The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for January 26, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           01/25/1999 - 01/26/1999

                              ** EVENT NUMBERS **

35275  35312  35313  35314  35315  35316  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35275       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 01/15/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 18:08[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        01/15/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        14:10[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  01/25/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |JIM GAVULA           R3      |
|  DOCKET:  0707002                              |JOHN SURMEIER        NMSS    |
+------------------------------------------------+FRANK CONGEL         IRO     |
| NRC NOTIFIED BY:  RICHARD LARSON               |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 4-HOUR NRC 91-01 BULLETIN NOTIFICATION INVOLVING ABANDONED EQUIPMENT IN THE  |
| X-326 PROCESS BUILDING                                                       |
|                                                                              |
| THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM PORTSMOUTH:     |
|                                                                              |
| "ON JANUARY 15, 1999, AT 1410 HOURS, IT WAS DISCOVERED THAT THE X-326        |
| PROCESS BUILDING NUCLEAR CRITICALITY APPROVALS (NCSAs)  DO NOT DESCRIBE THE  |
| OPERATION/CONTROLS FOR THE FOLLOWING ABANDONED IN PLACE EQUIPMENT:  PRODUCT  |
| PURIFICATION DISTILLATION TOWER, OLD EVACUATION JETS, OLD SO2 REACTOR, OLD   |
| PW BOOSTER CONNECTED TO CELL 25-7-15,  AND [AN] OLD FREON DEGRADER."         |
|                                                                              |
| "THIS IS REPORTABLE DUE TO NOT HAVING ANY NCSA IN PLACE FOR THIS ABANDONED   |
| EQUIPMENT."                                                                  |
|                                                                              |
| "THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                      |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT."  |
|                                                                              |
| A PRIOR NRC NOTIFICATION (EVENT #33627) WAS MADE WHICH IDENTIFIED LEGACY     |
| EQUIPMENT IN THE X-326 PROCESS BUILDING; HOWEVER, THE ABOVE EQUIPMENT WAS    |
| INADVERTENTLY OMITTED.  THE EQUIPMENT IS IN GEOMETRICALLY FAVORABLE          |
| CONDITIONS AND CONTAINS URANIUM BELOW THE SAFE MASS LIMIT.  THIS CONDITION   |
| WAS DISCOVERED IN A REVIEW OF COMPLETED NCSAs.                               |
|                                                                              |
| PORTSMOUTH PLANS TO INFORM THE [DEPARTMENT OF ENERGY (DOE)] SITE             |
| REPRESENTATIVE AND HAS INFORMED THE NRC RESIDENT INSPECTOR.                  |
|                                                                              |
| * * * UPDATE AT 1955 ON 01/18/99 FROM LARSON TAKEN BY WEAVER * * *           |
|                                                                              |
| THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM PORTSMOUTH:     |
|                                                                              |
| "THIS IS REPORTABLE DUE TO NOT HAVING ANY NCSA IN PLACE FOR THIS ABANDONED   |
| EQUIPMENT."                                                                  |
|                                                                              |
| UPDATE:  DUE TO THE PROBLEMS CONCERNING ABANDONED EQUIPMENT IN THE X-326     |
| BUILDING NOT COVERED BY NUCLEAR CRITICALITY SAFETY APPROVALS (NCSAs), A      |
| SEARCH PERFORMED IN THE X-705 [AND] X-700 [BUILDINGS] REVEALED ABANDONED     |
| EQUIPMENT THAT MAY NEED NCSAs.  THE PLANT IS FOLLOWING IT'S PROCEDURE FOR    |
| ANOMALOUS NCSA CONDITIONS, AND FURTHER EVALUATIONS ARE IN PROGRESS TO        |
| DETERMINE IF THIS ABANDONED EQUIPMENT MEETS THE FISSILE MATERIAL LIMITS.     |
| THE FISSILE MATERIAL LIMIT OF 15 GRAMS U235 BY PLANT PROCEDURES REQUIRES     |
| NCSAs."                                                                      |
|                                                                              |
| "THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                      |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT."  |
|                                                                              |
| PORTSMOUTH INFORMED THE NRC RESIDENT INSPECTOR.  THE NRC OPERATIONS OFFICER  |
| NOTIFIED THE R3DO (GAVULA), NMSS EO (SURMEIER), AND IRO (CONGEL).            |
|                                                                              |
| * * * UPDATE AT 1643 ON 01/20/99 FROM HALCOMB TAKEN BY WEAVER * * *          |
|                                                                              |
| THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM PORTSMOUTH:     |
|                                                                              |
| "DUE TO PROBLEMS CONCERNING ABANDONED EQUIPMENT IDENTIFIED IN THE X-326      |
| BUILDING NOT COVERED BY AN NCSA, A PLANT WIDE SEARCH WAS INITIATED TO        |
| IDENTIFY ALL EQUIPMENT WHICH MAY MEET THE FISSILE MATERIAL LIMITS AND WOULD  |
| REQUIRE AN ACTIVE NCSA.  THIS SEARCH HAS IDENTIFIED THAT THE X-344, X-333,   |
| AND THE X-330 BUILDINGS CONTAIN ABANDONED EQUIPMENT THAT WILL REQUIRE AN     |
| NCSA.  ALL IDENTIFIED EQUIPMENT HAS BEEN BOUNDARIED OFF AND AN ANOMALOUS NCS |
| CONDITION REPORT COMPLETED."                                                 |
|                                                                              |
| "THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                      |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT."  |
|                                                                              |
| PORTSMOUTH INFORMED THE NRC RESIDENT INSPECTOR.  THE NRC OPERATIONS OFFICER  |
| NOTIFIED THE R3DO (LANKSBURY), NMSS EO (BELL), AND IRO (CONGEL).             |
|                                                                              |
| *** UPDATE ON 01/21/99 AT 1847 EST FROM SISSLER TAKEN BY MacKINNON ***       |
|                                                                              |
| During ongoing plant search for abandoned equipment, additional equipment    |
| was discovered in the X-326 building which may meet the fissile material     |
| limits and would require an active NCSA.  The identified equipment has been  |
| boundaried off and an anomalous NCS condition report completed.              |
|                                                                              |
| The NRC resident inspector was notified of this event by the certificate     |
| holder.  The NRC operations officer notified the R3DO (Lanksbury) and NMSS   |
| EO (Bell) .                                                                  |
|                                                                              |
| * * * UPDATE ON 01/25/99 AT 1255 EST FROM RICHARD LARSON TO FANGIE JONES * * |
| *                                                                            |
|                                                                              |
| During ongoing plant sweeps for abandoned equipment, additional equipment    |
| was discovered in the X-326 and X-333 buildings which may meet the fissile   |
| material limits and would require an active NCSA.  The equipment consists of |
| GCEP (Gaseous Centrifugal Enrichment Process) sample carts that are no       |
| longer used.  The carts in the X-326 building have been determined not to    |
| have two major components which could contain fissile materials; however,    |
| the carts in the X-333 building are still being investigated.  The equipment |
| has been boundaried off and an NCS condition report completed.               |
|                                                                              |
| The NRC resident inspector was notified and the onsite DOE representative    |
| will be notified by the certificate holder.  The NRC operations officer      |
| notified the R3DO (Tony Vegel), NMSS EO (Don Cool), and IRO (Frank Congel).  |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   35312       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  U.S. ARMY (ACALA)                    |NOTIFICATION DATE: 01/25/1999|
|LICENSEE:  U.S. ARMY (ACALA)                    |NOTIFICATION TIME: 11:17[EST]|
|    CITY:  ROCK ISLAND              REGION:  3  |EVENT DATE:        01/07/1999|
|  COUNTY:                            STATE:  IL |EVENT TIME:             [CST]|
|LICENSE#:  12-00722-06           AGREEMENT:  Y  |LAST UPDATE DATE:  01/25/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |TONY VEGEL           R3      |
|                                                |DON COOL             NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JEFF HAVENNER                |                             |
|  HQ OPS OFFICER:  FANGIE JONES                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| MISSING M43A1 CHEMICAL AGENT DETECTOR                                        |
|                                                                              |
| A unit stationed in South Korea lost a model-M43A1 Chemical Agent Detector   |
| between 11/02/98 and 11/05/98 while training in South Korea.  The detector   |
| contains a 250-microcurie Am-241 source.  The Army is attempting to locate   |
| the detector, has searched the training area, and is investigating the loss. |
| The loss was discovered on 01/07/99 during an inventory for a change of      |
| command.                                                                     |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35313       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SALEM                    REGION:  1  |NOTIFICATION DATE: 01/25/1999|
|    UNIT:  [1] [2] []                STATE:  NJ |NOTIFICATION TIME: 17:26[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        01/25/1999|
+------------------------------------------------+EVENT TIME:        10:00[EST]|
| NRC NOTIFIED BY:  FRANK SOENS                  |LAST UPDATE DATE:  01/25/1999|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |FRANK COSTELLO       R1      |
|10 CFR SECTION:                                 |                             |
|HFIT 26.73               FITNESS FOR DUTY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| FITNESS-FOR-DUTY REPORT                                                      |
|                                                                              |
| A LICENSED EMPLOYEE WHO WAS NOT PERFORMING LICENSED ACTIVITIES AT THE TIME   |
| WAS DETERMINED TO BE UNDER THE INFLUENCE OF ALCOHOL DURING A "FOR-CAUSE"     |
| TEST.  THE EMPLOYEE'S ACCESS HAS BEEN SUSPENDED.  CONTACT THE HEADQUARTERS   |
| OPERATIONS OFFICER FOR DETAILS.                                              |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|General Information or Other                     |Event Number:   35314       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  TEXAS DEPARTMENT OF HEALTH           |NOTIFICATION DATE: 01/25/1999|
|LICENSEE:  H&G INSPECTION COMPANY               |NOTIFICATION TIME: 17:28[EST]|
|    CITY:  HOUSTON                  REGION:  4  |EVENT DATE:        01/25/1999|
|  COUNTY:  HARRIS                    STATE:  TX |EVENT TIME:             [CST]|
|LICENSE#:  2181                  AGREEMENT:  Y  |LAST UPDATE DATE:  01/25/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |CHARLES MARSCHALL    R4      |
|                                                |MIKE BELL            NMSS    |
+------------------------------------------------+FRANK CONGEL         IRO     |
| NRC NOTIFIED BY:  HELEN WATKINS (FAX)          |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NAGR                     AGREEMENT STATE        |                             |
|BAE1 20.2202(b)(1)       PERS OVEREXPOSURE      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| AGREEMENT STATE REPORT RECEIVED VIA FACSIMILE                                |
|                                                                              |
| THE TEXAS DEPARTMENT OF HEALTH - BUREAU OF RADIATION CONTROL (TDH-BRC)       |
| REPORTED THAT THE H&G INSPECTION COMPANY, LOCATED IN HOUSTON, TX, NOTIFIED   |
| THEM OF A 5.4-REM EXPOSURE TO A RADIOGRAPHER.  THE WHOLE BODY EXPOSURE WAS   |
| ANNUAL JANUARY THROUGH NOVEMBER 1998; THE DECEMBER 1998 BADGE IS BEING       |
| EVALUATED BY THE PROCESSOR.  THE NOVEMBER 1998 EXPOSURE EXCEEDING THE        |
| REGULATORY LIMIT WAS RECEIVED BY THE LICENSEE IN 1999.   TDH-BRC IS          |
| INVESTIGATING AND HAS IDENTIFIED THIS REPORT AS INCIDENT #7412.              |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35315       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 01/25/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 19:45[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        01/25/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        08:30[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  01/25/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |TONY VEGEL           R3      |
|  DOCKET:  0707002                              |MIKE BELL            NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  JOHN JORDAN                  |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24-HOUR NRC 91-01 BULLETIN NOTIFICATION INVOLVING STORED MATERIAL NOT        |
| MEETING THE FOUR (4) FEET SPACING REQUIREMENT PER THE NCSA                   |
|                                                                              |
| THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM PORTSMOUTH:     |
|                                                                              |
| "ON MONDAY, JANUARY 25, 1999, AT 0830 HOURS, A FRONT LINE MANAGER (FLM)      |
| DISCOVERED THAT A NUCLEAR CRITICALITY APPROVAL (NCSA) REQUIREMENT WAS NOT    |
| BEING MAINTAINED IN THE X-705 DECONTAMINATION FACILITY.  NCSA-0705_064,      |
| TITLED 'SEAL CAN HANDLING AND STORAGE IN X-705,' REQUIREMENT #10 STATES:  A  |
| GROUP OF SEAL CAN CANS SHALL BE KEPT AT LEAST FOUR (4) FEET FROM OTHER       |
| URANIUM-BEARING MATERIALS (INCLUDING OTHER GROUPS OF SEAL CANS).  THE FLM    |
| DISCOVERED THAT OTHER POTENTIALLY URANIUM-BEARING MATERIAL (G-17 PROCESS     |
| VALVES) WERE BEING STORED WITHIN TWO (2) FEET OF THE SEAL CANS IN AN         |
| APPROVED STORAGE AREA.                                                       |
|                                                                              |
| "THE BASES FOR NUCLEAR CRITICALITY SAFETY ARE MASS, ENRICHMENT, MODERATION,  |
| AND INTERACTION CONTROL.  MASS OF U-235 IS LIMITED BY THE PHYSICAL SIZE OF   |
| THE VOID SPACE INSIDE THE SEALS AND BY ENSURING THAT NO VISIBLE              |
| CONTAMINATION EXISTS ON ANY SEAL THAT IS PUT INTO A SEAL CAN.  ENRICHMENT OF |
| THE URANIUM IN ALL SEAL CANS HANDLED UNDER THE REQUIREMENTS OF THIS NCSA IS  |
| LIMITED TO LESS THAN 20% U-235.  MODERATION  IS CONTROLLED BY PROHIBITING    |
| THE INTRODUCTION OF MODERATING MATERIALS INTO THE SEAL CANS.  INTERACTION IS |
| CONTROLLED BY LIMITING THE NUMBER OF SEAL CANS THAT MAY BE GROUPED TOGETHER  |
| AND BY LIMITING THE MINIMUM SPACING AMONG SEAL CAN GROUPS AND OTHER          |
| URANIUM-BEARING MATERIALS.                                                   |
|                                                                              |
| "THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                      |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| "PROPER SPACING WAS RESTORED BY FACILITY OPERATORS UNDER THE DIRECT          |
| OBSERVATION OF NUCLEAR CRITICALITY SAFETY ENGINEERING.  THIS ACTION WAS      |
| COMPLETED AT 1030 HOURS."                                                    |
|                                                                              |
| THE NRC RESIDENT INSPECTOR AND DEPARTMENT OF ENERGY SITE REPRESENTATIVE WERE |
| INFORMED BY PORTSMOUTH PERSONNEL.                                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35316       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT      |NOTIFICATION DATE: 01/25/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 20:59[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        01/25/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        07:55[CST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  01/25/1999|
|    CITY:  PADUCAH                  REGION:  3  +-----------------------------+
|  COUNTY:  McCRACKEN                 STATE:  KY |PERSON          ORGANIZATION |
|LICENSE#:  GDP-1                 AGREEMENT:  Y  |TONY VEGEL           R3      |
|  DOCKET:  0707001                              |MIKE BELL            NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  KEVIN BEASLEY                |                             |
|  HQ OPS OFFICER:  STEVE SANDIN                 |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| 24-HOUR NRC 91-01 BULLETIN NOTIFICATION INVOLVING FAILURE TO OBSERVE DOUBLE  |
| CONTINGENCY REQUIREMENTS                                                     |
|                                                                              |
| The following text is a portion of a facsimile received from Paducah:        |
|                                                                              |
| "At 0755 on 1-25-99, it was determined that work had been performed in C-337 |
| on Unit 4 Cell 2 Stage 1 A-line instrument boss on 1-23-99 without two       |
| pre-penetration independent Non-Destructive Analyses (NDA) being performed   |
| as required by Nuclear Criticality Safety Assessment (NCSA) GEN-10-02.   A   |
| single pre-penetration NDA was performed which indicated the categorization  |
| to be Uncomplicated Handling (UH).  The pre-penetration NDA measurements are |
| used to independently verify that the mass of uranium contained within the   |
| adjacent system is an always safe mass and can be categorized as UH.  The    |
| pre-penetration NDAs are required to be performed prior to penetrating the   |
| system of an off-stream cell component greater than 5-inches in diameter.    |
| Since the independent NDA was not performed prior to making the penetration, |
| double contingency was not maintained.                                       |
|                                                                              |
| "A second NDA was performed on 1-25-99 which indicated through independent   |
| verification that no unsafe mass was present at the location of the          |
| penetration.                                                                 |
|                                                                              |
| "This event is submitted in accordance with Safety Analysis Report Table     |
| 6.9-1, Criteria A.4.a, as an NRC Bulletin 91-01, Supplement 1."              |
|                                                                              |
| The NRC resident inspector was informed, and the Department of Energy site   |
| representative will be informed by Paducah personnel.                        |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021