AT 1154 EDT 8/22/99 FROM WALKER TO POERTNER * * *               |
|                                                                              |
| Four adjacent sprinkler heads on C-333 System B-1 were identified to have    |
| corrosion.  The PSS was notified of the corroded system parts and declared   |
| the system inoperable at 0918 CDT on 8/22/99.  LCO required fire patrols     |
| were initiated.  The PSS determined that an update to this report was        |
| required.                                                                    |
|                                                                              |
| It has been determined that this event is reportable under 10CFR76.120(c)(2) |
| as an event in which equipment is disabled or fails to function as           |
| designed.                                                                    |
|                                                                              |
| The NRC resident inspector will be notified.                                 |
|                                                                              |
| The NRC operations officer notified the R3DO (Clayton).                      |
|                                                                              |
| * * * UPDATE 2015 EDT ON 8/28/99 FROM W.F. GAGE TO S. SANDIN * * *           |
|                                                                              |
| The following information was provided as an update to this report:          |
|                                                                              |
| "Two adjacent sprinkler heads on C-337 System D-11 were identified to have   |
| corrosion.  The PSS was notified of these corroded system parts and declared |
| the system inoperable at 1420 [CDT] on 8/28/99.   LCO required fire patrols  |
| of the affected area were initiated. The PSS determined that an update to    |
| this report was required."                                                   |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE 2037 EDT ON 8/29/99 FROM KEVIN BEASLEY TO S. SANDIN * * *       |
|                                                                              |
| The following information was provided as an update to this report:          |
|                                                                              |
| "Two adjacent sprinkler heads on C-337 System D-15 were identified to have   |
| corrosion and the PSS declared the system inoperable at 0925 [CDT] on        |
| 8/29/99.  Also two adjacent heads on C-337 System D-10 were identified to    |
| have corrosion and the PSS declared the system inoperable at 1450.   LCO     |
| required fire patrols for both of the affected areas were initiated in the   |
| time frame required by TSR.  The PSS determined that an update to this       |
| report was required."                                                        |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE AT 0930 EDT ON 9/1/99  BY ERIC WALKER TO FANGIE JONES * * *     |
|                                                                              |
| Add two adjacent sprinkler heads on C-337 D-14.  Paducah personnel informed  |
| the NRC Resident Inspector.  The NRC operations officer notified the R3DO    |
| (David Hills) and NMSS (Robert Pierson).                                     |
|                                                                              |
| * * * UPDATE AT 1133 EDT ON 9/8/99  BY TOM WHITE TO FANGIE JONES * * *       |
|                                                                              |
| Add two adjacent sprinkler heads on C-331 System 26, system declared         |
| inoperable at 2155 CDT on 9/7/99. An LCO required fire patrol for the        |
| affected area was initiated in the time frame required by the TSR.  Paducah  |
| personnel informed the NRC Resident Inspector.  The NRC operations officer   |
| notified the R3DO (Monte Phillips) and NMSS (Josie Piccone).                 |
|                                                                              |
| * * * UPDATE AT 0948 ON 9/30/99 BY ERIC WALKER TO DOUG WEAVER * * *          |
|                                                                              |
| Add two adjacent sprinkler heads on C-333  System B-15 were identified to    |
| have corrosion and the PSS declared the system inoperable at 0815 on         |
| 9/30/99.  An LCO required fire patrol for the affected area was initiated in |
| the time frame required by the TSR.  The PSS determined that an update to    |
| this report was required.                                                    |
| Paducah personnel informed the NRC resident inspector.   The NRC operations  |
| officer notified the R3DO (Vegel) and NMSS (Cool).                           |
|                                                                              |
|                                                                              |
| *** UPDATE ON 10/13/99 @ 1600 BY WALKER TO GOULD ***                         |
|                                                                              |
| Two adjacent sprinkler heads on C-333 System A-11 were Identified to have    |
| corrosion and the PSS declared the system inoperable at 1307 on 10-13-99. An |
| LCO required fire patrol for the affected area was initiated in the time     |
| frame required by the TSR, The PSS determined that an update to this report  |
| was required. Paducah personnel informed the NRC resident inspector.   The   |
| NRC operations officer notified the R3DO (Madera) and NMSS (Moore).          |
|                                                                              |
| * * * UPDATE 1520 10/19/1999 FROM UNDERWOOD TAKEN BY STRANSKY * * *          |
|                                                                              |
| Six sprinkler heads on C-337 System D-16 were identified to have corrosion   |
| and the PSS declared the system inoperable at 1052 CDT on 10/19/99. An LCO   |
| required fire patrol for the affected area was initiated in the time frame   |
| required by the TSR. The PSS determined that an update to this report was    |
| required. The NRC resident inspector has been informed of this update.       |
| Notified R3DO (Jorgensen).                                                   |
|                                                                              |
| * * * UPDATE 2140 10/19/1999 FROM WALKER TAKEN BY STRANSKY * * *             |
|                                                                              |
| Seven sprinkler heads on C-337 System A-7 were identified to have corrosion, |
| and another four had been painted over. In addition, three adjacent          |
| sprinkler heads pm C-337 System A-8 were identified to have corrosion. The   |
| PSS declared the systems inoperable at 1900 CDT on 10/19/99. LCO required    |
| fire patrols for the affected areas were initiated in the time frame         |
| required by the TSR. The PSS determined that an update to this report was    |
| required. The NRC resident inspector has been informed of this update.       |
| Notified R3DO (Wright).                                                      |
|                                                                              |
| * * * UPDATE AT 1713 ON 10/21/99 FROM CAGE TAKEN BY JOLLIFFE * * *           |
|                                                                              |
| Four sprinkler heads on C-337 System A-5, twelve sprinkler heads on C-337    |
| System A-8, three sprinkler heads on C-337 System A-9, and six sprinkler     |
| heads on C-337 System B-8 were identified to have corrosion.  On 10/21/99,   |
| the PSS declared System A-5 and A-9 inoperable at 1028 CDT, System A-8       |
| inoperable at 1227 CDT and System B-8 inoperable at 1406 CDT.   An LCO       |
| required fire patrol for the affected areas was initiated in the time frame  |
| required by the TSR..  The PSS determined that an update to this report was  |
| required.  The NRC Resident Inspector has been informed of this update.  The |
| NRC Operations Officer notified R3DO Bruce Jorgensen.                        |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36079       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 08/27/1999|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 06:48[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/27/1999|
+------------------------------------------------+EVENT TIME:        06:00[EDT]|
| NRC NOTIFIED BY:  DAVE WALSH                   |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EMERGENCY SERVICE WATER SYSTEM DEGRADATION (ONLY ONE OF FOUR PUMPS           |
| OPERABLE)                                                                    |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On 08/26/99, Susquehanna Unit 1 and Unit 2 were operating at 100% power     |
| with the 'B' loop of emergency service water [(ESW)] out of service for      |
| scheduled maintenance.  During testing on the ESW system, with all ESW pumps |
| in service, it was identified that the 'C' and 'D' ESW pumps' discharge      |
| check valves were closed.  The ESW flow surveillance was performed, and the  |
| 'C' and 'D' ESW pumps failed to achieve the required flow and were declared  |
| inoperable.  Concurrently, the 'B' loop of ESW was returned to service.      |
| During the time the 'B' ESW loop was inoperable, the 'A' ESW pump was the    |
| only one operable ESW pump.  This constitutes a serious degradation of the   |
| plant in that it is a condition which is outside of design basis and,        |
| therefore, reportable under 10 CFR 50.72(b)(1)(ii) requiring a 1-hour ENS    |
| notification."                                                               |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
|                                                                              |
| * * * UPDATE 1453EDT ON 9/3/99 FROM GRANT FERNSLER TO S. SANDIN * * *        |
|                                                                              |
| "This Notification is a retraction of a previous ENS Notification made       |
| 8/27/99 (Event # 36079)."                                                    |
|                                                                              |
| "Subsequent evaluation by Engineering has concluded that the plant had at    |
| least two Emergency Service                                                  |
| Water pumps capable of performing their specified safety function at all     |
| times.  As such, the plant was not                                           |
| in a condition outside of its design basis and the report previously made    |
| pursuant to 10CFR50.72(b)(1)(ii)                                             |
| is hereby retracted."                                                        |
|                                                                              |
| The licensee informed the NRC Resident Inspector.  Notified R1DO(Rogge).     |
|                                                                              |
| * * *UPDATE 0316EDT ON 09/23/99 FROM MIKE PEAL TAKEN BY MACKINNON* * *       |
|                                                                              |
| The licensee is Retracting the Retraction they called in on 09/03/99 at      |
| 1453EDT.                                                                     |
|                                                                              |
| "On 09/22/99 at 2230, an Engineering evaluation concluded that the           |
| operability determination associated with the above stated event was not     |
| adequate, specifically relating to the potential for pump interaction to     |
| create low flow conditions. "                                                |
|                                                                              |
| "The Engineering evaluation was being performed in response to an anomaly    |
| identified on 09/20/99 during the run of 'D' Diesel Generator.  During the   |
| preparation of the operability statement for the 09/20/99 anomaly,           |
| engineering personnel realized that incorrect assumptions were used in the   |
| previous operability statement.  The 'C' and 'D' ESW pumps were declared     |
| inoperable at 2230 on 09/22/99.  Evaluation continues to determine if other  |
| combinations of equipment out of service times result in additional          |
| reportable conditions."  R1DO (Bob Summers) notified.                        |
|                                                                              |
| The NRC Resident Inspector will be notified of the Retraction to the         |
| Retraction of this event by the licensee.                                    |
|                                                                              |
| * * * UPDATE AT 1325 ON 10/21/99 BY MIKE PEAL TO JOLLIFFE * * *              |
|                                                                              |
| Based on additional evaluations by Licensee Engineering, Operations and      |
| Licensing spanning the time frame of 06/03/99 to 09/28/99, the licensee      |
| concluded that the plant had at least one Emergency Service Water Pump per   |
| loop capable of performing its specified safety function at all times.  As   |
| such, the plant was not in a condition outside of its design basis, was not  |
| in an unanalyzed condition, and there was no loss of safety function.  The   |
| report previously made pursuant to 10CFR50.72(b)(1)(ii) on 09/23/99 is       |
| hereby retracted.                                                            |
|                                                                              |
| The licensee plans to notify the NRC Resident Inspector.                     |
|                                                                              |
| The NRC Operations Officer notified the R1DO Bill Cook.                      |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36255       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 10/02/1999|
|    UNIT:  [] [2] []                 STATE:  TX |NOTIFICATION TIME: 21:03[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        10/02/1999|
+------------------------------------------------+EVENT TIME:        19:05[CDT]|
| NRC NOTIFIED BY:  FRAWLEY                      |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JEFF SHACKELFORD     R4      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       94       Power Operation  |94       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNACCOUNTED FOR  ACCESS KEY.  COMPENSATORY MEASURES WERE PUT INTO PLACE.     |
|                                                                              |
| SEE HOO LOG FOR DETAILS.                                                     |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
|                                                                              |
| * * * UPDATE AT 1658 ON 10/21/99 BY KATHLEEN WORK TO JOLLIFFE * * *          |
|                                                                              |
| THE LICENSEE DESIRES TO RETRACT THIS EVENT AS A REPORTABLE EVENT AND WILL    |
| LOG THIS EVENT IN THEIR SAFEGUARDS EVENT LOG SINCE SECURITY IMPLEMENTING     |
| COMPENSATORY ACTIONS WERE IMPLEMENTED WITHIN 15 MINUTES FROM THE TIME THE    |
| LICENSEE DISCOVERED THAT THE KEY WAS MISSING.                                |
|                                                                              |
| SEE THE HOO LOG FOR DETAILS.                                                 |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
|                                                                              |
| THE NRC OPERATIONS OFFICER NOTIFIED THE R4DO LINDA SMITH.                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36325       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 10/21/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 08:37[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        10/20/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        10:30[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/21/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |BRUCE JORGENSEN      R3      |
|  DOCKET:  0707002                              |BRIAN SMITH     EO   NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  LARSON                       |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24 HOUR 91-01 BULLETIN RESPONSE                                              |
|                                                                              |
| ON 10/20/99 AT 1030 HOURS, A NUCLEAR CRITICALITY SAFETY ANALYSIS (NCSA)      |
| NONCOMPLIANCE WAS IDENTIFIED IN THE X-330 PROCESS BUILDING. THIS             |
| NONCOMPLIANCE WAS DISCOVERED WHILE REVIEWING OBSERVATIONS FOUND DURING A     |
| WALKDOWN OF IMPLEMENTED NCSAs.                                               |
|                                                                              |
| AT COLUMN C-53 ON THE CELL FLOOR OF X-330, A DRIP PAN CONNECTED TO A PAIR OF |
| LUBE OIL STRAINERS DID NOT MEET THE REQUIREMENTS OF NCSA-PLANT054 FOR LUBE   |
| OIL SYSTEMS. NCSA-PLANT054 REQUIRES ALL LUBE OIL LEAK COLLECTION CONTAINERS  |
| IN AREAS WHERE SIGNIFICANT UF6 RELEASES ARE CONSIDERED CREDIBLE, MEET        |
| CERTAIN SIZE RESTRICTIONS. IN X-330, THE MAXIMUM ALLOWED DEPTH OF A LUBE OIL |
| DRIP PAN ON THE CELL FLOOR IS 3.6 INCHES. THE DRIP PAN FOUND WAS 5.76 INCHES |
| DEEP. THIS VIOLATES THE CONTAINER SIZE REQUIREMENT OF THE NCSA. THE DRIP PAN |
| CONTAINED APPROXIMATELY 25 QUARTS OF OIL AT TIME OF DISCOVERY. THERE WAS NO  |
| EVIDENCE OF ANY UF6 RELEASES IN THE AREA.                                    |
|                                                                              |
| THE CONTAINER SIZE LIMIT WAS EXCEEDED RESULTING IN THE LOSS OF GEOMETRY. THE |
| OTHER CONTROL OF THE DOUBLE CONTINGENCY PRINCIPLE (CONCENTRATION) WAS        |
| MAINTAINED THROUGHOUT THIS EVENT.                                            |
|                                                                              |
| DOUBLE CONTINGENCY WAS REESTABLISHED BY OPENING AND TAGGING (DO NOT CLOSE)   |
| THE DRAIN VALVE IN THE BOTTOM OF THE DRIP PAN. THIS PREVENTS THE             |
| ACCUMULATION OF LUBE OIL TO A DEPTH GREATER THAN 3.6 INCHES. A WORK PACKAGE  |
| WAS DEVELOPED TO REMOVE THE DRIP PAN AND REPLACE IT WITH ONE THAT IS IN      |
| COMPLIANCE WITH NCSA-PLANT054. AT 1400 HOURS                                 |
| ON 10/20/99, THE NONCOMPLIANT DRIP PAN WAS REMOVED AND REPLACED WITH A PAN   |
| HAVING A DEPTH OF UNDER THREE INCHES, REESTABLISHING NCSA-PLANT054           |
| COMPLIANCE.                                                                  |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| THE NRC RESIDENT INSPECTOR AND THE DOE REPRESENTATIVE WERE NOTIFIED.         |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36326       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 10/21/1999|
|    UNIT:  [1] [2] []                STATE:  CA |NOTIFICATION TIME: 15:04[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        10/21/1999|
+------------------------------------------------+EVENT TIME:        10:22[PDT]|
| NRC NOTIFIED BY:  DICK LUCKETT                 |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |LINDA SMITH          R4      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - OFFSITE AGENCIES NOTIFIED OF A SPILL OF 3 OUNCES OF HYDRAULIC FLUID INTO   |
| PACIFIC OCEAN -                                                              |
|                                                                              |
| THE LICENSEE NOTIFIED THE NATIONAL RESPONSE CENTER (EPA CASE #503190), THE   |
| CALIFORNIA OFFICE OF EMERGENCY SERVICES, AND THE NRC RESIDENT INSPECTOR OF A |
| SPILL OF APPROXIMATELY THREE OUNCES OF BIODEGRADABLE HYDRAULIC FLUID FROM A  |
| KELP HARVESTER INTO THE PACIFIC OCEAN.                                       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36327       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: ALLIED-SIGNAL INC.                   |NOTIFICATION DATE: 10/21/1999|
|   RXTYPE: URANIUM HEXAFLUORIDE PRODUCTION      |NOTIFICATION TIME: 17:31[EDT]|
| COMMENTS: UF6 CONVERSION (DRY PROCESS)         |EVENT DATE:        10/21/1999|
|                                                |EVENT TIME:        16:00[CDT]|
|                                                |LAST UPDATE DATE:  10/21/1999|
|    CITY:  METROPOLIS               REGION:  3  +-----------------------------+
|  COUNTY:  MASSAC                    STATE:  IL |PERSON          ORGANIZATION |
|LICENSE#:  SUB-526               AGREEMENT:  Y  |BRUCE JORGENSEN      R3      |
|  DOCKET:  04003392                             |CHARLEY HAUGHNEY     NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  HUGH ROBERTS                 |                             |
|  HQ OPS OFFICER:  DICK JOLLIFFE                |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|KBBF 70.50(b)(2)(ii)     EQUIP DISABLED/FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - PLANT FIRE WATER DELUGE SYSTEM LINE RUPTURED INSIDE THE PLANT -            |
|                                                                              |
| A SIX INCH RECTIFIER 'A' & 'B' PLANT FIRE WATER DELUGE SYSTEM LINE RUPTURED  |
| INSIDE THE PLANT.  THE LICENSEE ISOLATED THE RUPTURE AND PLANS TO POST A     |
| FIRE WATCH AND REPAIR/REPLACE THE RUPTURED SECTION OF LINE.                  |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36328       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 10/22/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 03:01[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        10/21/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        15:00[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/22/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |BRUCE JORGENSEN      R3      |
|  DOCKET:  0707002                              |CHARLEY HAUGHNEY     NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  SPAETH                       |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24 HOUR 91-01 BULLETIN RESPONSE                                              |
|                                                                              |
| On 10/21/ 1999 at 1500 hrs the Plant Shift Superintendent(PSS) was notified  |
| that a Nuclear Criticality Safety Approval (NCSA) requirement was not being  |
| performed in the X-710 ES&H Analytical Labs. NCS Engineering, while          |
| performing an NCS Self Assessment, noticed an operation where samples were   |
| brought to a staging area "INSIDE" a room when they were logged in and       |
| verified. (NCSA-0710_025.AOO)                                                |
|                                                                              |
| Requirement #1 of NCSA-071_25.AOO states in part; Samples in any room        |
| enriched to 1% or greater U-235, will be limited to one group of 30g U-235   |
| per room. This will be ensured by maintaining a room inventory log of U-235  |
| mass in labeled containers. Each log entry will consist of the U-235 mass    |
| value plus analytical uncertainty and will be:                               |
|                                                                              |
| a. made by a knowledgeable person "PRIOR" to bringing the samples into the   |
| room, and                                                                    |
| b. verified by a second knowledgeable person "PRIOR" to bringing the samples |
| into the room.                                                               |
|                                                                              |
| At the direction of the Plant Shift Superintendent the requirements for an   |
| NCS anomalous condition were initiated and the area baundaried off.          |
|                                                                              |
| The safety significance of the event is very low. The U-235 mass in material |
| is being maintained less than 30 grams as required. This is more than a      |
| factor of 10 less than the always safe mass of 350 grams U-235. The samples  |
| were brought to a staging area inside the room where they were logged in and |
| verified. After logging and verifying the samples were moved to the          |
| operational area of the room, where they could interact with other materials |
| in the room.                                                                 |
|                                                                              |
| Samples in any room enriched to 1% or greater U-235, with a concentration    |
| greater or equal to 500 ppm U-235, shall be limited to one group of 30 g     |
| U-235 per room. This shall be ensured by maintaining a room inventory log of |
| U-235 mass in labeled containers. Each log entry shall consist of the U-235  |
| mass value plus analytical uncertainty and shall be:                         |
|                                                                              |
| Mass is the only parameter controlled                                        |
|                                                                              |
| The actual amount of material In the room is less than 30 grams U-235, at an |
| enrichment of less than or equal to 100%. This value is obtained from sample |
| data that was logged after the material was brought Into the room. This is   |
| approximately 4% of the worst case critical mass.                            |
|                                                                              |
| Verbatim compliance with both mass controls was lost because the material    |
| was supposed to be checked and verified prior to bringing the material into  |
| the room. The samples were brought to a staging area inside the room where   |
| they were logged in and verified. After logging and verifying the samples    |
| were moved to the operational area of the room, where they could interact    |
| with other materials in the room.                                            |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| The Resident Inspector was notified and the DOE Representative will be       |
| notified.                                                                    |
+------------------------------------------------------------------------------+
