Event Notification Report for July 2, 1999
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 07/01/1999 - 07/02/1999 ** EVENT NUMBERS ** 35883 35884 35885 35886 35887 +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35883 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: QUEST X TECHNOLOGIES, GUAM |NOTIFICATION DATE: 06/30/1999| |LICENSEE: QUEST X TECHNOLOGIES, GUAM |NOTIFICATION TIME: 19:13[EDT]| | CITY: GUAM REGION: |EVENT DATE: 06/30/1999| | COUNTY: STATE: |EVENT TIME: [EST]| |LICENSE#: AGREEMENT: N |LAST UPDATE DATE: 07/01/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |LINDA HOWELL R4 | | |SUSAN SHANKMAN NMSS | +------------------------------------------------+EPA (BY FAX) | | NRC NOTIFIED BY: CUMMINGS & HICKMAN | | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - PACKAGE OF IRIDIUM - 192 WITHOUT SHIPPING PAPERS LOCATED IN GUAM - | | | | TOM BIRKAMEYER, CHIEF OF SAFETY, CONTINENTAL AIRLINES, GUAM AIRPORT, | | RECEIVED A PACKAGE OF IRIDIUM - 192 ABOUT TWO MONTHS AGO AND STORED IT IN | | THE HAZARDOUS MATERIALS AREA AT THE AIRPORT IN GUAM. THE SHIPPING PAPERS | | ARE NOT AVAILABLE AND THE SHIPPER AND RECEIVER ARE UNKNOWN. | | | | RECENTLY, PERSONNEL AT QUEST X TECHNOLOGIES (JAHA CUMMINGS & WALT HICKMAN) | | TOOK POSSESSION OF THE PACKAGE AND PLACED IT IN A LOCKED STORAGE SHED IN | | GUAM. THE PACKAGE IS A SMALL DRUM, TYPE 'A' PACKAGE WITH THE FOLLOWING | | PARTIALLY OBSCURED MARKINGS: RADIATION SYMBOL, RADIOACTIVE YELLOW 3, SOLID | | FORM, UN-2982 (NUMBER MAY BE INCORRECT), AND "ENGLAND". QUEST PERSONNEL | | MEASURED THE PACKAGE WITH A GM SURVEY INSTRUMENT AND OBTAINED MAXIMUM | | READINGS OF 0.2 MR/HR AT THE SURFACE OF THE PACKAGE. | | | | QUEST PERSONNEL CALLED THE NRC TO REQUEST INSTRUCTIONS ON WHAT TO DO WITH | | THE PACKAGE. | | | | ***** LINDA HOWELL REGION IV to WILLIAM POERTNER 0835 EDT 7/1/99 ****** | | | | Region IV will coordinate with EPA (San Francisco) to resolve issue. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35884 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: SUSQUEHANNA REGION: 1 |NOTIFICATION DATE: 07/01/1999| | UNIT: [1] [] [] STATE: PA |NOTIFICATION TIME: 04:56[EDT]| | RXTYPE: [1] GE-4,[2] GE-4 |EVENT DATE: 07/01/1999| +------------------------------------------------+EVENT TIME: 02:08[EDT]| | NRC NOTIFIED BY: R. PEAL |LAST UPDATE DATE: 07/01/1999| | HQ OPS OFFICER: WILLIAM POERTNER +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |LAWRENCE DOERFLEIN R1 | |10 CFR SECTION: |LEDYARD MARSH NRR | |ACCS 50.72(b)(1)(iv) ECCS INJECTION | | |ARPS 50.72(b)(2)(ii) RPS ACTUATION | | |AESF 50.72(b)(2)(ii) ESF ACTUATION | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 A/R Y 100 Power Operation |0 Hot Shutdown | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | ECCS INJECTION, RPS ACTUATION, AND ESF ACTUATION. | | | | Susquehanna Unit 1 experienced a Reactor Scram due to a neutron monitoring | | upscale trip signal. Preliminary indication is that the 'C' outboard MSIV | | went closed, causing the high neutron flux that tripped the reactor. The | | other three steam lines experienced high steam flow resulting in the closure | | of all the steam line isolation valves. As a result of the Reactor Scram | | with MSIV closure, water level dropped to approximately minus 46 inches on | | wide range level instrumentation. Level was restored to 35 inches using | | high pressure coolant injection (HPCI) and reactor core isolation cooling | | (RCIC). Reactor pressure peaked at 1048 psig prior to the scram. All | | control rods inserted and safety relief valves were cycled to control | | pressure. | | | | The licensee entered a 12 hour to cold shutdown LCO at 02:51 EDT due to | | suppression pool temperature exceeding 120 degrees. Suppression pool | | temperature is presently 134 degrees. | | | | The licensee has notified the NRC resident inspector. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Other Nuclear Material |Event Number: 35885 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: NATIONAL RESPONSE CENTER |NOTIFICATION DATE: 07/01/1999| |LICENSEE: WILLARD BAY STATE PARK, UTAH |NOTIFICATION TIME: 13:06[EDT]| | CITY: WILLARD CITY REGION: 4 |EVENT DATE: 07/01/1999| | COUNTY: BOX ELDER STATE: UT |EVENT TIME: 10:00[MDT]| |LICENSE#: AGREEMENT: Y |LAST UPDATE DATE: 07/01/1999| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |LINDA SMITH R4 | | |FRED COMBS NMSS | +------------------------------------------------+JOSEPH GIITTER IRO | | NRC NOTIFIED BY: PENDLETON |WILLIAM SINCLAIR UT | | HQ OPS OFFICER: DICK JOLLIFFE | | +------------------------------------------------+ | |EMERGENCY CLASS: N/A | | |10 CFR SECTION: | | |NINF INFORMATION ONLY | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - LUNCH COOLER WITH RADIOACTIVE & BIOHAZARDS MATERIALS LABELS FOUND IN A | | STATE PARK - | | | | THE NATIONAL RESPONSE CENTER NOTIFIED THE NRC THAT PARK RANGER STEPHEN OLSEN | | FOUND A STANDARD IGLOO LUNCH SIZE COOLER AT A BOAT LAUNCH RAMP IN WILLARD | | BAY STATE PARK, WILLARD CITY, UT. THE COOLER HAD RADIOACTIVE AND BIOHAZARD | | MATERIALS LABELS ON IT. THE COOLER WAS NOT EMPTY AND APPEARED TO CONTAIN | | ICE AND POSSIBLY OTHER CONTENTS. MR OLSEN MOVED THE COOLER TO A MAINTENANCE | | AREA AWAY FROM PEOPLE AND NOTIFIED THE LOCAL SHERIFF. | | | | THE NATIONAL RESPONSE CENTER NOTIFIED MR BYRON, EPA REGION VIII. NATIONAL | | RESPONSE INCIDENT REPORT #489662. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 35886 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: CALVERT CLIFFS REGION: 1 |NOTIFICATION DATE: 07/01/1999| | UNIT: [1] [2] [] STATE: MD |NOTIFICATION TIME: 14:57[EDT]| | RXTYPE: [1] CE,[2] CE |EVENT DATE: 07/01/1999| +------------------------------------------------+EVENT TIME: 14:45[EDT]| | NRC NOTIFIED BY: NICK LAVATO |LAST UPDATE DATE: 07/01/1999| | HQ OPS OFFICER: DICK JOLLIFFE +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: N/A |LAWRENCE DOERFLEIN R1 | |10 CFR SECTION: | | |AUNA 50.72(b)(1)(ii)(A) UNANALYZED COND OP | | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | |2 N Y 100 Power Operation |100 Power Operation | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | - OPERABILITY DETERMINATION FOR CR HABITABILITY USED UNAPPROVED METHODOLOGY | | - | | | | LICENSEE PERSONNEL PERFORMED AN OPERABILITY DETERMINATION FOR CONTROL ROOM | | (CR) HABITABILITY USING SOUND ENGINEERING PRINCIPLES. THIS DETERMINATION | | INCLUDED DOSE ASSESSMENTS FOR CONTROL ROOM OPERATORS DURING CERTAIN LIMITING | | ACCIDENTS. HOWEVER, THESE ASSESSMENTS USED PORTIONS OF METHODOLOGY NOT | | SPECIFIED IN THE UFSAR THAT HAD BEEN SUBMITTED TO THE NRC FOR APPROVAL ON | | 04/09/98. THIS METHODOLOGY HAD NOT YET BEEN APPROVED BY THE NRC FOR USE | | SPECIFICALLY AT CALVERT CLIFFS. | | | | THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Fuel Cycle Facility |Event Number: 35887 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 07/02/1999| | RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 00:50[EDT]| | COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 07/02/1999| | 6903 ROCKLEDGE DRIVE |EVENT TIME: 00:40[EDT]| | BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 07/02/1999| | CITY: PIKETON REGION: 3 +-----------------------------+ | COUNTY: PIKE STATE: OH |PERSON ORGANIZATION | |LICENSE#: GDP-2 AGREEMENT: N |JAMES CREED R3 | | DOCKET: 0707002 |SUSAN SHANKMAN NMSS | +------------------------------------------------+JOSEPH GIITTER IRO | | NRC NOTIFIED BY: MAY |PAT HILAND REG3 | | HQ OPS OFFICER: CHAUNCEY GOULD |ROY CANIANO REG3 | +------------------------------------------------+LIZ TEN EYCK NMSS | |EMERGENCY CLASS: ALE | | |10 CFR SECTION: | | |OADD 76.120(a)(4) EMERGENCY DECLARED | | |OCBB 76.120(c)(2)(ii) EQUIP DISABLED/FAILS | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | DECLARED ALERT DUE TO THE CRITICALITY ACCIDENT ALARM SYSTEM (CAAS) BEING | | DECLARED INOPERABLE. | | | | THEY DISCOVERED THAT THE RADIATION ALARM SYSTEM, CAAS, FAILED ITS | | SURVEILLANCE DUE TO THE CALIBRATION SETPOINT BEING INCORRECT. THE CORRECT | | SETPOINT SHOULD BE 5MR/HR, BUT THE AS FOUND SETPOINT WAS 8.57MR/HR. DUE TO | | THIS CONDITION, THEY CAN NOT MEET THEIR OPERABILITY REQUIREMENTS FOR THE | | CAAS, SO ALL OF THE CAAS IS BEING DECLARED INOPERABLE (BUT FUNCTIONAL) WHICH | | PUTS THE PLANT AT THE ALERT LEVEL PER THE EMERGENCY ACTION LEVEL PROCEDURES. | | ALL OF THE AUTOCLAVE AREAS ARE SHUTDOWN AND PLANT PERSONNEL THAT ARE | | STAFFING THE FACILITIES ARE USING ALARMING DOSIMETERS. THE CASCADES AT THIS | | TIME ARE STILL OPERATING. THERE ARE 76 CLUSTERS AFFECTED BY THIS CONDITION. | | IT IS BELIEVED THAT THESE INSTRUMENTS HAVE NOT BEEN CALIBRATED CORRECTLY | | SINCE INSTALLATION. THEY HAVE NOT YET DETERMINED WHEN CALIBRATION OF CAAS | | WILL BE COMPLETED. | | | | THEY HAVE NOTIFIED THE NRC RESIDENT INSPECTOR, THE DOE SITE REPRESENTATIVE, | | DOE OAK RIDGE, OHIO EMA, PIKE COUNTY LEPC AND PIKE COUNTY EMA. | | | | *** UPDATE ON 7/2/99 @ 0251 BY MCCRAE TO GOULD *** | | | | SITE STILL RESTRICTING ACCESS TO ALL AREAS AFFECTED BY THE INOPERABLE CAAS | | MONITORS. | | RECOVERY EFFORTS ARE BEING IMPLEMENTED TO RECALIBRATE THE MONITORS. | | NONESSENTIAL PERSONNEL ON DAY SHIFT WILL BE SENT HOME UPON ARRIVAL. | | | | THE HEADQUARTERS OPERATIONS OFFICER NOTIFIED THE R3DO (JAMES CREED) AND NMSS | | EO (SUSAN SHANKMAN). | | | | *** UPDATE ON 7/2/99 @ 0432 BY CASTLE TO GOULD *** | | | | THE SITE WILL BE MAKING A PRESS RELEASE AND NOTIFIED DOE. THIS ACTION | | REQUIRES A 4 HOUR NOTIFICATION TO NRC. | | | | WITH THE CAAS CLUSTERS INOPERABLE AND NOT AVAILABLE TO FUNCTION AS DESIGNED, | | THIS IS A 24 HOUR NOTIFICATION REQUIREMENT. | | | | THE HEADQUARTERS OPERATIONS OFFICER NOTIFIED THE R3DO (JAMES CREED) AND NMSS | | EO (SUSAN SHANKMAN). | | | | | | THE R3DO (JAMES CREED) AND NMSS EO (SUSAN SHANKMAN) WERE NOTIFIED. | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021