2014 Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors. The NRC performs inspections to verify the quality and suitability of vendor products, licensee-vendor interface, and review of equipment problems found during operation and their corrective action.

For inspections and related vendor inspections conducted by Region II for the Mixed Oxide Fuel Fabrication Facility, please reference the Meetings About Mixed Oxide Fuel page.

Prior to December 1999, the NRC issued NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," (The White Book) to document the results of inspections performed by the NRC's Quality Assurance, Vendor Inspection, Maintenance and Allegations Branch that were distributed to the inspected organizations. As of November 1999, these inspection reports are available electronically in the NRC's record retrieval system, ADAMS. The following inspections have been conducted since May 2005:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Inspection
Report Date
Description
TBD

Premier Technology, Inc., Blackfoot, ID, IL, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.

12/08/14

Westinghouse Electric Company, LLC, Newington, NH, limited scope reactive inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.

12/05/14

Curtiss-Wright QualTech NP, Huntsville, Alabama, limited scope reactive inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.

12/04/14

Westinghouse Electric Company, Fuel Handling Equipment and Crane Manufacturing (FHE&CM), Shoreview and Hutchinson, MN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs

11/21/14

Southwest Research Institute, San Antonio, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as they pertain to testing and analysis of nuclear safety related components.

11/21/14

Specialty Maintenance and Construction, Inc. (SMCI), Lakeland, FL, limited scope reactive inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, as they pertain SMCI's implementation of quality activities associated with the fabrication of the remain-in-place steel formwork modules for concrete, in-containment refueling water storage tank wall and reactor vessel cavity modules for the Westinghouse Electric Company's AP1000 reactor design.

11/18/14

Oregon Iron Works, Inc., Clackamas, OR and Vancouver, WA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, as they pertain to the implementation of safety-related activities for U.S. regulated facilities.

11/10/14

RSCC Wire & Cable LLC (RSCC), East Granby, CT., limited scope reactive inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

10/24/14

Chicago Bridge & Iron Power, Charlotte, NC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

10/09/14

Konecranes, Nuclear Equipment and Services LLC. (KNES), New Berlin, Wisconsin, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

10/08/14

Westinghouse Electric Company, Warrendale, PA, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to safety-related activities associated with the development of aspects of the AP-1000 protective monitoring system and subsystems

09/18/14

Doosan Heavy Industries and Construction, Changwon, Korea, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.

09/18/14

Curtiss Wright Flow Control Company, Electro-Mechanical Division (EMD), Cheswick, PA, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to safety-related activities related to the design, manufacture, and qualification testing of the reactor coolant pumps for the AP1000.

09/17/14

Nutherm International, Inc., Mount Vernon, IL, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities, specifically, as it pertains to the qualification and dedication activities associated with class 1E components supplied to operating nuclear power plants.

09/09/14

Curtiss Wright Qualtech NP, Huntsville, AL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs

08/26/14

Valinox Nucleaire Company, Montbard, France, multinational inspection to review implementation of their quality assurance program in accordance with the Multinational Design Evaluation Program (MDEP) Protocol Document. The team will be focused on the review of aspects of their QA program as it pertains to safety-related activities associated with the fabrication of steam generator tubes.

06/24/14

RSCC Wire & Cable LCC., East Granby, CT, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities

06/12/14

Carolina Energy Solutions, Rock Hill, South Carolina, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to activities related to the fabrication of piping for the Westinghouse Electric Company AP1000 reactor design

05/16/14

Specialty Maintenance and Construction, Inc., Lakeland, Florida, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to activities conducted related to the design, manufacture, and qualification testing of components for NRC regulated facilities

05/15/14

Steris Isomedix Services, Whippany, New Jersey, limited scope inspection to assess Steris Isomedixs' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to their irradiation services associated with the qualification of nuclear safety related components

04/25/14

Westinghouse Electric Company (WEC), Cranberry Township, PA, limited scope inspection at your Warrendale facility to assess WEC's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to safety-related activities for US regulated facilities, specifically with the development of aspects of the AP1000 protection and safety monitoring system and subsystems

04/21/14

C&D Technologies, Blue Bell, PA, limited scope inspection to assess C&D Technologies' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to their design process, dedication, and testing of batteries supplied to operating nuclear power plants.

04/11/14

United Controls International, Norcross, Georgia, limited scope inspection to assess United Controls International's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.

04/02/14

Wyle Laboratories, Huntsville, AL, limited scope inspection to assess Wyle Laboratories' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically to observe testing associated with submergence testing of the squib valve actuators being supplied as part of the Westinghouse AP1000 design

03/31/14

Pentair Valves and Controls, Mansfield, MA, follow-up inspection to observe the re-testing of the pressurizer safety valve (PV-62), for the Westinghouse Electric Company (WEC) AP1000 reactor design

03/25/14

Westinghouse Electric Company (WEC), Cranberry Township, PA, limited scope inspection at your Warrenton facility to assess WEC's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to safety-related activities for US regulated facilities. Specifically, the QA program will be reviewed as it pertains to WEC'S implementation of quality activities associated with the development of the AP1000 protection and safety monitoring system and subsystems.

03/21/14

Chicago Bridge & Iron (CB&I), Lake Charles, LA, limited scope inspection to assess CB&I's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to safety-related activities for US regulated facilities.

03/07/14

Enersys, Reading, PA, limited scope inspection at your Hays, Kansas facility to assess Enersys' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to safety-related activities for US regulated facilities. Specifically, the QA program will be reviewed as it pertains to EnerSys' design process, manufacturing, and testing for batteries supplied to operating nuclear power plants and the design, qualification, and testing program for batteries being qualified for the AP1000 new reactor design.

01/29/14

Rosemount Nuclear Instruments, Inc. (Rosemount), Chanhassen, Minnesota, limited scope inspection to assess Rosemounts' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to safety-related activities for US regulated facilities.

01/22/14

Wyle Laboratories, Huntsville, Alabama, limited scope inspection to assess Wyle Laboratories' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 as it pertains to functional and qualification testing of the squib valves for the Westinghouse AP1000 design. The inspectors will also review implementation of your corrective actions to issues identified in Inspection Report 99900905/2012-201