Event Notification Report for October 22, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           10/21/1999 - 10/22/1999

                              ** EVENT NUMBERS **

35183  35790  36079  36255  36325  36326  36327  36328  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35183       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 12/21/1998|
|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 19:16[EST]|
|   RXTYPE: [1] GE-4                             |EVENT DATE:        12/21/1998|
+------------------------------------------------+EVENT TIME:        16:20[EST]|
| NRC NOTIFIED BY:  PETE ABBOTT                  |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JOHN WHITE           R1      |
|10 CFR SECTION:                                 |                             |
|AINB 50.72(b)(2)(iii)(B) POT RHR INOP           |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       25       Power Operation  |25       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| -HIGH PRESSURE COOLANT INJECTION SYSTEM INOPERABLE DUE TO SYSTEM FLOW        |
| OSCILLATIONS-                                                                |
|                                                                              |
| WHILE TESTING THE HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM AT 25%       |
| POWER, THE LICENSEE OBSERVED SYSTEM FLOW OSCILLATIONS.  THE LICENSEE REMOVED |
| THE HPCI TURBINE FROM SERVICE TO DETERMINE THE CAUSE AND TAKE CORRECTIVE     |
| ACTIONS AND DECLARED THE HPCI SYSTEM INOPERABLE.  TECH SPEC LCO A/S          |
| 3.5.C.1.a REQUIRES THE LICENSEE TO RESTORE THE HPCI SYSTEM TO OPERABLE       |
| STATUS WITHIN 7 DAYS.                                                        |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
|                                                                              |
| * * * UPDATE AT 1332 ON 10/21/99 BY BOB STEIGERWELD TO JOLLIFFE * * *        |
|                                                                              |
| This notification retracts an earlier report made at 1916 on 12/21/98 per    |
| 10CFR50.72(b)(2)(iii)(B) and (D), due to observed flow oscillations during   |
| HPCI System testing.  On 12/23/98, the licensee determined that the flow     |
| oscillation did not affect the operability of the HPCI System and this event |
| notification should have been retracted at that time.                        |
|                                                                              |
| During HPCI System testing following a refueling outage, the HPCI System was |
| declared inoperable due to observed flow spiking indication on start up of   |
| the system.  Upon further investigation, the observed oscillations were      |
| attributed to spiking on system startup due to either air in the flow        |
| transmitter or electronic noise providing a false momentary indication.  In  |
| either case, it was demonstrated that the HPCI System was not affected by    |
| the momentary spiking indication and the system was able to perform its      |
| function and was determined to be operable.  Therefore, this event           |
| notification is being retracted.                                             |
|                                                                              |
| The licensee notified the NRC Resident Inspector.                            |
|                                                                              |
| The NRC Operations Officer notified the R1DO Bill Cook.                      |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35790       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 06/03/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 14:44[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        06/02/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        16:30[CDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/21/1999|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |DAVID HILLS          R3      |
|  DOCKET:  0707001                              |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  THOMAS WHITE                 |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|OCBA 76.120(c)(2)(i)     ACCID MT EQUIP FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THREE SPRINKLER SYSTEMS DECLARED INOPERABLE DUE TO CORRODED HEADS (24-hour   |
| report)                                                                      |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "On 06/02/99 at 1630 CDT, the Plant Shift Superintendent (PSS) was notified  |
| that numerous sprinkler heads were corroded, affecting 16 sprinkler systems  |
| in C-337 and one system in C-333, such that the ability of the sprinklers to |
| flow sufficient water was called into question.  Subsequently, these         |
| sprinkler systems were declared inoperable, and TSR-required actions         |
| establishing roving fire patrols were initiated.  This deficiency was        |
| detected during scheduled system inspections conducted by Fire Protection    |
| personnel.  Currently, functionality of the sprinkler heads has not been     |
| fully evaluated by Fire Protection personnel, and the remaining cascade      |
| buildings are currently being inspected, and if necessary, this report will  |
| be updated to identify any additional areas.                                 |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| The NRC resident inspector has been notified of this event.                  |
|                                                                              |
|                                                                              |
| * * * UPDATE AT 1022 EDT ON 06/04/99 FROM CAGE TO TROCINE * * *              |
|                                                                              |
| "Two sprinkler heads on system D-1 in C-337 and two sprinkler heads on       |
| system 27 in C-335 were identified to also be corroded.  These were          |
| identified to the PSS on 06/03/99 at 1600 CDT and 1601 CDT, respectively,    |
| and determined to require an update to this report by the PSS.               |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Hills) and NMSS EO (Combs).        |
|                                                                              |
| * * * UPDATE AT 2152 EDT ON 06/17/99 FROM WALKER TO POERTNER * * *           |
|                                                                              |
| "Three sprinkler heads on system C-15 and five sprinkler heads on system B-8 |
| in C-333 were identified to also be corroded.  The PSS was notified of this  |
| condition at 1300 CDT on 06/17/99 and determined that an update to this      |
| report was required."                                                        |
|                                                                              |
| "It has been determined that this event is reportable under                  |
| 10CFR76.120(c)(2) as an event in which equipment is disabled or fails to     |
| function as designed."                                                       |
|                                                                              |
| Paducah personnel notified the NRC resident inspector of this update.  The   |
| NRC operations officer notified the R3DO (Madera).                           |
|                                                                              |
| * * * UPDATE 1440 EDT 6/18/1999 FROM UNDERWOOD TAKEN BY STRANSKY * * *       |
|                                                                              |
| "Two sprinkler heads on system C-15 and one sprinkler head on system B-8 in  |
| C-333 were identified to have corrosion.  The PSS was notified of this       |
| condition at 1350 CDT on 06/18/99.  The area of the fire patrol for system   |
| C-15 was expanded to include the two heads identified as corroded.  The one  |
| head on system B-8 was in the area already being patrolled.  The PSS         |
| determined that an update to this report was required."                      |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Madera).                                                                    |
|                                                                              |
| * * * UPDATE 1315 EDT 6/25/1999 FROM WALKER TAKEN BY STRANSKY * * *          |
|                                                                              |
| "Two sprinkler heads on system D-8 and three sprinkler heads on system D-7   |
| in C-337 were identified to have corrosion.  The PSS was notified of the     |
| condition on system D-8 at 0125 CDT on 06/25/99 and at 1019 CDT on 06/25/99  |
| for system D-7.  Both systems were immediately declared inoperable and LCO   |
| fire patrol actions were implemented.  It was determined that an update to   |
| this report was required."                                                   |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Jordan).                                                                    |
|                                                                              |
| * * * UPDATE 2119 EDT 7/30/1999 FROM CAGE TAKEN BY STRANSKY * * *            |
|                                                                              |
| "Five sprinkler heads and one sprinkler piping tee on C-337 system D-7 were  |
| identified to have corrosion. The PSS was notified of these corroded system  |
| parts and declared the system inoperable at 0931 CDT on 07/30/99.  LCO       |
| required fire patrols of the affected area were initiated.  The PSS          |
| determined that an update to this event report was required."                |
|                                                                              |
| The NRC resident inspector has been informed of this update.  Notified R3DO  |
| (Wright).                                                                    |
|                                                                              |
| * * * UPDATE 1655 EDT 7/31/1999 FROM WHITE TAKEN BY STRANSKY * * *           |
|                                                                              |
| "Two sprinkler heads on C-337 System D-1 were identified to have corrosion.  |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1155 CDT on 7/31/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update. Notified R3DO   |
| (Wright).                                                                    |
|                                                                              |
| * * * UPDATE 1546 EDT 8/10/1999 FROM WHITE TAKEN BY STRANSKY * * *           |
|                                                                              |
| "Two sprinkler heads on C-337 system C-15 were identified to have corrosion. |
| The PSS was notified of these corroded system parts and declared the system  |
| inoperable at 1130 CDT on 8/10/99.  LCO required fire patrols of the         |
| affected area were initiated.  The PSS determined that an update to this     |
| report was required."                                                        |
|                                                                              |
| The NRC resident inspector has been informed of this update. Notified R3DO   |
| (Burgess).                                                                   |
|                                                                              |
| * * * UPDATE AT 1154 EDT 8/22/99 FROM WALKER TO POERTNER * * *               |
|                                                                              |
| Four adjacent sprinkler heads on C-333 System B-1 were identified to have    |
| corrosion.  The PSS was notified of the corroded system parts and declared   |
| the system inoperable at 0918 CDT on 8/22/99.  LCO required fire patrols     |
| were initiated.  The PSS determined that an update to this report was        |
| required.                                                                    |
|                                                                              |
| It has been determined that this event is reportable under 10CFR76.120(c)(2) |
| as an event in which equipment is disabled or fails to function as           |
| designed.                                                                    |
|                                                                              |
| The NRC resident inspector will be notified.                                 |
|                                                                              |
| The NRC operations officer notified the R3DO (Clayton).                      |
|                                                                              |
| * * * UPDATE 2015 EDT ON 8/28/99 FROM W.F. GAGE TO S. SANDIN * * *           |
|                                                                              |
| The following information was provided as an update to this report:          |
|                                                                              |
| "Two adjacent sprinkler heads on C-337 System D-11 were identified to have   |
| corrosion.  The PSS was notified of these corroded system parts and declared |
| the system inoperable at 1420 [CDT] on 8/28/99.   LCO required fire patrols  |
| of the affected area were initiated. The PSS determined that an update to    |
| this report was required."                                                   |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE 2037 EDT ON 8/29/99 FROM KEVIN BEASLEY TO S. SANDIN * * *       |
|                                                                              |
| The following information was provided as an update to this report:          |
|                                                                              |
| "Two adjacent sprinkler heads on C-337 System D-15 were identified to have   |
| corrosion and the PSS declared the system inoperable at 0925 [CDT] on        |
| 8/29/99.  Also two adjacent heads on C-337 System D-10 were identified to    |
| have corrosion and the PSS declared the system inoperable at 1450.   LCO     |
| required fire patrols for both of the affected areas were initiated in the   |
| time frame required by TSR.  The PSS determined that an update to this       |
| report was required."                                                        |
|                                                                              |
| Paducah personnel informed the NRC resident inspector.  The NRC operations   |
| officer notified the R3DO (Leach) and NMSS EO (Piccone).                     |
|                                                                              |
| * * * UPDATE AT 0930 EDT ON 9/1/99  BY ERIC WALKER TO FANGIE JONES * * *     |
|                                                                              |
| Add two adjacent sprinkler heads on C-337 D-14.  Paducah personnel informed  |
| the NRC Resident Inspector.  The NRC operations officer notified the R3DO    |
| (David Hills) and NMSS (Robert Pierson).                                     |
|                                                                              |
| * * * UPDATE AT 1133 EDT ON 9/8/99  BY TOM WHITE TO FANGIE JONES * * *       |
|                                                                              |
| Add two adjacent sprinkler heads on C-331 System 26, system declared         |
| inoperable at 2155 CDT on 9/7/99. An LCO required fire patrol for the        |
| affected area was initiated in the time frame required by the TSR.  Paducah  |
| personnel informed the NRC Resident Inspector.  The NRC operations officer   |
| notified the R3DO (Monte Phillips) and NMSS (Josie Piccone).                 |
|                                                                              |
| * * * UPDATE AT 0948 ON 9/30/99 BY ERIC WALKER TO DOUG WEAVER * * *          |
|                                                                              |
| Add two adjacent sprinkler heads on C-333  System B-15 were identified to    |
| have corrosion and the PSS declared the system inoperable at 0815 on         |
| 9/30/99.  An LCO required fire patrol for the affected area was initiated in |
| the time frame required by the TSR.  The PSS determined that an update to    |
| this report was required.                                                    |
| Paducah personnel informed the NRC resident inspector.   The NRC operations  |
| officer notified the R3DO (Vegel) and NMSS (Cool).                           |
|                                                                              |
|                                                                              |
| *** UPDATE ON 10/13/99 @ 1600 BY WALKER TO GOULD ***                         |
|                                                                              |
| Two adjacent sprinkler heads on C-333 System A-11 were Identified to have    |
| corrosion and the PSS declared the system inoperable at 1307 on 10-13-99. An |
| LCO required fire patrol for the affected area was initiated in the time     |
| frame required by the TSR, The PSS determined that an update to this report  |
| was required. Paducah personnel informed the NRC resident inspector.   The   |
| NRC operations officer notified the R3DO (Madera) and NMSS (Moore).          |
|                                                                              |
| * * * UPDATE 1520 10/19/1999 FROM UNDERWOOD TAKEN BY STRANSKY * * *          |
|                                                                              |
| Six sprinkler heads on C-337 System D-16 were identified to have corrosion   |
| and the PSS declared the system inoperable at 1052 CDT on 10/19/99. An LCO   |
| required fire patrol for the affected area was initiated in the time frame   |
| required by the TSR. The PSS determined that an update to this report was    |
| required. The NRC resident inspector has been informed of this update.       |
| Notified R3DO (Jorgensen).                                                   |
|                                                                              |
| * * * UPDATE 2140 10/19/1999 FROM WALKER TAKEN BY STRANSKY * * *             |
|                                                                              |
| Seven sprinkler heads on C-337 System A-7 were identified to have corrosion, |
| and another four had been painted over. In addition, three adjacent          |
| sprinkler heads pm C-337 System A-8 were identified to have corrosion. The   |
| PSS declared the systems inoperable at 1900 CDT on 10/19/99. LCO required    |
| fire patrols for the affected areas were initiated in the time frame         |
| required by the TSR. The PSS determined that an update to this report was    |
| required. The NRC resident inspector has been informed of this update.       |
| Notified R3DO (Wright).                                                      |
|                                                                              |
| * * * UPDATE AT 1713 ON 10/21/99 FROM CAGE TAKEN BY JOLLIFFE * * *           |
|                                                                              |
| Four sprinkler heads on C-337 System A-5, twelve sprinkler heads on C-337    |
| System A-8, three sprinkler heads on C-337 System A-9, and six sprinkler     |
| heads on C-337 System B-8 were identified to have corrosion.  On 10/21/99,   |
| the PSS declared System A-5 and A-9 inoperable at 1028 CDT, System A-8       |
| inoperable at 1227 CDT and System B-8 inoperable at 1406 CDT.   An LCO       |
| required fire patrol for the affected areas was initiated in the time frame  |
| required by the TSR..  The PSS determined that an update to this report was  |
| required.  The NRC Resident Inspector has been informed of this update.  The |
| NRC Operations Officer notified R3DO Bruce Jorgensen.                        |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36079       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUSQUEHANNA              REGION:  1  |NOTIFICATION DATE: 08/27/1999|
|    UNIT:  [1] [2] []                STATE:  PA |NOTIFICATION TIME: 06:48[EDT]|
|   RXTYPE: [1] GE-4,[2] GE-4                    |EVENT DATE:        08/27/1999|
+------------------------------------------------+EVENT TIME:        06:00[EDT]|
| NRC NOTIFIED BY:  DAVE WALSH                   |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  LEIGH TROCINE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |KATHLEEN MODES       R1      |
|10 CFR SECTION:                                 |                             |
|AOUT 50.72(b)(1)(ii)(B)  OUTSIDE DESIGN BASIS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| EMERGENCY SERVICE WATER SYSTEM DEGRADATION (ONLY ONE OF FOUR PUMPS           |
| OPERABLE)                                                                    |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On 08/26/99, Susquehanna Unit 1 and Unit 2 were operating at 100% power     |
| with the 'B' loop of emergency service water [(ESW)] out of service for      |
| scheduled maintenance.  During testing on the ESW system, with all ESW pumps |
| in service, it was identified that the 'C' and 'D' ESW pumps' discharge      |
| check valves were closed.  The ESW flow surveillance was performed, and the  |
| 'C' and 'D' ESW pumps failed to achieve the required flow and were declared  |
| inoperable.  Concurrently, the 'B' loop of ESW was returned to service.      |
| During the time the 'B' ESW loop was inoperable, the 'A' ESW pump was the    |
| only one operable ESW pump.  This constitutes a serious degradation of the   |
| plant in that it is a condition which is outside of design basis and,        |
| therefore, reportable under 10 CFR 50.72(b)(1)(ii) requiring a 1-hour ENS    |
| notification."                                                               |
|                                                                              |
| The licensee notified the NRC resident inspector.                            |
|                                                                              |
| * * * UPDATE 1453EDT ON 9/3/99 FROM GRANT FERNSLER TO S. SANDIN * * *        |
|                                                                              |
| "This Notification is a retraction of a previous ENS Notification made       |
| 8/27/99 (Event # 36079)."                                                    |
|                                                                              |
| "Subsequent evaluation by Engineering has concluded that the plant had at    |
| least two Emergency Service                                                  |
| Water pumps capable of performing their specified safety function at all     |
| times.  As such, the plant was not                                           |
| in a condition outside of its design basis and the report previously made    |
| pursuant to 10CFR50.72(b)(1)(ii)                                             |
| is hereby retracted."                                                        |
|                                                                              |
| The licensee informed the NRC Resident Inspector.  Notified R1DO(Rogge).     |
|                                                                              |
| * * *UPDATE 0316EDT ON 09/23/99 FROM MIKE PEAL TAKEN BY MACKINNON* * *       |
|                                                                              |
| The licensee is Retracting the Retraction they called in on 09/03/99 at      |
| 1453EDT.                                                                     |
|                                                                              |
| "On 09/22/99 at 2230, an Engineering evaluation concluded that the           |
| operability determination associated with the above stated event was not     |
| adequate, specifically relating to the potential for pump interaction to     |
| create low flow conditions. "                                                |
|                                                                              |
| "The Engineering evaluation was being performed in response to an anomaly    |
| identified on 09/20/99 during the run of 'D' Diesel Generator.  During the   |
| preparation of the operability statement for the 09/20/99 anomaly,           |
| engineering personnel realized that incorrect assumptions were used in the   |
| previous operability statement.  The 'C' and 'D' ESW pumps were declared     |
| inoperable at 2230 on 09/22/99.  Evaluation continues to determine if other  |
| combinations of equipment out of service times result in additional          |
| reportable conditions."  R1DO (Bob Summers) notified.                        |
|                                                                              |
| The NRC Resident Inspector will be notified of the Retraction to the         |
| Retraction of this event by the licensee.                                    |
|                                                                              |
| * * * UPDATE AT 1325 ON 10/21/99 BY MIKE PEAL TO JOLLIFFE * * *              |
|                                                                              |
| Based on additional evaluations by Licensee Engineering, Operations and      |
| Licensing spanning the time frame of 06/03/99 to 09/28/99, the licensee      |
| concluded that the plant had at least one Emergency Service Water Pump per   |
| loop capable of performing its specified safety function at all times.  As   |
| such, the plant was not in a condition outside of its design basis, was not  |
| in an unanalyzed condition, and there was no loss of safety function.  The   |
| report previously made pursuant to 10CFR50.72(b)(1)(ii) on 09/23/99 is       |
| hereby retracted.                                                            |
|                                                                              |
| The licensee plans to notify the NRC Resident Inspector.                     |
|                                                                              |
| The NRC Operations Officer notified the R1DO Bill Cook.                      |
+------------------------------------------------------------------------------+

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36255       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 10/02/1999|
|    UNIT:  [] [2] []                 STATE:  TX |NOTIFICATION TIME: 21:03[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        10/02/1999|
+------------------------------------------------+EVENT TIME:        19:05[CDT]|
| NRC NOTIFIED BY:  FRAWLEY                      |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |JEFF SHACKELFORD     R4      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|2     N          Y       94       Power Operation  |94       Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| UNACCOUNTED FOR  ACCESS KEY.  COMPENSATORY MEASURES WERE PUT INTO PLACE.     |
|                                                                              |
| SEE HOO LOG FOR DETAILS.                                                     |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
|                                                                              |
| * * * UPDATE AT 1658 ON 10/21/99 BY KATHLEEN WORK TO JOLLIFFE * * *          |
|                                                                              |
| THE LICENSEE DESIRES TO RETRACT THIS EVENT AS A REPORTABLE EVENT AND WILL    |
| LOG THIS EVENT IN THEIR SAFEGUARDS EVENT LOG SINCE SECURITY IMPLEMENTING     |
| COMPENSATORY ACTIONS WERE IMPLEMENTED WITHIN 15 MINUTES FROM THE TIME THE    |
| LICENSEE DISCOVERED THAT THE KEY WAS MISSING.                                |
|                                                                              |
| SEE THE HOO LOG FOR DETAILS.                                                 |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
|                                                                              |
| THE NRC OPERATIONS OFFICER NOTIFIED THE R4DO LINDA SMITH.                    |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36325       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 10/21/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 08:37[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        10/20/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        10:30[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/21/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |BRUCE JORGENSEN      R3      |
|  DOCKET:  0707002                              |BRIAN SMITH     EO   NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  LARSON                       |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24 HOUR 91-01 BULLETIN RESPONSE                                              |
|                                                                              |
| ON 10/20/99 AT 1030 HOURS, A NUCLEAR CRITICALITY SAFETY ANALYSIS (NCSA)      |
| NONCOMPLIANCE WAS IDENTIFIED IN THE X-330 PROCESS BUILDING. THIS             |
| NONCOMPLIANCE WAS DISCOVERED WHILE REVIEWING OBSERVATIONS FOUND DURING A     |
| WALKDOWN OF IMPLEMENTED NCSAs.                                               |
|                                                                              |
| AT COLUMN C-53 ON THE CELL FLOOR OF X-330, A DRIP PAN CONNECTED TO A PAIR OF |
| LUBE OIL STRAINERS DID NOT MEET THE REQUIREMENTS OF NCSA-PLANT054 FOR LUBE   |
| OIL SYSTEMS. NCSA-PLANT054 REQUIRES ALL LUBE OIL LEAK COLLECTION CONTAINERS  |
| IN AREAS WHERE SIGNIFICANT UF6 RELEASES ARE CONSIDERED CREDIBLE, MEET        |
| CERTAIN SIZE RESTRICTIONS. IN X-330, THE MAXIMUM ALLOWED DEPTH OF A LUBE OIL |
| DRIP PAN ON THE CELL FLOOR IS 3.6 INCHES. THE DRIP PAN FOUND WAS 5.76 INCHES |
| DEEP. THIS VIOLATES THE CONTAINER SIZE REQUIREMENT OF THE NCSA. THE DRIP PAN |
| CONTAINED APPROXIMATELY 25 QUARTS OF OIL AT TIME OF DISCOVERY. THERE WAS NO  |
| EVIDENCE OF ANY UF6 RELEASES IN THE AREA.                                    |
|                                                                              |
| THE CONTAINER SIZE LIMIT WAS EXCEEDED RESULTING IN THE LOSS OF GEOMETRY. THE |
| OTHER CONTROL OF THE DOUBLE CONTINGENCY PRINCIPLE (CONCENTRATION) WAS        |
| MAINTAINED THROUGHOUT THIS EVENT.                                            |
|                                                                              |
| DOUBLE CONTINGENCY WAS REESTABLISHED BY OPENING AND TAGGING (DO NOT CLOSE)   |
| THE DRAIN VALVE IN THE BOTTOM OF THE DRIP PAN. THIS PREVENTS THE             |
| ACCUMULATION OF LUBE OIL TO A DEPTH GREATER THAN 3.6 INCHES. A WORK PACKAGE  |
| WAS DEVELOPED TO REMOVE THE DRIP PAN AND REPLACE IT WITH ONE THAT IS IN      |
| COMPLIANCE WITH NCSA-PLANT054. AT 1400 HOURS                                 |
| ON 10/20/99, THE NONCOMPLIANT DRIP PAN WAS REMOVED AND REPLACED WITH A PAN   |
| HAVING A DEPTH OF UNDER THREE INCHES, REESTABLISHING NCSA-PLANT054           |
| COMPLIANCE.                                                                  |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| THE NRC RESIDENT INSPECTOR AND THE DOE REPRESENTATIVE WERE NOTIFIED.         |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   36326       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: DIABLO CANYON            REGION:  4  |NOTIFICATION DATE: 10/21/1999|
|    UNIT:  [1] [2] []                STATE:  CA |NOTIFICATION TIME: 15:04[EDT]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        10/21/1999|
+------------------------------------------------+EVENT TIME:        10:22[PDT]|
| NRC NOTIFIED BY:  DICK LUCKETT                 |LAST UPDATE DATE:  10/21/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |LINDA SMITH          R4      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          N       0        Refueling        |0        Refueling        |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - OFFSITE AGENCIES NOTIFIED OF A SPILL OF 3 OUNCES OF HYDRAULIC FLUID INTO   |
| PACIFIC OCEAN -                                                              |
|                                                                              |
| THE LICENSEE NOTIFIED THE NATIONAL RESPONSE CENTER (EPA CASE #503190), THE   |
| CALIFORNIA OFFICE OF EMERGENCY SERVICES, AND THE NRC RESIDENT INSPECTOR OF A |
| SPILL OF APPROXIMATELY THREE OUNCES OF BIODEGRADABLE HYDRAULIC FLUID FROM A  |
| KELP HARVESTER INTO THE PACIFIC OCEAN.                                       |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36327       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: ALLIED-SIGNAL INC.                   |NOTIFICATION DATE: 10/21/1999|
|   RXTYPE: URANIUM HEXAFLUORIDE PRODUCTION      |NOTIFICATION TIME: 17:31[EDT]|
| COMMENTS: UF6 CONVERSION (DRY PROCESS)         |EVENT DATE:        10/21/1999|
|                                                |EVENT TIME:        16:00[CDT]|
|                                                |LAST UPDATE DATE:  10/21/1999|
|    CITY:  METROPOLIS               REGION:  3  +-----------------------------+
|  COUNTY:  MASSAC                    STATE:  IL |PERSON          ORGANIZATION |
|LICENSE#:  SUB-526               AGREEMENT:  Y  |BRUCE JORGENSEN      R3      |
|  DOCKET:  04003392                             |CHARLEY HAUGHNEY     NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  HUGH ROBERTS                 |                             |
|  HQ OPS OFFICER:  DICK JOLLIFFE                |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|KBBF 70.50(b)(2)(ii)     EQUIP DISABLED/FAILS   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - PLANT FIRE WATER DELUGE SYSTEM LINE RUPTURED INSIDE THE PLANT -            |
|                                                                              |
| A SIX INCH RECTIFIER 'A' & 'B' PLANT FIRE WATER DELUGE SYSTEM LINE RUPTURED  |
| INSIDE THE PLANT.  THE LICENSEE ISOLATED THE RUPTURE AND PLANS TO POST A     |
| FIRE WATCH AND REPAIR/REPLACE THE RUPTURED SECTION OF LINE.                  |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   36328       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 10/22/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 03:01[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        10/21/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        15:00[EDT]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  10/22/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |BRUCE JORGENSEN      R3      |
|  DOCKET:  0707002                              |CHARLEY HAUGHNEY     NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  SPAETH                       |                             |
|  HQ OPS OFFICER:  CHAUNCEY GOULD               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24 HOUR 91-01 BULLETIN RESPONSE                                              |
|                                                                              |
| On 10/21/ 1999 at 1500 hrs the Plant Shift Superintendent(PSS) was notified  |
| that a Nuclear Criticality Safety Approval (NCSA) requirement was not being  |
| performed in the X-710 ES&H Analytical Labs. NCS Engineering, while          |
| performing an NCS Self Assessment, noticed an operation where samples were   |
| brought to a staging area "INSIDE" a room when they were logged in and       |
| verified. (NCSA-0710_025.AOO)                                                |
|                                                                              |
| Requirement #1 of NCSA-071_25.AOO states in part; Samples in any room        |
| enriched to 1% or greater U-235, will be limited to one group of 30g U-235   |
| per room. This will be ensured by maintaining a room inventory log of U-235  |
| mass in labeled containers. Each log entry will consist of the U-235 mass    |
| value plus analytical uncertainty and will be:                               |
|                                                                              |
| a. made by a knowledgeable person "PRIOR" to bringing the samples into the   |
| room, and                                                                    |
| b. verified by a second knowledgeable person "PRIOR" to bringing the samples |
| into the room.                                                               |
|                                                                              |
| At the direction of the Plant Shift Superintendent the requirements for an   |
| NCS anomalous condition were initiated and the area baundaried off.          |
|                                                                              |
| The safety significance of the event is very low. The U-235 mass in material |
| is being maintained less than 30 grams as required. This is more than a      |
| factor of 10 less than the always safe mass of 350 grams U-235. The samples  |
| were brought to a staging area inside the room where they were logged in and |
| verified. After logging and verifying the samples were moved to the          |
| operational area of the room, where they could interact with other materials |
| in the room.                                                                 |
|                                                                              |
| Samples in any room enriched to 1% or greater U-235, with a concentration    |
| greater or equal to 500 ppm U-235, shall be limited to one group of 30 g     |
| U-235 per room. This shall be ensured by maintaining a room inventory log of |
| U-235 mass in labeled containers. Each log entry shall consist of the U-235  |
| mass value plus analytical uncertainty and shall be:                         |
|                                                                              |
| Mass is the only parameter controlled                                        |
|                                                                              |
| The actual amount of material In the room is less than 30 grams U-235, at an |
| enrichment of less than or equal to 100%. This value is obtained from sample |
| data that was logged after the material was brought Into the room. This is   |
| approximately 4% of the worst case critical mass.                            |
|                                                                              |
| Verbatim compliance with both mass controls was lost because the material    |
| was supposed to be checked and verified prior to bringing the material into  |
| the room. The samples were brought to a staging area inside the room where   |
| they were logged in and verified. After logging and verifying the samples    |
| were moved to the operational area of the room, where they could interact    |
| with other materials in the room.                                            |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| The Resident Inspector was notified and the DOE Representative will be       |
| notified.                                                                    |
+------------------------------------------------------------------------------+
