2020 Inspection Reports

The purpose of inspection reports is to document the inspection scope, observation, and findings of inspections conducted by the NRC. The NRC performs inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors. The NRC performs inspections to verify the quality and suitability of vendor products, licensee-vendor interface, and review of equipment problems found during operation and their corrective action.

For inspections and related vendor inspections conducted by Region II for the Mixed Oxide Fuel Fabrication Facility, please reference the Meetings About Mixed Oxide Fuel page.

Prior to December 1999, the NRC issued NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report," (The White Book) to document the results of inspections performed by the NRC's Quality Assurance, Vendor Inspection, Maintenance and Allegations Branch that were distributed to the inspected organizations. As of November 1999, these inspection reports are available electronically in the NRC's record retrieval system, ADAMS. The following inspections have been conducted since May 2005:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Inspection
Report Date
Description
12/18/2020

Framatome Fuel Facility, Richland, WA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the design, fabrication, corrective actions, and testing of fuel assemblies for NRC’s regulated facilities.

12/15/2020

Lake Engineering, Greenville, RI, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to the design, fabrication, testing, and commercial-grade dedication of safety-related snubber components and services for the operating nuclear power plants.

12/01/2020

SAFER PEICO, Phoenix, AZ, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, as they pertain to implementation of the storing, handling, and supplying of portable equipment to be used by licensees to comply with 10 CFR 50.155, "Mitigation of beyond-design-basis events" and NRC Order EA-12-049 (ADAMS Accession No. ML12056A045).

11/13/2020

Ametek Solidstate Controls, Columbus, OH, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to Ametek's design, fabrication, testing, and commercial-grade dedication of safety related components to operating nuclear power plants.

10/14/2020

C&D Technologies, Blue Bell, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at your facility of services supplied to NRC's regulated facilities.

10/14/2020

EnerSys, Reading, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, the quality assurance program and Part 21 implementation, will be reviewed as they pertain to their design, fabrication, testing, and commercial-grade dedication of safety-related components to operating nuclear power plants.

08/04/2020

Valcor Engineering Corporation, Springfield, NJ, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at your facility related to the design, fabrication, assembly, and testing of valves and replacement valve parts for NRC’s regulated facilities.

04/22/2020

Framatome, Lynchburg, VA, follow-up limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, as they pertain to Framatome’s activities associated to the unresolved item (URI) 99901300/2019-201-01 documented in inspection report No. 99901300/2019-201 dated September 20, 2019 (ADAMS As session No. ML19261A188).

04/03/2020

EnerSys, Hays, KS, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, as they pertain to the fabrication, assembly, and testing of safety-related batteries and components being supplied to the U.S. operating nuclear power plants.

  • No Announcement Letter
  • No Response Required
04/03/2020

ASCO, L.P., Aiken, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, as they pertain to the design, fabrication, testing, and commercial-grade dedication of safety-related solenoid valves to operating nuclear power plants.

04/02/2020

Westinghouse, New Stanton, PA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to WEC’s testing of safety-related components that comprise the uninterruptable power supply system for the AP1000 reactors currently under construction at Vogtle Units 3 and 4.

03/25/2020

Sargent & Lundy, Chicago, IL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically, as they pertain to activities conducted at their facility of services supplied to NRC's regulated facilities.

02/26/2020

Westinghouse Electric Company, Hopkins, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the design, fabrication, assembly, and testing of fuel assemblies for NRC’s regulated facilities.

01/27/2020

Rosemount Nuclear Instruments, Inc., Chanhassen, MN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs.

01/22/2020

Bechtel Power Corporation, Reston, VA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to Bechtel’s design, qualification, and commercial-grade dedication activities related to basic components supplied to U.S. NRC regulated facilities.

01/08/2020

Fisher Controls International, LLC, Marshalltown, IA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the quality activities associated with the design, fabrication, assembly, and testing of valves, actuators, actuator accessories, replacement parts and/or appurtenances being supplied to US Nuclear Power Plants.