December 1999 |
Date |
Document Number |
Description |
12/30/1999 |
I-99-107 |
NRC to Hold "Roundtable Discussion" at Public Meeting in Oswego, N.Y., on New Reactor Oversight Program |
12/30/1999 |
99-272 |
NRC Seeks Public Comments on Trojan License Termination Plan |
12/30/1999 |
II-99-58 |
NRC Region II to Monitor Nuclear Plants in the Southeast During Y2K Transition |
12/29/1999 |
I-99-106 |
NRC, Utility to Discuss Yankee Rowe Decommissioning Work |
12/29/1999 |
II-99-57 |
NRC Staff Schedules Enforcement Conference with West Virginia University on January 7 |
12/28/1999 |
I-99-105 |
NRC Region I to Monitor Northeast Plants During Y2K Transition |
12/23/1999 |
99-271 |
Note to Editors: NRC Staffing for Media Assistance During Y2K Transition |
12/23/1999 |
99-270 |
New NRC Regulation to Permit Nuclear Power Plants to Change Accident Analyses of Public Radiation Dose |
12/23/1999 |
99-269 |
Panel Recommends NRC's New Reactor Oversight Process Be Used for All Plants |
12/23/1999 |
99-268 |
NRC Finds No Outstanding Y2K Problems at Nuclear Plants Undergoing Decommissioning |
12/22/1999 |
99-267 |
NRC Completes Its Environmental Review of Application to Renew Operating License for Oconee Nuclear Station |
12/22/1999 |
99-266 |
NRC Joint Subcommittee to Hold Meeting on January 13-14 in Rockville |
12/22/1999 |
99-265 |
Licensing Board to Hear Oral Arguments on Shearon Harris Spent Fuel Pools |
12/21/1999 |
III-99-51 |
NRC to Hold "Roundtable Discussion" at Public Meeting on New Reactor Oversight Program |
12/21/1999 |
III-99-050 |
NRC Proposes $88,000 Fine Against U.S. Enrichment Corp. for Employment Discrimination Violation at Paducah Plant |
12/20/1999 |
99-264 |
NRC Considers Requiring Licensees to Notify Native American Tribes of Certain Radioactive Waste Shipments |
12/16/1999 |
I-99-104 |
NRC Sends Inspector to New Jersey in Response to Broken Exit Sign |
12/15/1999 |
99-263 |
NRC Certifies Westinghouse Electric Company's AP600 Reactor Design |
12/15/1999 |
I-99-103 |
NRC Issues Order to Pennsylvania Man for Possessing Nuclear Gauges Without an NRC License |
12/13/1999 |
99-262 |
NRC Clarifies Treatment of Information on Nuclear Power Plant Outages And Restart Schedules |
12/13/1999 |
IV-99-42 |
NRC Appoints Vincent Gaddy Senior Resident Inspector at Callaway |
12/10/1999 |
I-99-102 |
Note to Editors |
12/10/1999 |
III-99-49 |
NRC Staff Issues Confirmatory Order to Medical Technologist for Deliberate Misconduct at Michigan Hospital |
12/10/1999 |
I-99-101 |
NRC to Meet with New Jersey Company to Discuss Apparent Violations |
12/09/1999 |
99-261 |
Thermal Science Agrees to $300,000 Settlement With Nuclear Regulatory Commission |
12/09/1999 |
III-99-48 |
NRC Chairman Richard A. Meserve to Hold News Conference on Dec. 13 Following Visit to D. C. Cook Nuclear Power Plant |
12/09/1999 |
I-99-100 |
NRC to Meet with NAESCO to Discuss Performance at Seabrook Station |
12/09/1999 |
I-99-99 |
NRC to Discuss Performance at Beaver Valley Nuclear Power Plant |
12/07/1999 |
99-260 |
NRC Names Manuel D. Cerqueira, M.D., to Head Advisory Committee on Medical Uses of Isotopes |
12/07/1999 |
99-259 |
NRC Issues Draft Policy Statement, Schedules Public Meeting on West Valley, New York, Site |
12/06/1999 |
99-258 |
NRC Schedules Third Meeting to Obtain Public Views on Revision of Nuclear Fuel Facility Inspection Program |
12/03/1999 |
I-99-98 |
NRC Prehearing Conference Scheduled for Millstone Station |
12/02/1999 |
IV-99-41 |
NRC to Meet with Public to Discuss License Termination Plans for Trojan Nuclear Plant |
12/02/1999 |
99-257 |
Pilot Program Evaluation Panel to Meet in Rockville, Maryland, December 8-9 |
12/02/1999 |
99-256 |
NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland on December 14-16 |
12/01/1999 |
99-255 |
NRC to Hold Workshop on Reactor Entombment Option |
November 1999
|
11/30/1999 |
99-254 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland, on December 15-16 |
11/30/1999 |
99-253 |
NRC Schedules Meetings in Nevada to Discuss Performance of Spent Fuel Transportation Casks in Accidents |
11/30/1999 |
99-252 |
International Atomic Energy Agency Safety Review Team to Visit North Anna Nuclear Plant |
11/29/1999 |
IV-99-40 |
Waterford Nuclear Plant Terminates Alert NRC Deactivates Incident Response Center |
11/29/1999 |
IV-99-39 |
NRC Monitors Alert at Waterford Nuclear Plant |
11/29/1999 |
99-251 |
NRC Approves Transfer of Clinton Power Plant Operating License to Amergen Energy Company |
11/26/1999 |
99-250 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
11/26/1999 |
II-99-56 |
NRC Staff to Hold Performance Evaluation at Framatome Cogema Fuels in Lynchburg |
11/26/1999 |
II-99-55 |
NRC Staff Proposes $2,750 Civil Penalty Against Western Soil, Inc. of Mayaguez, Puerto Rico |
11/24/1999 |
I-99-97 |
NRC Chairman Richard A. Meserve to Hold News Briefing Following Visit to Limerick Generating Station |
11/23/1999 |
IV-99-38 |
NRC to Hold "Roundtable Discussion" at Public Meeting December 1 in Omaha on New Reactor Oversight Program |
11/23/1999 |
IV-99-37 |
NRC to Hold "Roundtable Discussion" at Public Meeting November 30 in Auburn on New Reactor Oversight Program |
11/22/1999 |
99-249 |
NRC to Hold Workshop January 10-13 on Results of its Pilot Plant Evaluation |
11/18/1999 |
99-248 |
NRC Issues Notice to Fuel Facilities to Ensure Controls Exist to Prevent Criticality Accidents |
11/17/1999 |
I-99-96 |
NRC to Meet with Consolidated Edison to Discuss Performance at Indian Point 2 Nuclear Plant |
11/17/1999 |
I-99-95 |
NRC Assigns New Senior Resident Inspector at Oyster Creek Nuclear Plant |
11/17/1999 |
99-247 |
NRC Issues Safety Evaluation Report on Calvert Cliffs License Renewal Application |
11/16/1999 |
99-246 |
Note to Editors |
11/16/1999 |
99-245 |
NRC to Hold Chicago Meeting on Control of Solid Materials from Licensed Facilities |
11/16/1999 |
99-244 |
NRC to Meet with State Liaison Officers |
11/12/1999 |
I-99-94 |
NRC Names New Senior Resident Inspector at Hope Creek Nuclear Plant |
11/12/1999 |
99-243 |
NRC Schedules Public Meeting to Discuss New Document Management System |
11/09/1999 |
II-99-54 |
NRC Commissioner to Visit Oconee Nuclear Plant November 16 |
11/09/1999 |
99-242 |
NRC Schedules Public Workshop to Discuss Programs to Manage Equipment Aging |
11/09/1999 |
99-241 |
NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland |
11/08/1999 |
99-240 |
NRC Confirms That All Nuclear Power Plants Are Fully Y2K-Ready |
11/05/1999 |
99-239 |
Commission to Meet with Stakeholders November 9 on Nuclear Materials and Waste Activities |
11/05/1999 |
99-238 |
NRC and Utah Choose PricewaterhouseCoopers as Trustee for Atlas Uranium Mill Tailings Pile |
11/05/1999 |
III-99-47 |
NRC Staff Proposes $110,000 Fine Against Commonwealth Edison for Discriminating Against Worker Who Raised Safety Issues |
11/05/1999 |
99-237 |
Pilot Program Evaluation Panel to Meet in Rockville, Maryland, November 16-17 |
11/04/1999 |
99-236 |
Note to Editors |
11/03/1999 |
I-99-93 |
NRC Assigns New Resident Inspector at Nine Mile Point |
11/03/1999 |
99-235 |
NRC Comments on EPA's Proposed Radiation Standards for Yucca Mountain Waste Repository |
11/02/1999 |
I-99-92 |
NRC Assigns New Senior Resident Inspector at Ginna Nuclear Plant |
11/02/1999 |
99-234 |
Note to Editors |
October 1999
|
10/29/1999 |
99-233 |
Note to Editors |
10/29/1999 |
99-232 |
NRC Makes Documents Available to the Public on its Website |
10/28/1999 |
99-231 |
NRC Schedules Roundtable Discussion in Las Vegas on "Defense-in-Depth" at Yucca Mountain |
10/28/1999 |
99-230 |
NRC Proposes Changes to Regulations on Spent Fuel Cask Fabrication, Hearing Scope |
10/28/1999 |
99-229 |
Note to Editors |
10/28/1999 |
99-228 |
NRC Proposes Amending Regulations Clarifying Antitrust Review Requirements |
10/28/1999 |
IV-99-36 |
NRC to Discuss Sequoyah Fuels Decommissioning at a Public Meeting in Webbers Falls |
10/27/1999 |
99-227 |
NRC to Reexamine Spent Fuel Transportation Cask Accident Studies; Meetings Scheduled in Bethesda, Maryland and Henderson, Nevada |
10/27/1999 |
I-99-91 |
NRC to Meet with Holy Redeemer Hospital Officials to Discuss Apparent Violations |
10/27/1999 |
II-99-53 |
NRC Staff Schedules Enforcement Conference in Ponce, Puerto Rico to Discuss Nuclear Material Safety Concerns with Local Company |
10/27/1999 |
II-99-52 |
NRC Staff Schedules Enforcement Conference in Ponce, Puerto Rico on November 9 to Discuss Security Concerns with Mayaguez Company |
10/25/1999 |
III-99-46 |
NRC Proposes $8,800 Fine for Illinois Company for Violations Involving Radiography Operations |
10/25/1999 |
99-226 |
NRC Seeks Suggestions from Public on Topics for 12th Annual Regulatory Information Conference March 27-29 |
10/22/1999 |
III-99-45 |
NRC Issues Order Barring Kewaunee Security Training Manager from Taking Part in NRC-Licensed Activities for Three Years |
10/22/1999 |
99-225 |
NRC to Hold Meeting in Rockville, Maryland, on Control of Solid Materials from Licensed Facilities |
10/22/1999 |
II-99-51 |
NRC Region II Issues Mid-Cycle Plant Performance Review Results |
10/20/1999 |
99-223 |
NRC to Hold Public Workshop in Rockville, Maryland on Potential Changes to Hearing Process |
10/20/1999 |
99-224 |
NRC Revises Enforcement Policy for Assessing the Significance of Violations |
10/20/1999 |
99-222 |
NRC Posts Inspection Reports on Internet Website for Nuclear Power Plants in Pilot Assessment |
10/20/1999 |
99-221 |
Dames & Moore Declines NRC's Offer of Trusteeship for Atlas Uranium Mill Tailings Pile |
10/19/1999 |
99-220 |
NRC Conducts Full-Scale Emergency Preparedness Exercise in Preparation for Y2K |
10/19/1999 |
III-99-44 |
NRC to Present Findings From Safety Team Inspections at Paducah and Portsmouth Gaseous Diffusion Plants |
10/19/1999 |
II-99-50 |
ASLB to Hear Limited Appearance Statements December 7 & 8 on CP&L Request to Increase Spent Fuel Storage at Harris |
10/18/1999 |
I-99-90 |
NRC to Meet with Niagara Mohawk to Discuss Performance at Nine Mile Point Nuclear Plants |
10/15/1999 |
99-219 |
NRC to Allow Duke Energy to Submit Early License Renewal Applications |
10/15/1999 |
I-99-89 |
NRC Issues Final Environmental Impact Statement Resulting from Calvert Cliffs License Renewal Review |
10/15/1999 |
99-218 |
NRC Schedules Second Meeting to Obtain Public Views on Revision of Fuel Facility Inspection Program |
10/14/1999 |
99-216 |
NRC Advisory Committee on Reactor Safeguards to Meet In Rockville, Maryland |
10/14/1999 |
99-217 |
Note to Editors: Meeting Rescheduled |
10/13/1999 |
I-99-88 |
NRC to Hold Meeting Regarding Sale of Land at Oyster Creek Site |
10/13/1999 |
IV-99-34 |
NRC Region IV Issues Mid-Cycle Plant Performance Review Results |
10/13/1999 |
III-99-43 |
NRC Region III Issues Mid-Cycle Nuclear Plant Performance Review Results |
10/13/1999 |
IV-99-35 |
NRC to Meet with Public in California to Discuss GE Vallecitos Nuclear Center |
10/13/1999 |
I-99-87 |
NRC Region I Issues Mid-Cycle Plant Performance Review Results |
10/12/1999 |
II-99-49 |
NRC Staff Issues Order to Roanoke Company |
10/08/1999 |
I-99-86 |
NRC to Hold October Workshop, Meeting in Connecticut on Reactor Decommissioning |
10/08/1999 |
99-215 |
Note to Editors: ACRS Meeting November 3, 1999 |
10/08/1999 |
99-214 |
NRC Will Study Japanese Accident for Possible Safety Enhancements |
10/06/1999 |
99-213 |
Note to Editors: NRC Advisory Committee on the Medical Uses of Isotopes Meeting on October 20, 1999 |
10/05/1999 |
99-212 |
27th Annual Water Reactor Safety Information Meeting to Be Held October 25-27 in Bethesda, Md. |
10/04/1999 |
99-211 |
NRC Considers Changes to Regulations for Reactor Safety Analysis Requirements |
10/01/1999 |
I-99-85 |
NRC Approves Transfer of Duquesne Light Co.'s Partial Ownership in Beaver Valley and Perry Nuclear Plants to FirstEnergy |
10/01/1999 |
99-210 |
Note to Editors: ACRS Meeting on October 22, 1999 |
10/01/1999 |
III-99-42 |
NRC Staff Issues Confirmatory Order to Nuclear Contractor on Employee Concerns Program and "Safety Conscious" Environment |
September 1999
|
09/28/1999 |
99-209 |
NRC Completes Final Plan for Evaluating Foreign Ownership, Control or Domination of Nuclear Power Plant License Applicants |
09/28/1999 |
99-208 |
NRC Advisory Committee on Nuclear Waste to Meet in Las Vegas |
09/28/1999 |
99-207 |
NRC Sends Letters to Utilities to Follow Up Y2k Readiness at Nuclear Power Plants |
09/27/1999 |
99-206 |
NRC and Utah Choose Dames & Moore as Trustee for Atlas Uranium Mill Tailings Pile |
09/27/1999 |
99-205 |
NRC to Hold Atlanta Meeting on Control of Solid Materials from Licensed Facilities |
09/27/1999 |
I-99-84 |
NRC Statement on Department of Justice Action Against Northeast Utilities |
09/27/1999 |
99-204 |
NRC Releases Previously Contaminated Site in Pennsylvania for Unrestricted Use |
09/23/1999 |
99-203 |
NRC Revises its Regulations for Making Changes to Licensed Facilities |
09/21/1999 |
I-99-83 |
NRC Sets New Date for Meeting on IP2 Inspection; Now Scheduled for September 27 |
09/21/1999 |
99-202 |
NRC Issues Final Revisions to Regulations on Respiratory Protection |
09/21/1999 |
99-201 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
09/20/1999 |
99-200 |
Note to Editors: ACRS Meeting Postponed |
09/17/1999 |
I-99-82 |
Note to Editors: NRC Reschedules Meeting on Indian Point 2 Inspection; Now Set for September 23 |
09/17/1999 |
99-199 |
NRC to Amend Regulations Revising Pacific Sierra VSC-24 Cask System on Approved List |
09/16/1999 |
I-99-81 |
NRC Reschedules Meeting on Indian Point 2 Inspection Findings |
09/16/1999 |
I-99-80 |
NRC Region I Monitors Hurricane Floyd |
09/15/1999 |
99-198 |
NRC Expands Regulations for Spent Fuel Storage Cask Certificates |
09/15/1999 |
II-99-48 |
NRC Continues to Monitor Hurricane Floyd |
09/15/1999 |
99-197 |
NRC Names New Special Assistant to the Director of Public Affairs |
09/15/1999 |
99-196 |
Note to Editors |
09/14/1999 |
II-99-47 |
NRC Monitors Hurricane Floyd |
09/14/1999 |
I-99-79 |
NRC Inspection Team to Report on Indian Point 2 Findings |
09/14/1999 |
99-195 |
Note to Editors: NRC Extends Date for Submitting Applications for Advisory Committee on Nuclear Waste |
09/13/1999 |
IV-99-33 |
Jeffrey Clark Assigned as NRC Senior Resident Inspector at Cooper |
09/13/1999 |
I-99-78 |
NRC Selects New Senior Resident Inspector at Indian Point 3 |
09/10/1999 |
I-99-77 |
NRC to Discuss Apparent Violations with Howard University Hospital |
09/09/1999 |
I-99-76 |
NRC to Receive Interim Results of Indian Point 2 Trip Review |
09/09/1999 |
99-194 |
NRC Names John D. Sieber to the Advisory Committee on Reactor Safeguards |
09/09/1999 |
99-193 |
NRC Seeks Public Input to Revise Safety Inspection Program for Fuel Cycle Facilities; Schedules Meeting |
09/08/1999 |
99-192 |
NRC to Hold San Francisco Meeting on Control of Solid Materials from Licensed Facilities |
09/08/1999 |
I-99-75 |
William Raymond Named NRC Senior Resident Inspector at Indian Point 2 Nuclear Power Plant |
09/07/1999 |
99-191 |
NRC Issues Report Confirming No Y2K Problems Affecting Safety Systems of Nuclear Power Plants - Updates Y2K Readiness Status |
09/07/1999 |
99-190 |
NRC Invites Public to Submit Nominations for Advisory Committee on Nuclear Waste |
09/07/1999 |
IV-99-32 |
Note to Editors: NRC Commissioner Nils Diaz Cancels Visit to Texas |
09/03/1999 |
99-189 |
NRC Amends Regulations to Add HI-STAR Fuel Storage Cask Design to Approved List |
09/03/1999 |
99-188 |
NRC Approves Ohio Agreement to Regulate Use of Certain Radioactive Materials |
09/03/1999 |
I-99-74 |
NRC Assigns New Resident Inspector to FitzPatrick Nuclear Plant |
09/02/1999 |
I-99-73 |
NRC Sends Inspection Team to Indian Point 2 Nuclear Power Plant |
09/02/1999 |
99-187 |
NRC to Meet with NEI to Discuss Nuclear Industry's Y2K Activities |
09/01/1999 |
99-186 |
Note to Editors: ACRS Meetings September 22-24 |
09/01/1999 |
99-185 |
NRC Releases Previously Contaminated Site in Ohio for Unrestricted Use |
August 1999
|
08/31/1999 |
99-184 |
NRC Staff to Meet with Public to Update Policies Related to the Release of Information |
08/30/1999 |
99-183 |
NRC Amends Environmental Reviews to Renew Nuclear Power Plant Operating Licenses to Include Consideration of Certain Transportation Impacts |
08/27/1999 |
99-182 |
Note to Editors: ACRS Meetings September 15-17 |
08/27/1999 |
99-175 |
NRC Denies Three Petitions from NIRS on Year 2000 Concerns |
08/26/1999 |
I-99-72 |
NRC Bans Former Executive of New Jersey Company from Licensed Activities for Three Years |
08/24/1999 |
I-99-71 |
NRC Staff to Hold Performance Review Meeting for Pilgrim Plant |
08/24/1999 |
I-99-70 |
NRC Proposes Second Fine Against Pennsylvania Man for Possessing Nuclear Gauges Without License |
08/23/1999 |
99-181 |
NRC Issues License Amendment to Kerr-McGee to Authorize Remediation of Cushing, Oklahoma, Site |
08/22/1999 |
IV-99-30 |
NRC Monitors Hurricane Bret |
08/20/1999 |
IV-99-29 |
Ellis Merschoff, NRC Regional Administrator, to Hold Press Conference in Richland |
08/19/1999 |
99-180 |
NRC Proposes to Amend Regulations to Add Three Fuel Storage Cask Designs to Approved List |
08/19/1999 |
99-179 |
NRC's Response to EPA's Issuance of Draft Dose Standard for Yucca Mountain |
08/18/1999 |
II-99-46 |
NRC Names New Senior Resident Inspector at Sequoyah Nuclear Power Plant |
08/18/1999 |
I-99-69 |
NRC to Discuss Decommissioning Plans for Millstone 1 Reactor at Public Meeting in Waterford, Conn., on August 25 |
08/13/1999 |
I-99-68 |
Changes in NRC Licensing Requirements for Operators to Be Discussed at Two-Day Workshop in Philadelphia |
08/13/1999 |
99-178 |
NRC Changes Regulations for Renewing or Amending USEC Certificates |
08/13/1999 |
99-177 |
Note to Editors: Meeting Time Change |
08/13/1999 |
99-176 |
NRC Proposes Eliminating Non-Combustibility Requirement for Fire Barrier Penetration Seals at Nuclear Plants |
08/11/1999 |
I-99-67 |
NRC Appoints New Senior Resident Inspector at Salem Nuclear Plant |
08/10/1999 |
99-174 |
Pilot Program Evaluation Panel to Meet in Rockville, Maryland |
08/10/1999 |
99-173 |
NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland |
08/10/1999 |
99-172 |
NRC Begins Review of DOE's Draft Environmental Statement on Yucca Mountain Waste Repository |
08/09/1999 |
99-171 |
Bill Borchardt Named Director of the NRC's Office of Enforcement |
08/09/1999 |
99-170 |
NRC Grants GPU Nuclear's Request to Reduce Insurance Coverage for Shut-Down Three Mile Island Unit 2 |
08/09/1999 |
99-169 |
Note to Editors: ACRS Meeting on August 31 in Rockville, Maryland |
08/06/1999 |
99-168 |
NRC Establishes Policy for Regulatory Actions for Nuclear Power Plants That Are Not "Y2K Ready" |
08/06/1999 |
99-167 |
NRC to Hold Public Workshop on Reactor Safety Chapter of its Strategic Plan on August 20 |
08/06/1999 |
99-166 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
08/05/1999 |
I-99-66 |
NRC Staff to Hold Performance Review Meeting for Peach Bottom Plant |
08/04/1999 |
I-99-65 |
Haddam Neck Decommissioning Activities to Be Discussed Aug. 11 |
08/04/1999 |
99-164 |
NRC Posts Nuclear Power Plant Performance Data on Internet Website; Seeks Public Comment on Pilot Plant Program |
08/03/1999 |
I-99-64 |
NRC Proposes $55,000 Fine for Operator of Seabrook Plant for Violation Involving Discrimination; Contractor, Foreman Cited |
08/03/1999 |
II-99-45 |
NRC Staff to Conduct Licensee Performance Review with General Electric Nuclear Fuel Plant at Wilmington on August 6 |
July 1999
|
07/28/1999 |
99-162 |
NRC Considers Changes to Regulations for Special Nuclear Material Licensees |
07/28/1999 |
99-161 |
Note to Editors: ACRS Reports |
07/28/1999 |
99-160 |
NRC Proposes to Amend Requirements for One Spent Fuel Storage Cask Design |
07/27/1999 |
99-159 |
NRC Competes Review of Millstone Public Petition |
07/26/1999 |
99-158 |
Note to Editors: ACRS Meeting August 9-10 |
07/26/1999 |
99-157 |
Note to Editors: Meeting August 4-5 Postponed |
07/23/1999 |
99-156 |
NRC to Begin Implementing Revised Sunshine Act Rules |
07/23/1999 |
99-155 |
NRC Advisory Committee on Nuclear Waste Re-Elects Chairman, Vice-Chairman |
07/22/1999 |
99-154 |
NRC Proposes Additional Requirements for Certain Devices Containing Radioactive Material |
07/22/1999 |
99-153 |
NRC Issues Interim Enforcement Policy on Y2K |
07/21/1999 |
III-99-41 |
NRC Staff to Meet with Consumers Energy July 28 to Review Findings on Spent Fuel Storage Activities at Palisades |
07/20/1999 |
I-99-62 |
NRC Staff to Hold Performance Review Meeting at Indian Point 3 |
07/20/1999 |
99-152 |
NRC Finds 89 Nuclear Power Plants Implementing Y2K Programs Consistent with Guidance; 14 Plants Require NRC Follow-Up |
07/20/1999 |
99-151 |
Task Force Report Says NRC Regulatory Structure Adequate for Oversight at 3 DOE Pilot Project Sites |
07/16/1999 |
99-149 |
Commission Directs NRC Staff to Prepare a New Rule Upgrading Security Requirements at Nuclear Power Plants |
07/16/1999 |
99-148 |
NRC to Require Nuclear Power Plants to Assess And Manage Increases in Plant Risk Before Performing Maintenance |
07/15/1999 |
99-150 |
NRC Hosted Tabletop Exercise in Preparation for Y2K |
07/15/1999 |
I-99-61 |
NRC Proposes $2,750 Fine Against Pennsylvania Firm for Gauge-Use Violations |
07/13/1999 |
III-99-40 |
NRC Staff Proposes $5,500 Fine Against Testing Engineers & Consultants, Inc. for Violations of NRC Safety Requirements |
07/13/1999 |
99-147 |
Note to Editors: Licensing Board Ruling in Shearon Harris Case |
07/13/1999 |
99-146 |
Pilot Program Evaluation Panel to Meet in Rockville, Maryland |
07/13/1999 |
99-145 |
NRC to Hold Workshop This Week in Maryland on Spent Fuel Pools at Closed Nuclear Power Plants |
07/12/1999 |
II-99-44 |
NRC to Hold Performance Evaluation Meeting At Brunswick |
07/12/1999 |
II-99-43 |
NRC Staff Sets Enforcement Conference with Duke Energy to Discuss Apparent Violations at Catawba Nuclear Station |
07/12/1999 |
99-144 |
NRC Order to Florida Power & Light Co. Confirms Fire Barrier Corrective Actions at Turkey Point Units 3 and 4 |
07/12/1999 |
99-143 |
Note to Editors: Demand for Information Owner of Envirocare of Utah |
07/09/1999 |
I-99-60 |
NRC to Hold 2 Meetings on July 15 Regarding Millstone Plant |
07/09/1999 |
99-142 |
NRC Posts Advance Copies of Publicly Available Documents on Web Page |
07/09/1999 |
99-141 |
NRC Establishes Panel to Evaluate Pilot Program for New Oversight Process |
07/08/1999 |
II-99-41 |
NRC Staff to Hold Performance Evaluation Meeting at McGuire |
07/08/1999 |
III-99-39 |
NRC Staff to Meet with Alliant Utilities Officials to Discuss Performance at Duane Arnold Nuclear Plant |
07/08/1999 |
I-99-59 |
NRC Staff to Hold Performance Evaluation Meeting at Susquehanna; Regional Administrator to Hold Media Briefing |
07/07/1999 |
II-99-40 |
NRC Staff Schedules Public Meeting in Raleigh on July 13 to Describe New Inspection and Assessment Program |
07/07/1999 |
99-139 |
NRC Proposes Changes to Reporting Requirements for Nuclear Power Plants |
07/07/1999 |
99-138 |
Nuclear Power Plants Report Safety Systems Are Y2K Ready |
07/06/1999 |
99-137 |
NRC Announces Improvements to Public Petition Process |
07/06/1999 |
99-136 |
G. Paul Bollwerk Named Chief Administrative Judge of Atomic Safety & Licensing Board Panel |
07/01/1999 |
99-135 |
Chairman Dicus Assumes Duties as Head of NRC |
June 1999
|
06/30/1999 |
III-99-38 |
NRC Staff Proposes $55,000 Fine Against U.S. Enrichment Corp. for Failing to Declare "Alert" During Portsmouth Plant Fire |
06/29/1999 |
99-134 |
NRC Staff to Meet with Public to Discuss Policies Related to the Release of Information |
06/29/1999 |
IV-99-27 |
NRC Proposes $8,800 Fine for Anvil Corp. |
06/28/1999 |
IV-99-28 |
Russell L. Bywater, Jr. Assigned Senior Resident Inspector at Arkansas Nuclear |
06/28/1999 |
99-133 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
06/28/1999 |
I-99-58 |
Note to Editors: Meeting Location and Time Changed |
06/24/1999 |
I-99-57 |
NRC Staff Schedules Public Meeting for June 30 to Describe Agency's New Inspection Program for FitzPatrick Nuclear Plant |
06/24/1999 |
II-99-39 |
NRC to Discuss Draft Environmental Impact Statement for Oconee Nuclear Station License Renewal at Local Public Meeting |
06/24/1999 |
II-99-38 |
NRC Staff Sets Enforcement Conference with Duke Energy to Discuss Apparent Violation at Catawba Nuclear Station |
06/24/1999 |
99-132 |
NRC Seeks Public Comments on Issues Related to Release of Solid Materials from Licensed Facilities |
06/23/1999 |
99-131 |
NRC to Allow "Enforcement Discretion" in Some Industrial Radiographer Certification Cases |
06/23/1999 |
99-130 |
Note to Editors: ACRS Meetings June 2-4 |
06/23/1999 |
I-99-56 |
NRC Schedules Public Meeting for June 29 to Describe Agency's New Inspection Program for Salem/Hope Creek Nuclear Plants |
06/23/1999 |
II-99-37 |
NRC Schedules Public Meeting in Chattanooga June 28 to Describe New Inspection and Assessment Program |
06/23/1999 |
99-129 |
NRC Reviews Department of Energy Viability Assessment for Yucca Mountain, Nevada, Disposal Site |
06/21/1999 |
99-128 |
NRC Takes Actions on "Orphan" Radioactive Sources |
06/18/1999 |
I-99-55 |
NRC Fines Materials Testing Laboratory $2,750 for Deliberate Violations of NRC Requirements |
06/18/1999 |
99-127 |
Note to Editors: ACRS Meetings on July 13 |
06/16/1999 |
IV-99-26 |
NRC Regional Administrator to Meet with Media |
06/16/1999 |
IV-99-25 |
NRC to Hold Public Meeting to Describe New NRC Inspection Program for Cooper Nuclear Station |
06/15/1999 |
99-126 |
Comment Period Opens on Proposed Potassium Iodide Rule |
06/15/1999 |
99-125 |
Note to Editors: ACRS Reports Received |
06/14/1999 |
99-124 |
NRC Advisory Committee on Reactor Safeguards Subcommittee to Meet July 13 |
06/14/1999 |
99-123 |
NRC Plans for Y2K Contingencies |
06/14/1999 |
99-122 |
NRC to Meet with Nuclear Energy Institute on Y2K Issue on June 15 |
06/14/1999 |
II-99-35 |
NRC to Hold Performance Evaluation Meeting at Oconee |
06/14/1999 |
II-99-34 |
NRC to Hold Performance Evaluation Meeting at Catawba |
06/11/1999 |
IV-99-24 |
NRC to Hold Public Meeting to Describe New NRC Inspection Program for Fort Calhoun |
06/09/1999 |
99-121 |
NRC Considers Amending License for Pennsylvania Facility; Offers Opportunity for Hearing |
06/08/1999 |
III-99-37 |
NRC Staff to Meet with Commonwealth Edison Officials to Discuss Performance at Dresden Nuclear Power Plant |
06/07/1999 |
99-120 |
NRC Approves Transfer of License for Colorado Spent Fuel Storage Facility to DOE |
06/07/1999 |
99-119 |
NRC Invites Public to Submit Nominations for the Advisory Committee on Reactor Safeguards |
06/07/1999 |
99-118 |
NRC Amends Licensing, Inspections and Annual Fees |
06/07/1999 |
99-117 |
Nuclear Regulatory Commission Honors Employees |
06/04/1999 |
I-99-54 |
NRC Proposes $5,500 Fine for Pennsylvania Man for Violation Involving Possession and Use of Nuclear Gauges |
06/04/1999 |
I-99-53 |
NRC Proposes $4,400 Fine Against New Jersey Medical Facility for Firing Employee Who Raised Safety Concern |
06/04/1999 |
III-99-36 |
NRC Staff Schedules Public Meeting June 14 to Describe New NRC Inspection Program for Prairie Island Nuclear Station |
06/04/1999 |
99-116 |
NRC Advisory Committee on Nuclear Waste to Meet in San Antonio, Texas |
06/02/1999 |
I-99-51 |
NRC Staff to Hold Performance Evaluation Meeting at Limerick |
06/03/1999 |
I-99-52 |
NRC Commissioner Merrifield to Hold Press Briefing at Seabrook |
06/03/1999 |
III-99-35 |
NRC Staff to Hold Predecisional Enforcement Conference on Response to Fire at Portsmouth Uranium Enrichment Plant |
06/02/1999 |
99-115 |
NRC Makes Available Staff Recommendations for Proposed Rule on Certain Uranium and Plutonium Facilities |
06/01/1999 |
III-99-34 |
NRC Staff to Meet With FirstEnergy Officials to Discuss Performance at Davis-Besse Nuclear Plant |
06/01/1999 |
99-114 |
NRC Headquarters Temporarily Closed Because of Bomb Threat |
May 1999
|
05/28/1999 |
99-113 |
NRC Issues License Amendment Approving Stabilization Plan for Atlas Uranium Mill Tailings Pile in Utah |
05/28/1999 |
I-99-50 |
NRC Staff to Hold Performance Evaluation Meeting at FitzPatrick |
05/28/1999 |
III-99-33 |
NRC Staff Schedules Public Meetings June 8 to Describe New NRC Inspection Program for Quad Cities Nuclear Power Station |
05/27/1999 |
99-112 |
Note to Editors: ACRS Meeting June 30 - July 1 |
05/27/1999 |
99-111 |
NRC Invites Public to Submit Nominations for Advisory Committee on Reactor Safeguards |
05/26/1999 |
99-110 |
NRC Amends Regulations to Expand Opportunities for Participation by Indian Tribal Governments in NRC Hearings |
05/26/1999 |
99-109 |
NRC Completes Evaluation of Department of Energy Report on Tritium Production |
05/25/1999 |
IV-99-23 |
NRC Withdraws $110,000 Fine Against Entergy's Waterford 3 Nuclear Power Plant |
05/25/1999 |
IV-99-22 |
NRC to Meet with Fansteel Inc. on Reprocessing Residual Material at Muskogee Plant |
05/25/1999 |
II-99-32 |
NRC Staff to Hold Performance Evaluation Meeting at Vogtle |
05/25/1999 |
II-99-31 |
NRC Team Finds Duke 'Scoping and Screening' Process Appropriate for Oconee License Renewal; Meeting Scheduled |
05/25/1999 |
I-99-49 |
NRC Staff Cites Northeast Nuclear Energy Company for Spent Fuel Pool Violations at Millstone 1 |
05/25/1999 |
III-99-32 |
NRC Staff to Present Review of Utility's Readiness to Load Additional Spent Fuel Casks at Palisades Nuclear Plant |
05/24/1999 |
III-99-31 |
NRC Staff Proposes $110,000 Fine Against FirstEnergy for Discrimination Against Perry Employee |
05/24/1999 |
99-108 |
NRC to Hold Three Additional Public Meetings in Nevada on Proposed Regulations for Yucca Mountain |
05/24/1999 |
99-107 |
NRC Staff Tentatively Finds Oconee License Renewal Environmentally Acceptable; Open for Comment |
05/24/1999 |
99-106 |
Note to Editors: NRC Received Three Reports From its Advisory Committee on Reactor Safeguards |
05/21/1999 |
99-105 |
Galante, Chief Information Officer, to Retire; Reiter Hired as Deputy |
05/21/1999 |
99-104 |
Note to Editors: NRC Has Received Four Reports from its Advisory Committee on Reactor Safeguards |
05/20/1999 |
99-103 |
NRC Chairman Jackson Receives Honors from Seven Academic Institutes |
05/19/1999 |
III-99-30 |
NRC Staff to Meet with Commonwealth Edison Officials to Discuss Performance at Braidwood Nuclear Plant |
05/18/1999 |
99-102 |
Note to Editors: ACRS Meetings at Two Separate Locations |
05/17/1999 |
99-101 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
05/14/1999 |
99-100 |
NRC Proposes to Certify Westinghouse Electric Company's AP600 Reactor Design |
05/13/1999 |
99-99 |
NRC to Hold Workshop May 17-20 near Philadelphia on New Oversight Processes for Nuclear Power Plants |
05/11/1999 |
99-98 |
Prehearing Conference Scheduled on Shearon Harris Plant License Amendment |
05/12/1999 |
99-97 |
Note to Editors: Public Comment on Sunshine Act Rule |
05/06/1999 |
IV-99-21 |
NRC Proposes $17,600 Fine for International Radiography and Inspection Services, Inc. |
05/06/1999 |
99-96 |
NRC to Make Public Records Available Electronically, Change Public Document Room Program |
05/06/1999 |
99-95 |
Senior Managers Review Nuclear Power Plant Performance |
05/04/1999 |
99-94 |
NRC Orders Payment of $900,000 Fine from Thermal Science for Violations of NRC Requirements |
05/03/1999 |
99-93 |
NRC Approves Transfer of Pilgrim Plant Operating License from Boston Edison to Entergy Nuclear |
05/03/1999 |
99-92 |
Prehearing Conference Scheduled on Shearon Harris Plant License Amendment |
April 1999
|
04/30/1999 |
II-99-30 |
NRC Staff to Hold Performance Evaluation Meeting at Robinson |
04/30/1999 |
99-91 |
Note to Editors: ACRS Reports Received |
04/30/1999 |
99-90 |
NRC Extends Public Comment Period for Regulations Licensing Proposed Radioactive Waste Repository in Nevada |
04/29/1999 |
99-89 |
Note to Editors: ACRS to Meet on May 26 and 27 |
04/29/1999 |
99-88 |
NRC Authorizes Northeast Utilities to Begin Restart of Millstone Unit 2 |
04/28/1999 |
99-87 |
Nuclear Power Plants on Track for Achieving Y2K Compliance by July 1 |
04/27/1999 |
III-99-29 |
NRC Staff Finds Improvements at Clinton Nuclear Power Plant Sufficient for Resumption of Operation |
04/27/1999 |
III-99-28 |
NRC Staff to Meet with Wisconsin Public Service Officials to Discuss Performance at Kewaunee Nuclear Plant |
04/26/1999 |
99-86 |
Note to Editors: ACRS Reports |
04/23/1999 |
99-85 |
NRC Proposes Revisions to its Regulations on Use of Potassium Iodide in Emergency Response |
04/23/1999 |
III-99-27 |
NRC Staff to Meet with Consumers Energy Officials to Discuss Performance at Palisades Nuclear Plant |
04/21/1999 |
99-84 |
Note to Editors |
04/21/1999 |
99-83 |
NRC Advisory Committee on Nuclear Waste to Meet in Rockville, Maryland |
04/20/1999 |
I-99-48 |
NRC, GPU Nuclear to Discuss Apparent Violation at TMI 1 |
04/20/1999 |
99-82 |
NRC Schedules Public Workshop on Methods to Assess Risk of Low Power and Shutdown Operations at Nuclear Power Plants |
04/20/1999 |
99-81 |
NRC Public Document Room to Be Closed During NATO Summit April 23 |
04/20/1999 |
99-80 |
Commission Publishes Final Rule for Expanded Utility Role in Testing Reactor Operator License Candidates |
04/20/1999 |
II-99-29 |
NRC Staff Sets Enforcement Conference with Alabama Company to Discuss Apparent Violation of NRC Regulations |
04/19/1999 |
99-79 |
Note to Editors: Joint Working Group of ACRS and ACNW on May 11 |
04/19/1999 |
II-99-28 |
NRC Staff to Hold Performance Evaluation Meeting at Hatch |
04/16/1999 |
I-99-47 |
Note to Editors: Meeting with Northeast Utilities on April 20 |
04/16/1999 |
99-78 |
NRC Proposes Changes to Regulations on Well Logging |
04/16/1999 |
99-77 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
04/15/1999 |
I-99-46 |
NRC Issues Performance Review for Susquehanna Nuclear Plant |
04/15/1999 |
I-99-45 |
NRC Issues Latest Performance Assessment of Indian Point 2 |
04/15/1999 |
I-99-44 |
NRC Issues Latest Performance Review for Indian Point 3 |
04/14/1999 |
99-76 |
Note to Editors: ACRS Meeting on May 4 and 5 |
04/14/1999 |
I-99-43 |
NRC Issues Performance Review for Oyster Creek Nuclear Plant |
04/14/1999 |
I-99-42 |
NRC Issues Performance Review for Calvert Cliffs |
04/14/1999 |
I-99-41 |
NRC Staff Issues Performance Review for Three Mile Island 1 Plant |
04/14/1999 |
I-99-40 |
NRC Staff Issues Latest Assessment of Performance at Ginna |
04/14/1999 |
I-99-39 |
NRC Issues Performance Review for Seabrook Nuclear Power Plant |
04/13/1999 |
I-99-38 |
NRC Issues Performance Review for Pilgrim Nuclear Power Plant |
04/13/1999 |
I-99-37 |
NRC Issues Performance Review for Peach Bottom Nuclear Plant |
04/13/1999 |
I-99-36 |
NRC Issues Latest Performance Assessment of Limerick |
04/13/1999 |
I-99-35 |
NRC Issues Latest Assessment of Performance at Nine Mile Point |
04/13/1999 |
I-99-34 |
NRC Issues Latest Assessment of Performance at FitzPatrick |
04/13/1999 |
I-99-33 |
NRC Issues Performance Review for Millstone Nuclear Plant |
04/13/1999 |
III-99-26 |
NRC Names New Resident Inspector at Kewaunee Nuclear Power Plant |
04/13/1999 |
99-75 |
NRC Approves Transfer of Three Mile Island Plant Operating License to AmerGen Energy Co. |
04/12/1999 |
I-99-32 |
NRC Issues Latest Assessment of Performance at Hope Creek |
04/12/1999 |
I-99-31 |
NRC Issues Performance Review for Salem Nuclear Power Plant |
04/12/1999 |
I-99-30 |
NRC Issues Performance Review for Vermont Yankee Nuclear Plant |
04/12/1999 |
I-99-29 |
NRC Issues Latest Performance Review of Beaver Valley Power Station |
04/12/1999 |
I-99-28 |
NRC Staff Releases Findings of First License Renewal Inspection at Calvert Cliffs; Schedules Public Meeting |
04/12/1999 |
99-74 |
NRC Expands its Website to Include 1999 Initiatives, and "Students'/Teachers' Corner" |
04/12/1999 |
99-73 |
NRC to Hold Second Set of Meetings on Application for Temporary Spent Fuel Storage Facility |
04/08/1999 |
IV-99-20 |
NRC Finds Performance 'Acceptable' at Diablo Canyon in Latest Review |
04/08/1999 |
IV-99-19 |
NRC Finds Performance 'Acceptable' at River Bend in Latest Review |
04/08/1999 |
IV-99-18 |
NRC Finds Performance 'Acceptable' at San Onofre in Latest Review |
04/09/1999 |
99-72 |
Note to Editors: Meeting Scheduled on May 5 |
04/09/1999 |
99-71 |
NRC Plans Public Meeting on Performance-Based Approaches to Regulation |
04/08/1999 |
I-99-27 |
NRC Chairman Shirley Ann Jackson to Hold News Briefing Following Visit to Salem Nuclear Generating Station |
04/08/1999 |
99-70 |
NRC Issues Cleanup Criteria for Uranium Mills |
04/08/1999 |
99-69 |
NRC Deletes Reporting Requirement on Loading of Spent Fuel Storage Installations |
04/07/1999 |
99-68 |
NRC Approves B&W's Request to Dismantle Building at Pennsylvania Site |
04/06/1999 |
III-99-25 |
NRC Finds D.C. Cook "Committed to Aggressively Evaluating" its Problems in Latest Review of Nuclear Plant Performance |
04/06/1999 |
III-99-24 |
NRC Finds Performance 'Acceptable' at Point Beach Nuclear Plant in Latest Review |
04/06/1999 |
99-67 |
NRC to Hold Public Meeting in Washington, Pennsylvania, on Molycorp Proposal |
04/06/1999 |
I-99-26 |
NRC Issues Notice of Violation to Haddam Neck Plant Operator |
04/06/1999 |
I-99-25 |
NRC Announces Enforcement Actions for Discrimination at Millstone Based on Independent Review |
04/05/1999 |
IV-99-17 |
NRC Finds Performance 'Acceptable' at Grand Gulf in Latest Review |
04/05/1999 |
IV-99-16 |
NRC Finds Performance 'Acceptable' at Fort Calhoun in Latest Review |
04/05/1999 |
III-99-23 |
NRC Finds "Steady Progress" in Work Leading to Restart at Clinton Nuclear Plant in Latest Review |
04/05/1999 |
III-99-22 |
NRC Finds Performance 'Acceptable' at Fermi Nuclear Plant in Latest Review |
04/05/1999 |
III-99-21 |
NRC Finds Performance 'Acceptable' at Palisades Nuclear Plant in Latest Review |
04/05/1999 |
III-99-20 |
NRC Finds Performance 'Acceptable' at Kewaunee Nuclear Plant in Latest Review |
04/05/1999 |
II-99-26 |
NRC Finds Performance 'Acceptable' at McGuire in Latest Review |
04/05/1999 |
II-99-25 |
NRC Finds Performance 'Acceptable' in Latest Review of Catawba |
04/05/1999 |
II-99-24 |
NRC Finds Performance 'Acceptable' at Surry in Latest Review |
04/05/1999 |
II-99-23 |
NRC Finds Performance 'Acceptable' at North Anna in Latest Review |
04/05/1999 |
99-66 |
Note to Editors: ACRS Meetings Scheduled |
04/02/1999 |
III-99-19 |
NRC Finds Performance 'Acceptable' at Quad Cities Nuclear Power Station in Latest Review |
04/02/1999 |
II-99-22 |
NRC Finds Performance 'Acceptable' at Vogtle in Latest Review |
04/02/1999 |
II-99-21 |
NRC Finds Performance 'Acceptable' at Hatch in Latest Review |
04/02/1999 |
II-99-20 |
NRC Finds Performance 'Acceptable' at Farley in Latest Review |
04/02/1999 |
II-99-19 |
NRC Finds Performance 'Acceptable' at Summer in Latest Review |
04/02/1999 |
II-99-18 |
NRC Finds Performance 'Acceptable' at Browns Ferry in Latest Review |
04/02/1999 |
II-99-17 |
NRC Finds Performance 'Acceptable' in Latest Review of Sequoyah |
04/02/1999 |
II-99-16 |
NRC Finds Performance 'Acceptable' in Latest Review at Watts Bar |
04/02/1999 |
99-65 |
NRC Employees Win Hammer Awards from Vice President Gore |
04/01/1999 |
I-99-24 |
Note to Editors: NRC Staff Will Meet |
04/01/1999 |
IV-99-15 |
NRC Finds Performance 'Acceptable' at Arkansas Nuclear One in Latest Review |
04/01/1999 |
IV-99-14 |
NRC Finds Performance 'Acceptable' at Waterford in Latest Review |
04/01/1999 |
IV-99-13 |
NRC Finds Performance 'Acceptable' at Palo Verde in Latest Review |
04/01/1999 |
III-99-18 |
NRC Finds Performance 'Acceptable' at Braidwood Nuclear Power Station in Latest Review |
04/01/1999 |
III-99-17 |
NRC Finds Performance 'Acceptable' at Dresden Nuclear Power Station in Latest Review |
04/01/1999 |
III-99-16 |
NRC Finds Performance 'Acceptable' at Byron Nuclear Power Plant in Latest Review |
04/01/1999 |
II-99-15 |
NRC Finds Performance 'Acceptable' at Turkey Point in Latest Review |
04/01/1999 |
II-99-14 |
NRC Finds Performance 'Acceptable' at St. Lucie in Latest Review |
04/01/1999 |
II-99-13 |
NRC Finds Performance 'Acceptable' at Crystal River in Latest Review |
04/01/1999 |
II-99-12 |
NRC Finds Performance 'Acceptable' At Robinson In Latest Review |
04/01/1999 |
II-99-11 |
NRC Finds Performance 'Acceptable' at Brunswick in Latest Review |
04/01/1999 |
II-99-10 |
NRC Finds Performance 'Acceptable' at Harris in Latest Review |
04/01/1999 |
II-99-09 |
NRC Staff Issues Order to Puerto Rico Company Prohibiting Involvement in NRC-Licensed Activities |
04/01/1999 |
99-64 |
NRC Issues License to Portland General Electric for Storage of Trojan Fuel in Independent Storage Installation |
04/01/1999 |
I-99-23 |
NRC Proposes $5,500 Fine for Washington, D.C., Hospital for Temporary Loss of Nuclear-Powered Pacemaker |
March 1999
|
03/30/1999 |
III-99-15 |
NRC Finds Performance 'Acceptable' at LaSalle Nuclear Station in Latest Review |
03/30/1999 |
III-99-14 |
NRC Finds Performance 'Acceptable' at Davis-Besse Nuclear Plant in Latest Review |
03/30/1999 |
III-99-13 |
NRC Finds Performance 'Acceptable' at Perry Nuclear Plant in Latest Review |
03/30/1999 |
III-99-12 |
NRC Finds Performance 'Acceptable' at Prairie Island Nuclear Power Plant in Latest Review |
03/30/1999 |
III-99-11 |
NRC Finds Performance 'Acceptable' at Monticello Nuclear Power Plant in Latest Review |
03/30/1999 |
III-99-10 |
NRC Finds Performance 'Acceptable' at Duane Arnold Nuclear Power Plant in Latest Review |
03/30/1999 |
I-99-22 |
NRC to Hold Public Meetings on Draft Environmental Impact Statement for Calvert Cliffs License Renewal Application |
03/30/1999 |
99-63 |
Note to Editors: ACRS Reports Received |
03/29/1999 |
IV-99-11 |
NRC Finds Performance "Acceptable" at WNP-2 in Latest Review |
03/29/1999 |
99-61 |
NRC Seeks Comment on Proposal to Amend Licensing, Inspection and Annual Fees |
03/29/1999 |
99-62 |
Arthur Andersen Consultants Assess NRC Planning, Budgeting, and Performance Management Process |
03/26/1999 |
IV-99-12 |
NRC Finds Performance 'Acceptable' at Callaway in Latest Review |
03/25/1999 |
IV-99-10 |
NRC Finds Performance 'Acceptable' at Cooper Nuclear Station in Latest Review |
03/25/1999 |
IV-99-09 |
NRC Finds Performance 'Acceptable' at Comanche Peak in Latest Review |
03/25/1999 |
I-99-21 |
GPU to Update NRC on Oyster Creek Decommissioning Planning |
03/25/1999 |
99-60 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
03/24/1999 |
IV-99-06 |
John Hanna Assigned Resident Inspector for NRC at Callaway |
03/23/1999 |
III-99-09 |
NRC Staff to Meet March 25 with Illinois Power Co. Officials on Restart Activities at Clinton Nuclear Plant |
03/23/1999 |
99-59 |
NRC Amends B&W License for Parks Township Disposal Area |
03/23/1999 |
99-57 |
NRC to Review Y2K Programs at All 103 Operating Nuclear Plants and Conduct Special Contingency Plan Audits at Six Plants |
03/22/1999 |
I-99-20 |
NRC Commissioner Merrifield to Hold Press Briefing at TMI |
03/22/1999 |
IV-99-08 |
South Texas Project Performance Remains Acceptable in NRC's Latest Plant Review |
03/22/1999 |
IV-99-07 |
Wolf Creek Performance Remains Acceptable in NRC's Latest Plant Review |
03/19/1999 |
99-56 |
NRC Issues License to DOE for Storage of TMI-2 Fuel in Idaho |
03/19/1999 |
III-99-08 |
NRC, Wisconsin Electric to Meet to Discuss Apparent Violation at Point Beach Nuclear Plant |
03/19/1999 |
99-55 |
Note to Editors: ACRS Meetings Scheduled |
03/18/1999 |
99-54 |
NRC Seeks Comment on Performance-Based Regulatory Oversight Report |
03/17/1999 |
II-99-08 |
Radioactive Material Removed from Site in Puerto Rico |
03/17/1999 |
99-53 |
NRC Receives Two Awards for Procurement Reform Efforts |
03/17/1999 |
99-52 |
NRC Issues Draft Guidance for Reviewing Future License Application for Hanford Tank Waste Remediation |
03/16/1999 |
99-51 |
Commission Publishes 'White Paper' Report on Risk-Informed, Performance-Based Regulation |
03/16/1999 |
99-50 |
NRC Issues Draft Plan for Reviewing Future License Application for Enrichment Facility |
03/12/1999 |
I-99-19 |
Note to Editors: Meeting on March 18 on Millstone Station |
03/12/1999 |
99-49 |
NRC Issues Final Environmental Statement on Uranium Mill Tailings Pile in Utah |
03/11/1999 |
99-48 |
NRC Lifts Order Requiring Independent Oversight of Employee Concerns Program at Millstone Nuclear Power Plants |
03/11/1999 |
99-47 |
Proposed NRC Rule Would Permit Nuclear Power Plants to Change Accident Analyses of Public Radiation Dose |
03/11/1999 |
III-99-07 |
NRC Staff Proposes $2,500 Fine Against Bemidji, MN, Firm for Violations of NRC Safety Requirements |
03/10/1999 |
99-46 |
NRC Considering Request by Ohio to Be an 'Agreement State' |
03/09/1999 |
I-99-18 |
NRC Staff Proposes $88,000 Fine Against Northeast Nuclear for Discriminatory Action Against Two Employees at Millstone |
03/08/1999 |
II-99-27 |
NRC Finds Performance 'Acceptable, Areas Needing Improvement in Latest Review of Oconee |
03/04/1999 |
I-99-17 |
NRC, Haddam Neck Staff to Discuss Plant Decommissioning Work |
03/04/1999 |
99-45 |
NRC to Hold Public Meetings in Nevada on Proposed Regulations for Yucca Mountain |
03/04/1999 |
99-44 |
Note to Editors: Advisory Committee on Nuclear Waste |
03/03/1999 |
99-43 |
Note to Editors: Advisory Committee on Nuclear Waste |
03/03/1999 |
99-42 |
Note to Editors: Advisory Committee on Nuclear Waste |
03/03/1999 |
99-41 |
Note to Editors: Advisory Committee on Nuclear Waste |
03/03/1999 |
99-40 |
Note to Editors: Advisory Committee on the Medical Uses of Isotopes |
03/01/1999 |
99-39 |
Commission Moves to Revise Rules Governing Private Versus Public Meetings |
February 1999
|
02/26/1999 |
I-99-16 |
NRC Bans Former Temple University Technologist from NRC Licensed Activities for One Year |
02/26/1999 |
I-99-15 |
NRC Bars Connecticut Nuclear Medicine Technologist From Licensed Activities for One Year |
02/26/1999 |
99-38 |
NRC Issues Draft Environmental Supplement on Renewal of Calvert Cliffs Operating Licenses |
02/26/1999 |
99-37 |
Note to Editors: ACRS Meeting Scheduled March 9 |
02/26/1999 |
99-36 |
NRC Staff Proposes New Plan for Evaluating Foreign Ownership, Control or Domination of Nuclear Power Plant License Applicants |
02/26/1999 |
99-34 |
NRC Proposes Changes for Environmental Reviews for Operating License Renewal Applications |
02/23/1999 |
99-35 |
NRC Safety Assessment of Brookhaven National Laboratory High Flux Beam Reactor Finds No Safety Significant Issues |
02/23/1999 |
99-33 |
NRC Names Dr. Mario V. Bonaca to Advisory Committee on Reactor Safeguards |
02/22/1999 |
99-32 |
NRC Proposes Changes to Regulations for Licensing Proposed Radioactive Waste Repository in Nevada |
02/22/1999 |
99-31 |
NRC Selects Nuclear Power Plants at Eight Sites as Pilots for New Inspection, Assessment and Enforcement Processes |
02/22/1999 |
99-30 |
NRC Advisory Committee on Reactor Safeguards to Meet in Rockville, Maryland |
02/18/1999 |
99-29 |
NRC Amends Quality Assurance Regulations for Nuclear Power Plant Licensees |
02/17/1999 |
IV-99-04 |
NRC to Discuss Latest SONGS Unit 1 Decommissioning Plans with Public |
02/16/1999 |
I-99-14 |
Note to Editors: Meeting with Northeast Utilities on February 17 |
02/16/1999 |
99-28 |
NRC Adds a Third Video Conference Site on Hearing Concerning River Bend, Perry Nuclear Power Plants |
02/12/1999 |
99-27 |
NRC Takes Issue with Defense Nuclear Facilities Safety Board Report |
02/12/1999 |
99-26 |
Note to Editors: Review Panel Members Named |
02/12/1999 |
II-99-07 |
NRC Asks for Comments on Decommissioning of Georgia Tech Research Reactor |
02/10/1999 |
99-25 |
Note to Editors: ACNW Reports Received |
02/09/1999 |
99-24 |
NRC to Hold Informal Public Hearing on Petitions Concerning River Bend, Perry Nuclear Power Plants |
02/08/1999 |
I-99-13 |
NRC Issues Confirmatory Order to Special Testing Laboratories, Allowing Resumption of Licensed Activities |
02/08/1999 |
I-99-12 |
NRC Commissioners Dicus and Merrifield to Visit Millstone on February 12 |
02/08/1999 |
99-23 |
NRC Completes Work on Preparing its Internal Computer Systems for Year 2000 Readiness |
02/05/1999 |
99-22 |
Meetings Set for March 1-5 in Tempe, Arizona, to Develop Guidance Concerning Use of Potassium Iodide |
02/05/1999 |
99-21 |
NRC to Hold Briefing on Year 2000 Issues |
02/04/1999 |
99-20 |
NRC Amends Enforcement Policy to Expand Use of Non-Cited Violations at Nuclear Power Plants |
02/02/1999 |
I-99-11 |
Meeting Between NRC, Washington (D.C.) Hospital Rescheduled |
02/02/1999 |
IV-99-03 |
NRC Proposes to Fine Entergy $55,000 for Violation at River Bend Nuclear Plant |
02/02/1999 |
99-19 |
Note to Editors: NRC Received Three Reports from its Advisory Committee on Nuclear Waste |
02/01/1999 |
II-99-06 |
NRC Staff Proposes $8,800 in Fines Against Virginia Well Logging Company |
02/01/1999 |
I-99-10 |
NRC to Meet with the Public on February 9 Regarding Decommissioning of Millstone 1 Nuclear Power Plant |
02/01/1999 |
99-18 |
Note to Editors: NRC's ACMUI Scheduled Two Meetings on February 23-24 and February 25-26 |
02/01/1999 |
99-17 |
Note to Editors: NRC's ACRS Has Scheduled Meeting on February 23 |
January 1999
|
01/29/1999 |
99-16 |
NRC Bars California Company and Two of its Managers from NRC Licensed Activities for Five Years |
01/28/1999 |
99-15 |
Independent Review of Millstone Firings Ordered |
01/28/1999 |
I-99-9 |
NRC, BG&E to Discuss License Renewal Inspection |
01/28/1999 |
99-14 |
Note to Editors: FY2000 Budget Briefing for News Media on Monday, February 1 |
01/27/1999 |
II-99-05 |
NRC Names New Senior Resident Inspector at Brunswick Nuclear Power Plant |
01/26/1999 |
99-13 |
NRC Seeks Public Comment on Proposed Changes to its Reactor Inspection and Oversight Program |
01/26/1999 |
99-12 |
Note to Editors: Agenda Change for ACRS Meeting |
01/26/1999 |
III-99-06 |
NRC Reschedules Meeting for February 5 to Discuss Findings of Inspection into Dec. 9 Fire at Portsmouth Uranium Plant |
01/22/1999 |
I-99-8 |
NRC to Discuss Apparent Violations with Connecticut Hospital |
01/22/1999 |
III-99-05 |
NRC to Hold Public Meeting on Proposal to Terminate License of Shelwell Services, Inc., Hebron, Ohio |
01/22/1999 |
99-11 |
Note to Editors: ACNW Meeting Scheduled for February 23-25 |
01/21/1999 |
I-99-7 |
NRC, PSE&G to Discuss outages Planned for Spring at Two Plants |
01/21/1999 |
II-99-04 |
NRC Staff Sets Enforcement Conference with Duke Energy to Discuss Oconee High Pressure Injection Concerns |
01/21/1999 |
99-10 |
NRC Requests Information from Nuclear Power Plant Licensees About Overall Year 2000 Readiness |
01/14/1999 |
I-99-6 |
NRC Monitoring Unusual Event at FitzPatrick Plant |
01/14/1999 |
I-99-5 |
Note to Editors: Meeting Between NRC and Representatives of Washington Hospital Center Postponed |
01/13/1999 |
III-99-04 |
Meeting On Proposal to Terminate License of Shelwell Services, Inc., Has Been Canceled Because of Severe Weather |
01/13/1999 |
99-09 |
Chairman Jackson Directs Staff Review, Appropriate Corrective Actions Based on Inspector General Report Concerning Millstone |
01/13/1999 |
99-08 |
NRC Proposes to Amend Regulations to Add HI-STAR Fuel Storage Cask Design to Approved List |
01/13/1999 |
99-07 |
NRC Advisory Committee on Reactor Safeguards (ACRS) to Meet in Rockville, Maryland |
01/13/1999 |
99-06 |
Note to Editors: NRC's ACRS Has Scheduled a Meeting on February 2 |
01/13/1999 |
I-99-4 |
NRC Sets Public Meeting on Indian Point 1 Decommissioning Plans |
01/12/1999 |
I-99-3 |
NRC, Washington (D.C.) Hospital to Discuss Apparent Violations |
01/11/1999 |
IV-99-01 |
NRC to Meet with PG&E to Discuss Diablo Canyon Safety Culture |
01/11/1999 |
99-05 |
NRC Staff Schedules Conference March 3-5 to Discuss Regulatory Issues with Nuclear Industry |
01/07/1999 |
99-04 |
NRC Modifies Policy on Enforcement Discretion in Severe Weather Conditions |
01/07/1999 |
I-99-2 |
NRC Names New Resident Inspector at Nine Mile Point Nuclear Plant |
01/07/1999 |
II-99-02 |
NRC Names New Senior Resident Inspector at Summer Nuclear Power Plant |
01/07/1999 |
III-99-02 |
NRC Names New Senior Resident Inspector at Monticello Nuclear Power Plant |
01/07/1999 |
III-99-03 |
Meeting Canceled Because of Severe Weather |
01/06/1999 |
IV-99-02 |
NRC Proposes to Fine Entergy $55,000 for Violation at River Bend Nuclear Plant |
01/06/1999 |
I-99-1 |
Note to Editors: NRC Staff Will Meet with Northeast Nuclear Energy Company Officials on January 11 |
01/06/1999 |
99-03 |
NRC Media Workshop Scheduled February 23-24 |
01/05/1999 |
II-99-01 |
NRC Receives Request from CP&L for Use of Additional Harris Plant Spent Fuel Pools |
01/04/1999 |
99-02 |
Chairman, Vice-Chairman and Member-at-Large Elected to NRC Advisory Committee on Reactor Safeguards |
01/04/1999 |
III-99-01 |
Nuclear Regulatory Commission to Discuss Findings of Inspection Into Dec. 9 Fire at Portsmouth Uranium Plant |
01/04/1999 |
99-01 |
Note to Editors: ACRS Subcommittee Meeting Date and Topic Changed |